Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 CrAdmitted-Finance | ₹7.8 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical F 33 3 OKHLA INDUSTRIAL AREA PHASE 2 DELHI 110020 | SOUTH | DELHI | 110020 | - | - | Rejected-Technical Not Eligible for Opening of Financial Bids |
| 3 | Rejected-Technical 8 C 1 SECTOR NO 21 MIHAN AREA NAGPUR | NAGPUR | NAGPUR | MAHARASHTRA | - | - | Rejected-Technical Not Eligible for Opening of Financial Bids |
| 4 | Rejected-Technical MONARCH HOUSE CTS NO 434 1 B T KAWADE ROAD NEAR KAWADE PETROL PUMP GHORPADI PUNE 411 036 MAHARASHTRA | PUNE | PUNE | MAHARASHTRA | 411036 | - | - | Rejected-Technical Not Eligible for Opening of Financial Bids |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Eligible for Opening of Financial Bids |
| Sl No | Description | Qty | Unit | SA Infrastructure Consutants Pvt. Ltd. L1 |
|---|---|---|---|---|
| 1.00Remuneration for Local Staff (inclusive of per Diem allowance) | ||||
| 2.00PROFESSIONAL Staff | ||||
| 3.00 | Team Leader cum Senior Highway Engineer | 6 | Man Months | 8,50,000 ₹51 L |
| 4.00 | Senior Bridge Engineer/ Structural Engineer | 4 | Man Months | 6,80,000 ₹27.2 L |
| 5.00 | Highway Engineer cum Pavement Engineer | 4 | Man Months | 6,80,000 ₹27.2 L |
| 6.00 | Material-cum-Geo-technical Engineer -Geologist | 5 | Man Months | 6,80,000 ₹34 L |
| 7.00 | Senior Survey Engineer | 6 | Man Months | 4,50,000 ₹27 L |
| 8.00 | Traffic and Safety Expert | 4 | Man Months | 7,00,000 ₹28 L |
| 9.00 | Environmental Specialist | 2 | Man Months | 4,25,000 ₹8.5 L |
| 10.00 | Quantity Surveyor/ Documentation Expert | 5 | Man Months | 4,25,000 ₹21.3 L |
Tender Value
Refer Docs
Closing Date
15 Dec 2025, 3:00 pmClosed
Subodh Kumar
NHIDCL HQ New Delhi
Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Construction of 4-Lane with Paved Shoulder from Phulbari to Shillong in the State of Meghalaya
2025_NHIDC_883828_1
NHIDCL/Meghalaya /Phulbari-Shillong/DPR/2025/
Open Tender
Consultancy
180 days
Meghalaya
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
Exempted
NHIDCL HQ New Delhi
22 Jun 2026
3 Nov 2025
16 Dec 2025
3 Nov 2025
15 Dec 2025
1 Dec 2025
5 Nov 2025 - 21 Nov 2025
24 Nov 2025
Remuneration for Local Staff (inclusive of per Diem allowance)
PROFESSIONAL Staff
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specialist
Quantity Surveyor/ Documentation Expert
Land Acquistion Expert
Utility Expert
Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment out of which 3 nos. sub-professional having 3 years experience and 2 nos. sub-professional be a fresh graduate)
Support Staff (Fixed Rates)
Office Boy (1 No.)
Transportation (Fixed Costs)
Duty Travel to Site (Fixed Costs)
Office Rent (Fixed Costs)
Office Supplies, Utilities and Communication (Fixed Costs)
Office Furniture and Equipment (Fixed costs)
Reports and Document (Fixed costs)
Survey and Investigation
A. Topographical Survey (Fixed Rate)
B. Investigation (Fixed cost)
Net Work Survey and GPR
Sub-soil Investigation & Other Works
Sub-Soil Investigation
a) Boring in all type of soils (other than hard rock)
b) Boring in hard rock
Cost of supply and fixing Boundary Pillars
Land Acquisition Team including support staff and logistics/transportation
A. Land acquisition Team including support staff
B. Logistics for Land acquisition Team
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
RFP.pdf
Tender Documents • 5.51 MB
BOQ_928970.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid