Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 | |
| 3 | Rejected-Technical NEERADAM HOUSE MORAZHA | KANNUR | KERALA | 670001 | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | MANOHARAN PV L2 | GEO MATHEW L1 | Sathchith R C L3 |
|---|---|---|---|---|---|---|
| 1.00CIVIL WORKS | ||||||
| 1.00 | 15.56
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 448.13 | sqm | 50 ₹22,406.3 | 49.73 ₹22,285.31 Lowest | 58 ₹25,991.31 |
| 1.00 | 22.6
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be lessthan 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured). | 448.13 | sqm | 685 ₹3,06,966.31 | 643.43 ₹2,88,337.71 Lowest | 710 ₹3,18,169.46 |
| 1.00 | OD15881/2025-2026
Rooftop plastering with 12mm cement plaster finished with a floating coat of neat cement of mix 1:3 (1 cement : 3 fine sand). (Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the
manufacturers). | 387.35 | sqm | 435 ₹1,68,495.51 | 412.89 ₹1,59,931.29 Lowest | 442 ₹1,71,206.93 |
| 1.00 | 13.1.1
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand). | 60.78 | sqm | 342 ₹20,786.76 | 325.44 ₹19,780.24 Lowest | 350 ₹21,273 |
| 1.00 | OD20714/2025-2026
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.75 ltr/10 sqm). | 60.78 | sqm | 165 ₹10,028.7 Lowest | 179.2 ₹10,891.78 | 175 ₹10,636.5 |
Tender Value
₹5.3 L
EMD Value
₹13,300
Closing Date
23 Jul 2025, 5:00 pmClosed
Chairman and Managing Director KPHCC
KERALA POLICE HOUSING AND CONSTRUCTION CORPORATION LTD CHANDRASEKHARAN NAIR STADIUM, PALAYAM, THIRUVANANTHAPURAM - 695033
Repair and Maintenance (Water Proofing) Work in Lower Subordinate Quarters in Taliparamba Police Station, Kannur Rural (DSR 2021)
2025_KPHCC_777048_3
NIT No.40/KPHCC/2025-26
Open Tender
Civil Works - Buildings
Item Rate
30 days
Kannur
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,300
₹13,300
18 Aug 2025
16 Jul 2025
25 Jul 2025
16 Jul 2025
23 Jul 2025
16 Jul 2025
Amount
CIVIL WORKS
15.56 Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
22.6 Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be lessthan 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured).
OD15881/2025-2026 Rooftop plastering with 12mm cement plaster finished with a floating coat of neat cement of mix 1:3 (1 cement : 3 fine sand). (Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers).
13.1.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand).
OD20714/2025-2026 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.75 ltr/10 sqm).
MANOHARAN PV (BID ID -2258684)
Sathchith R C (BID ID -2258706)
Bidder Name
MANOHARAN PV
GEO MATHEW
Sathchith R C
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1270780.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .