Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.8 LAccepted-AOC | ₹45.8 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹47.3 LRejected-AOC | ₹47.3 L | L2 | Rejected-AOC 2nd Lowest |
| Sl No | Description | Qty | Unit | MUHAMMED AFSAL P L2 | BADARUDDEEN K P L1 |
|---|---|---|---|---|---|
| 1.00chamravttom bridge | |||||
| 1.00 | 5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size) | 299.79 | cum | 15,332.2 ₹46.0 L | 14,855.25 ₹44.5 L |
| 1.00 | 5.2.b:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom. | 7,335 | sqm | 16.8 ₹1.2 L | 16.28 ₹1.2 L |
| 1.00 | OD24475/2025-2026:Removal of existing wearing coat upto 25 mm including its disposal complete as per Technical specification without causing any detrimental effect to any part of the bridge structure and removal of dismantled material with all lifts and lead upto 1000m | 159.75 | sqm | 65 ₹10,383.75 | 62.04 ₹9,910.89 |
Tender Value
₹42.0 L
EMD Value
₹50,000
Closing Date
20 Jan 2026, 5:00 pmClosed
Executive Engineer
Chamravattom Project Division, Eswaramangalam, Ponnani
Repair and rectification of Road surface of Chamravattom RCB
2026_Irrig_826855_1
IRR/IA/TR/4922/2025_5_1_1/1
Open Tender
Civil Works - Roads
90 days
Chamravattom RCB
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
₹50,000
13 Mar 2026
9 Jan 2026
23 Jan 2026
9 Jan 2026
20 Jan 2026
9 Jan 2026
chamravttom bridge
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
5.2.b:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom.
OD24475/2025-2026:Removal of existing wearing coat upto 25 mm including its disposal complete as per Technical specification without causing any detrimental effect to any part of the bridge structure and removal of dismantled material with all lifts and lead upto 1000m
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1387180.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.94 MB
BOQ_1387180.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid