| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 Cr+₹2.4 L (1.42%)Rejected-AOC | ₹1.7 Cr+₹2.4 L (1.42%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.7 Cr+₹4.6 L (2.71%)Rejected-Finance | ₹1.7 Cr+₹4.6 L (2.71%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.8 Cr+₹7.2 L (4.24%)Rejected-Finance | ₹1.8 Cr+₹7.2 L (4.24%) | L4 | Rejected-Finance L4 |
Tender Value
₹2.0 Cr
EMD Value
₹50,000
Closing Date
27 Sept 2022, 3:00 pmClosed
Superintending Engineer
P H Circle, KWA, Kottayam
JJM- Phase II- Veliyanoor Panchayat- Balance work Kottayam District-Laying pipelines and Providing FHTCs
2022_KWA_509337_1
20/SE/PHCK/2022-2023
Open Tender
Civil Works - Water Works
Item Rate
180 days
Veliyanoor
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,515
₹50,000
10 Nov 2022
20 Sept 2022
30 Sept 2022
20 Sept 2022
27 Sept 2022
20 Sept 2022
Amount
Cost of materials
OD381/2022-2023:od321175/2021-2022 Supply 65mm GI Pipe
OD387/2022-2023:od321176/2021_2022 :Supply of 50mm GI (Medium) pipe
100.98.221:Supply of PVC Pipe, 8kg/cm2, 63mm Dia.
100.98.223:Supply of PVC Pipe, 8kg/cm2, 90mm Dia.
OD398/2022-2023:od321202/2021_2022 :Cost for PVC specials (3% of cost of PVC pipe)
100.98.440:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 25mm.
18.17.4:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :50 mm nominal bore
18.17.5:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :65 mm nominal bore
100.98.457:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 80mm.
Working charges
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge.
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock.
100.2.7:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited.
100.1.9:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock Requiring Blasting.
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.12.6:Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc., but excluding cost of pipes and fittings for External work: 50mm diameter nominal bore.
100.12.7:Conveying and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc., but excluding cost of pipes and fittings for External work: 65mm diameter nominal bore.
100.9.6:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 63 mm nominal outside diameter pipes.
100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes.
100.31.1.1:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 80mm diameter, Class I.
100.32.1:Conveying and fixing C. I. Single Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 25mm Single Acting Air Valve.
18.30.1:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:80 mm diameter pipe
100.37.1:Cutting M.S. sheet, pipe and specials by gas cutting including cost of gas, all labour and hire charges of tools etc., complete.
100.37.2:Grinding the cut edges / welded portions in M.S. sheet, pipe and specials by grinding machine including all labour and hire charges of tools etc., complete.
100.37.3:Welding M.S. sheet, pipe and special by gas or electric plant for three run welding including cost of welding rod / gas, all labour and hire charges of tools etc., complete.
OD407/2022-2023:od321181/2021_2022 :Taking connection from 200/160/140/110/90/75/63 mm PVC and 150/125/100/80/65/50mm GI distribution main a branch line using suitable size Tee and reducers including cost of materials labor charge etc complete
OD408/2022-2023:od323461/2021_2022 :Providing Water level indicator assemblying by using float, pully, nylon rope, plumb bob with indicator<br>lamp, MS board (30 cm width) with sufficient depth to show the zero water level and full water level,<br>painting 10 cm divisions, lettering, including cost for clamps, drilling of RCC slabs etc., complete.
OD409/2022-2023:od323500/2021_2022 :Supplying 200mm dia Mechanical flow meter of Woltman type conforming to ISO 4064 class B of ARAD/ZENNER/REYCHEM RPG/ITRON make and shall be tested and certified by FCRI Palakkad and fitting in proper position and alignment as per manufactures instruction
16.42:Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
16.78.3:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With material conforming to Grade - III ( size range 26.5 mm to 0.075 mm) having CBR Value - 20
Providing FHTC - 600 Nos
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge.
100.60.1.4.2: Providing 15mm (1/2 inch) house connection with 15mm (1/2 inch) water meter from existing AC / GI mains up to 125 mm dia., up to a length of 5 m using 20mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, FTA, couplers, GI / MS / SS Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges, including the cost of tested Class B Multijet water meter with ISI mark and weather resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers.
100.60.3.1.1:Providing additional length of house connection pipe using 20mm Indian Standard Class 6 uPVC pipe and specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of materials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers
100.60.10.4.1:Providing 20mm (1/2 inch) PVC Air Valve in the water meter assembly for 15mm connection, using 20mm Indian Standard Class 6 uPVC pipes and specials including cost of materials, consumables, hire for tools and labour charges etc. complete and as per the directions of the department officers.
100.60.12.3.1:Providing 15mm PVC Tap in the water meter assembly for 15mm connection, using 20mm Indian Standard Class 6 uPVC pipes and specials including cost of materials, consumables, hire charges for tools and labour charges etc. complete and as per the direction of departmental officers.
16.42:Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete
BMBC ROAD RESTORATION
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size)
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
PWD RESTORATION
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
3.18:Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
5.7.1:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) aggregates using viscosity grade bitumen ( VG - 30) to the required line, grade, and level to serve as wearing course on a previously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 75 tonnes/hour., laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to the required level and grade.
BIJU K THOMAS
E.V.Benny
Manoj ca
Bidder Name
BIJU K THOMAS
Manoj ca
BYJU JOSEPH
E.V.Benny
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_729470.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .