Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹20.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹20.4 L+₹2,195.03 (0.11%)Admitted-Fee/PreQual/Technical/Finance | ₹20.4 L+₹2,195.03 (0.11%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹21.0 L+₹60,202.34 (2.95%)Admitted-Fee/PreQual/Technical/Finance PALAKKAD | KERALA | 678001 | ₹21.0 L+₹60,202.34 (2.95%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹21.1 L+₹69,747.87 (3.42%)Admitted-Fee/PreQual/Technical/Finance | ₹21.1 L+₹69,747.87 (3.42%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹21.2 L+₹78,978.89 (3.88%)Admitted-Fee/PreQual/Technical/Finance | ₹21.2 L+₹78,978.89 (3.88%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | anil kumar L4 | varadan L1 | govind L2 | Krishnakumar.g L5 | BIJO KURIAKOSE L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Road Construction | ||||||||
| 1.00 | 2.1:Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means | 0.02 | Hectare | 47,091.13 ₹1,036 | 10,000 ₹220 Lowest | 47,091 ₹1,036 | 47,091 ₹1,036 | 25,500 ₹561 |
| 1.00 | OD457366/2025-2026:od1614204/2021_2022 :Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all
lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement
of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 11.7 | cum | 1,311.65 ₹15,346.31 | 1,297 ₹15,174.9 | 1,311.65 ₹15,346.31 | 1,311.64 ₹15,346.19 | 1,250 ₹14,625 Lowest |
| 1.00 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | 162 | cum | 3,750.64 ₹6,07,603.68 | 3,750 ₹6,07,500 | 3,750.64 ₹6,07,603.68 | 3,750 ₹6,07,500 | 3,600 ₹5,83,200 Lowest |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 1,080 | sqm | 80.37 ₹86,799.6 | 70 ₹75,600 Lowest | 80.37 ₹86,799.6 | 80 ₹86,400 | 130 ₹1,40,400 |
| 1.00 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,080 | sqm | 18.89 ₹20,401.2 | 17 ₹18,360 Lowest | 18.8 ₹20,304 | 18.8 ₹20,304 | 26 ₹28,080 |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65) | 1,080 | sqm | 289.21 ₹3,12,346.8 | 275 ₹2,97,000 Lowest | 285 ₹3,07,800 | 289 ₹3,12,120 | 300 ₹3,24,000 |
| 1.01 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 21.6 | cum | 9,186.73 ₹1,98,433.37 | 10,000 ₹2,16,000 | 9,180 ₹1,98,288 | 9,186 ₹1,98,417.6 | 9,050 ₹1,95,480 Lowest |
| 1.01 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | 43.92 | cum | 941.83 ₹41,365.17 | 900 ₹39,528 | 940 ₹41,284.8 | 941 ₹41,328.72 | 890 ₹39,088.8 Lowest |
| 1.01 | 75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 104.31 | cum | 6,750 ₹7,04,092.5 | 6,300 ₹6,57,153 | 6,150 ₹6,41,506.5 Lowest | 6,847 ₹7,14,210.57 | 6,300 ₹6,57,153 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
9 Sept 2026, 5:00 pmClosed
ASSISTANT ENGINEER
O/O OF EXECUTIVE ENGINEER DISTRICT PANCHAYAT ALAPPUZHA
RE TENDER 415 Annual Plan Alappuzha Jilla Panchayath 2025 26 Pro No 904 26 Paandyalayam Puthuval Nikarth Road Construction Aroor Division Aroor Grama Panchayath Ward 14 General Civil Work
2026_LSGD_866738_22
JP/JULY/FRESH/LIDEW/ALPY/26-27
Open Tender
Civil Works - Roads
Item Rate
270 days
ALAPPUZHA DP
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
11 Sept 2026
31 Aug 2026
11 Sept 2026
31 Aug 2026
9 Sept 2026
31 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road Construction | |||||
| 1.001 | 2.1:Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means | - | Hectare | - | - |
| 1.002 | OD457366/2025-2026:od1614204/2021_2022 :Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all
lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement
of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 1 | cum | - | - |
| 1.003 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | - | cum | - | - |
| 1.004 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | - | sqm | - | - |
| 1.005 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | - | sqm | - | - |
| 1.006 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65) | - | sqm | - | - |
| 1.007 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | - | cum | - | - |
| 1.008 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | - | cum | - | - |
| 1.009 | 75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | - | cum | - | - |
stage.html
html • 0.02 MB
finance_1467704.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tendernotice_2.pdf
PDF • 0.46 MB
Tendernotice_3.pdf
PDF • 0.10 MB
Tendernotice_4.pdf
PDF • 0.26 MB
Tendernotice_5.pdf
PDF • 0.07 MB
SBD.pdf
Tender Documents • 2.17 MB
NIT.pdf
Tender Documents • 0.02 MB
BOQ_1467704.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .