TRD work in connection with Upgradation of Interlocking from Standard I to Standard II (R) with provision of El & MSDAC at Wansjaliya Jn.
02-TRDBVP-2026-27-R
02-TRDBVP-2026-27-R
Open
9 Months
Unknown (Unspecified Location)
₹0
₹1.3 L
15 May 2026
15 May 2026
25 May 2026
Item Breakup - A-Activities
Per Survey, design and preparation of OHE lay out Track plan and SED KM Total 37847.58 Item- 2 Supply and erection of fabricated galvanized steel structure and SPS S No. Item Description of Item Unit Qty Rate Amount No
Supply of fabricated galvanized steel structure MT and SPS
Erection of fabricated galvanized steel structure MT and SPS Total 2502992.96 Item- 3 Digging, casting, grouting of cement concrete foundation S No. Item Description of Item Unit Qty Rate Amount No
Digging, casting, grouting of cement concrete cum foundation Total 1077969.00 Item- 4 Supply and erection of single cantilever assembly complete with insulator S No. Item Description of Item Unit Qty Rate Amount No
Supply of single cantilever assembly complete Numbers 30.00 with insulator
Erection of single cantilever assembly complete Numbers 30.00 with insulator Total 849194.70 Item- 5 Supply and erection of guy rod assembly S No. Item Description of Item Unit Qty Rate Amount No
Supply of guy rod assembly
Erection of guy rod assembly Total 88654.72 Item- 6 Supply and erection of regulating equipment 3 pulley type complete with all accessories S No. Item Description of Item Unit Qty Rate Amount No
Supply of regulating equipment 3 pulley type Numbers complete with all accessories
Erection of regulating equipment 3 pulley type Numbers complete with all accessories Total 337398.30 Supply and erection of material for termination of single/double conductor (including supply of cut Item- 7 in insulator) S No. Item Description of Item Unit Qty Rate Amount No
Supply single/double conductor (including supply of cut in insulator)
Erection single/double conductor (including supply of cut in insulator) Total 147792.47 Item- 8 Supply and erection of 9 ton cut in insulator S No. Item Description of Item Unit Qty Rate Amount No
Supply of 9 ton cut in insulator
Erection of 9 ton cut in insulator Total 85566.90 Item- 9 Adjustment of OHE at overlap/crossover S No. Item Description of Item Unit Qty Rate Amount No BHAVNAGAR DIVISION-ELECTRICAL/WESTERN RLY
Adjustment of OHE at overlap/crossover Total 84193.52 Item- 10 Transfer of OHE from one mast/support to another with adjustment of dropper if any S No. Item Description of Item Unit Qty Rate Amount No
Transfer of OHE from one mast/support to Numbers 25.00 another with adjustment of dropper if any Total 153774.25 Item- 11 Dismantling of single OHE mast by cutting S No. Item Description of Item Unit Qty Rate Amount No
Dismantling of single OHE mast by cutting Total 55903.28 Item- 12 Dismantling of OHE portal S No. Item Description of Item Unit Qty Rate Amount No
Dismantling of OHE portal Total 37194.16 Item- 13 Dismantling of cantilever assembly complete S No. Item Description of Item Unit Qty Rate Amount No
Dismantling of cantilever assembly complete Total 42192.00 Item- 14 Dismantling of guy rod and termination S No. Item Description of Item Unit Qty Rate Amount No
Dismantling of guy rod and termination Total 9046.56 Item- 15 Dismantling of regulating equipment S No. Item Description of Item Unit Qty Rate Amount No
Dismantling of regulating equipment Total 34819.64 Item- 16 Supply and erection of 130 sq.mm copper large span wire for termination S No. Item Description of Item Unit Qty Rate Amount No
Supply of 130 sq.mm copper large span wire for Metre termination
Erection of 130 sq.mm copper large span wire for Metre termination Total 107063.00 Item- 17 Supply and erection of section insulator assembly including core and cut in insulator S No. Item Description of Item Unit Qty Rate Amount No
Supply of section insulator assembly including Numbers core and cut in insulator
Erection of section insulator assembly including Numbers core and cut in insulator Total 72334.34 Item- 18 Shifting, dismantling and removal of isolator S No. Item Description of Item Unit Qty Rate Amount No
Shifting, dismantling and removal of isolator Total 8317.21 Item- 19 Breaking of PCC/concrete/foundation of mast, portal and TTC S No. Item Description of Item Unit Qty Rate Amount No
Breaking of PCC/concrete/foundation of mast, cum portal and TTC BHAVNAGAR DIVISION-ELECTRICAL/WESTERN RLY Total 420372.00 Item- 20 Supply and erection of 160 sq.mm copper jumper wire with PG clamp and related fittings S No. Item Description of Item Unit Qty Rate Amount No
Supply of 160 sq.mm copper jumper wire with PG Numbers 10.00 clamp and related fittings
Erection of 160 sq.mm copper jumper wire with Numbers 10.00 PG clamp and related fittings Total 101885.10 Item- 21 Supply, erection, testing and commissioning of Auxiliary Transformer 25 KV/240 V, 10 KVA S No. Item Description of Item Unit Qty Rate Amount No
Supply of Auxiliary Transformer 25 KV/240 V, 10 Numbers KVA
Erection, testing and commissioning of Auxiliary Numbers Transformer 25 KV/240 V, 10 KVA Total 127679.13 Supply and erection of 25 KV drop out fuse switch assembly complete with fuse carrier & fuse Item- 22 element S No. Item Description of Item Unit Qty Rate Amount No
Supply of 25 kV drop out fuse switch assembly Numbers complete with fuse carrier & fuse element
Erection of 25 kV drop out fuse switch assembly Numbers complete with fuse carrier & fuse element Total 40425.92 Item- 23 Supply and erection of anti climbing device S No. Item Description of Item Unit Qty Rate Amount No
Supply of anti climbing device
Erection of anti climbing device Total 3268.52 Providing LT junction box with HRC fuses along with MCB & 2 Nos MS cramp with nut bolt & washer Item- 24 duly paint complete S No. Item Description of Item Unit Qty Rate Amount No
Providing LT junction box with HRC fuses along Numbers with MCB & 2 Nos MS cramp with nut bolt & washer duly paint complete Total 5633.37 Providing LT junction box for AT price shall be include supply and erection of LV termination box Item- 25 assembly complete S No. Item Description of Item Unit Qty Rate Amount No
Providing LT junction box for AT price shall be Numbers include supply and erection of LV termination box assembly complete Total 3708.24 Erection, testing and commissioning of 2x70 sq.mm control cable with complete lugs/glands and Item- 26 transportation of cable etc. from depot to the site S No. Item Description of Item Unit Qty Rate Amount No
Erection, testing and commissioning of 2x70 Metre sq.mm control cable with complete lugs/glands and transportation of cable etc. from depot to the site Total 29590.00 Item- 27 Digging of cable trench 450 mm wide and 900 mm deep S No. Item Description of Item Unit Qty Rate Amount No BHAVNAGAR DIVISION-ELECTRICAL/WESTERN RLY
Digging of cable trench 450 mm wide and 900 Metre mm deep Total 15066.00 Item- 28 Laying of bricks with sand for digging of cable trench 450 mm wide and 900 mm deep S No. Item Description of Item Unit Qty Rate Amount No
Laying of bricks with sand for digging of cable Metre trench 450 mm wide and 900 mm deep Total 27024.00 Item- 29 Providing GI pipe 100 mm diameter S No. Item Description of Item Unit Qty Rate Amount No
Providing GI pipe 100 mm diameter Total 27054.30 Item- 30 Providing LT cable marker S No. Item Description of Item Unit Qty Rate Amount No
Providing LT cable marker Total 4259.80 Item- 31 Providing 8 SWG GI wire in PVC sleeve with cable complete S No. Item Description of Item Unit Qty Rate Amount No
Providing 8 SWG GI wire in PVC sleeve with cable Metre complete Total 666.20 Supply and erection of automatic CLS panel 63 Amp. Capacity 240 V for 10 kVA AT as per RDSO Item- 32 specifications S No. Item Description of Item Unit Qty Rate Amount No
Supply of automatic CLS panel 63 Amp. Capacity Numbers 240 V for 10 kVA AT as per RDSO specifications
Erection of automatic CLS panel 63 Amp. Numbers Capacity 240 V for 10 kVA AT as per RDSO specifications Total 61389.63 Item- 33 Dismantling of auxiliary transformer with complete assembly S No. Item Description of Item Unit Qty Rate Amount No
Dismantling of auxiliary complete assembly Total 2722.97
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderdocSTDItoSTDII.pdf
ATTACHMENT
ACS1to11.pdf
ATTACHMENT
BGFormet.pdf
ATTACHMENT
Foundation.pdf
ATTACHMENT
Steel Galvanization letter
ATTACHMENT
GCC-April-2022_1.pdf
ATTACHMENT
SteelGalvanization24-03-2025.pdf
ATTACHMENT