| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹36.5 LAccepted-AOC 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | ₹36.5 L Quoted ₹36.7 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹36.8 LRejected-AOC III 6 7 2ND FLOOR ABOVE BANK OF BARODA GOPINATH BAZAR DELHI CANTT 110 010 | DELHI CANTT | NEW DELHI | DELHI | 110010 | ₹36.8 L | L-2 | Rejected-AOC L-2 |
| 3 | L-3₹39.5 LRejected-AOC A 3 257 JANAKPURI NEW DELHI 110058 | WEST DELHI | DELHI | 110058 | ₹39.5 L | L-3 | Rejected-AOC L-3 |
| 4 | L-4₹44.4 LRejected-AOC | ₹44.4 L | L-4 | Rejected-AOC L-4 |
| Sl No | Description | Qty | Unit | M/s Dhapola Elevator and Engineering L1 | MB Enterprises L2 | Iconic Engineers L4 | M/S ADHIKARI CONSTRUCTION CO. L3 |
|---|---|---|---|---|---|---|---|
| 1.00comprehensive maintenance (Routine, preventive, periodical and breakdown) of Passenger/ goods/ service Lifts of make Schindler/Thyssen Krupp/Otis/Evaan Elevators Pvt. Ltd/JONSON/OMEGA/KONE installed in following bldgs at residential/lab area zone B/ Parachute Bldg as mentioned here-in-after, in reliable, safe and efficient manner using latest techniques & expertise through OEM by regularly examining, lubricating and adjusting the mechanical and electrical driving equipments/componentents, governor sleeve, shaft assembly, bearing/contact, governor jaws, car & hall mechanical push buttons, car & hall position indicators, car direction indicators, car and landing door drive/sensor and all other car and landing signal/ fixtures, deflectors, car and counter weight guide rails and buffers travelling cable etc with and including replacement of defective / spares parts mentioned in BOQ/Sch - 'A' and replacement of all kind of defective / spares parts other than mentioned in BOQ/Sch - 'A' i.e. car/landing door sill, lift coil, lever bell crank, fuse holder, transformer, rack harness, guide shoe, light shield, any type of diode panel, push button assembly guide operator, kit door, bush bearing, copper contacts, line brakes, sight guard, any type of glass for hall button, emergency light, fireman control switch/ glass, announcement system, all type of safety, mounting sundrise, wire, lugs, nut, bolts, screws, lubricant, gear oil, aircord, landing wheel, aircord wheel, all types of control cards/logic cards, rewinding of motors(Main & Doors) etc and all machine works i.e. welding, cutting, drilling etc or any other parts/components which is not included above as and when required to keeping the lifts in serviceable conditions round the clock (on all days including holidays) and during all weather/climate conditions to the entire satisfaction of Engineer-in-charge, complete all as directed for following Lifts. | |||||||
| 2.00 | Passenger lift No 1 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 7 floors) installed at Type II and Type III Block including all instruments and controls complete all as specified and directed.(Make of Lift- Schindler) | 11 | Per Month | 16,500 ₹1.8 L | 18,000 ₹2.0 L | 23,000 ₹2.5 L | 19,999 ₹2.2 L |
| 3.00 | Passenger lift No 2 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 7 floors) installed at Type II and Type III Block including all instruments and controls complete all as specified and directed.(Make of Lift- Schindler) | 11 | Per Month | 16,500 ₹1.8 L | 18,000 ₹2.0 L | 23,000 ₹2.5 L | 19,999 ₹2.2 L |
| 4.00 | Passenger lift No 1 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 5 floors) installed at DSC OR Quarters including all instruments and controls complete all as specified and directed .(Make of Lift- Thyssen Krupp) | 11 | Per Month | 15,500 ₹1.7 L | 12,000 ₹1.3 L | 10,000 ₹1.1 L | 19,999 ₹2.2 L |
| 5.00 | Passenger lift No 2 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 5 floors) installed at DSC OR Quarters including all instruments and controls complete all as specified and directed .(Make of Lift- Thyssen Krupp) | 11 | Per Month | 9,800 ₹1.1 L | 12,000 ₹1.3 L | 10,000 ₹1.1 L | 19,999 ₹2.2 L |
| 6.00 | Passenger lift No 1 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 5 floors) installed at JCO Quarters including all instruments and controls complete all as specified and directed .(Make of Lift- Thyssen Krupp) | 11 | Per Month | 10,500 ₹1.2 L | 12,000 ₹1.3 L | 10,000 ₹1.1 L | 19,999 ₹2.2 L |
| 7.00 | Passenger lift No 2 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 5 floors) installed at JCO Quarters including all instruments and controls complete all as specified and directed .(Make of Lift- Thyssen Krupp) | 11 | Per Month | 8,500 ₹93,500 | 12,000 ₹1.3 L | 10,000 ₹1.1 L | 19,999 ₹2.2 L |
| 8.00 | Passenger lift No 1 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 4 floors) installed at RAC Main building including all instruments and controls complete all as specified and directed .(Make of Lift- Otis) | 11 | Per Month | 18,500 ₹2.0 L | 15,000 ₹1.6 L | 20,000 ₹2.2 L | 19,999 ₹2.2 L |
| 9.00 | Passenger lift No 2 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 4 floors) installed at RAC Main building including all instruments and controls complete all as specified and directed .(Make of Lift- Otis) | 11 | Per Month | 18,500 ₹2.0 L | 15,000 ₹1.6 L | 20,000 ₹2.2 L | 19,999 ₹2.2 L |
| 10.00 | Passenger lift No 1 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 3 floors) installed at DIPR Main building including all instruments and controls complete all as specified and directed. (Make of Lift- Evaan Elevators Pvt. Ltd) | 11 | Per Month | 10,500 ₹1.2 L | 12,000 ₹1.3 L | 10,000 ₹1.1 L | 9,999 ₹1.1 L |
Updated dates
Tender Value
₹49.8 L
EMD Value
₹1 L
Closing Date
14 Jan 2026, 6:00 pmClosed
GE I RND Delhi
MILITARY ENGINEER SERVICES GARRISON ENGINEER I RND LUCKNOW ROAD TIMARPUR DELHI 110054
COMPREHENSIVE MAINTENANCE AMC OF LIFT IN RESIDENTIAL LAB AREA AT ZONE B IN KWC AREA AT DELHI AND PARACHUTE BLDG AT ADRDE AGRA 01 No UNDER GE I RnD DELHI
2025_MES_744697_1
GE/RND/T-107/DLI/2025-2026
Open Tender
Civil Works
330 days
Delhi
Class-D, Cat- c (ii)
2 documents required · 2 mandatory
₹500
GE I RND Delhi
₹1 L
12 Mar 2026
16 Dec 2025
16 Jan 2026
16 Dec 2025
14 Jan 2026
31 Dec 2025
Passenger lift No 1 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 5 floors) installed at DIPR Technical BLDG including all instruments and controls complete all as specified and directed .(Make of Lift- Evaan Elevators Pvt. Ltd)
hall be provided on the controller which shall be designed to protect the lift equipment against phase reversal and phase failure. The controller shall be designed to cut off the power supply, apply the brake and bring the car to a rest in the event of any of the above failures occurring. System should automatically restart when power is restored. System memory should be retained in the event of power failure or disturbance. Lifts should not go in to correction mode or correction run to the lowest floor / highest floor to update its position & memory. The controlled panel should be compatiable as per existing controlled system and should be recommended as per OEM of existng Lift complete all as specified and as directed. Note: Cotractor Shall be submitted techanical data sheet of Control panel before procurement for approval.
Passenger lift No 1 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 7 floors) installed at Type II and Type III Block including all instruments and controls complete all as specified and directed.(Make of Lift- Schindler)
Passenger lift No 2 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 7 floors) installed at Type II and Type III Block including all instruments and controls complete all as specified and directed.(Make of Lift- Schindler)
Taking out existing unserviceable COP 8/13 passenger cum goods (G+7 floors) lift assembly after disconnected all electrical and control wiring connection carefully and supply & fixing new car operating panel (COP) assembly with and including illuminated push button for floor position, alarm, nonstop, door stop, door close, cabin fan, cabin light stop, attendant out key etc, direction indicator of 7 segment display with SPI card on stainless steel face plate duly controlled and electric connection, also including necessary wiring for laminated push button of each floor, cutting wall, making good the surfaces to match with the existing surfaces, suitable for Goods/Passenger lift. complete all as specified and directed. Note: the COP should be compatiable as per existing lift control system and should be recommended as per OEM of existing lift.
Passenger lift No 1 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 5 floors) installed at DSC OR Quarters including all instruments and controls complete all as specified and directed .(Make of Lift- Thyssen Krupp)
Passenger lift No 1 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 5 floors) installed at JCO Quarters including all instruments and controls complete all as specified and directed .(Make of Lift- Thyssen Krupp)
Passenger lift No 2 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 5 floors) installed at JCO Quarters including all instruments and controls complete all as specified and directed .(Make of Lift- Thyssen Krupp)
Passenger lift No 1 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 3 floors) installed at DIPR Main building including all instruments and controls complete all as specified and directed. (Make of Lift- Evaan Elevators Pvt. Ltd)
Passenger lift No 1 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 4 floors) installed at RAC Main building including all instruments and controls complete all as specified and directed .(Make of Lift- Otis)
Passenger lift No 2 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 5 floors) installed at DSC OR Quarters including all instruments and controls complete all as specified and directed .(Make of Lift- Thyssen Krupp)
Passenger lift No 2 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 4 floors) installed at RAC Main building including all instruments and controls complete all as specified and directed .(Make of Lift- Otis)
Passenger lift No 1 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 5 floors) installed at DIPR Technical BLDG including all instruments and controls complete all as specified and directed .(Make of Lift- Evaan Elevators Pvt. Ltd)
Passenger lift No 1 of capacity 10 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 7 floors) installed at P-28 Block including all instruments and controls complete all as specified and directed.(Make of Lift- Evaan Elevators Pvt. Ltd.)
Passenger lift No 2 of capacity 10 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 7 floors) installed at P-28 Block including all instruments and controls complete all as specified and directed.(Make of Lift- Evaan Elevators Pvt. Ltd.)
Goods lift No 1 of capacity 1000 kgs with traveling speed of upto 1.0 mtrs/sec, (Ground + 7 floors) installed at P-25 Block including all instruments and controls complete all as specified and directed (Make of Lift-Evaan Elevators Pvt. Ltd. )
Passenger lift No 2 of capacity 13 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 7 floors) installed at P-25 Block including all instruments and controls complete all as specified and directed.(Make of Lift-Evaan Elevators Pvt. Ltd.)
Passenger lift No 1 of capacity 08 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 3 floors) installed at DIPAS Block including all instruments and controls complete all as specified and directed.(Make of Lift- JONSON)
Compehensive maintenance of lift including carrying out and periodical servies of KONE Make automatically goods lift (2000 Kg) installed at "Parachute Bidg" for 3 floors (Ground+2) complete with repair/replacement of unserviceable parts. complete all as specified and directed. (Make of Lift- OMEGA.)
Taking down carefully existing old false ceiling with fan grill & LED up to 08/10 passenger lift and supply & fixing new false ceiling made of 1.2mm thick stainless steel with hair line finish (N-304) fitted with aluminium square fan with grill & 10/12 watt LED at 4 Nos, through OEM/authorised vander of existing OEM lift make complete all as specified and directed.
Taking out existing old defective door sensor and supply & fixing new sensor with 3D INFRA RED safety edge with power unit on car door to safeguard passenger entering and leaving the lift suitable for 08/10/13/20 passenger capacity lift complete all as specified and directed.
Taking down existing unserviceble batteries from machine room and supply & fixing new sealed maintenance free (SMF) batteries of 12 volts, 18 AH, making necessary connections with and including copper lead to connect brass terminals of batteries, complete all as specified and directed.
Taking down existing unserviceble batteries from machine room and supply & fixing new sealed maintenance free (SMF) batteries of 12 volts, 07 AH, making necessary connections with and including copper lead to connect brass terminals of batteries, complete all as specified and directed.
Taking out existing unserviceable cabin fan and supply & fixing new cabin fan, non-oscilating type, axial flow, single speed, 250mm to 300mm sweep, 240 volt, with grill, complete all as specified and directed.
Takingout existing old unserviceable control panel upto 08/10/13 passenger existing lift after disconnected all electrical and control wiring connection carefully and supply, installation, testing and commissioning new control panal with microprocessor based AC variable voltage variable frequency (ACVVVF) drive close loop. The lift controller shall be wall/floor mounted, vertical, totally enclosed cubicle type with hinged doors on the front and/or the rear to provide easy access to all components in the controller. The cubicle shall be well ventilated such that the temperature inside never exceeds the safe limits of the components at ambient room conditions in the machine room. The controller shall operate within the supply voltage variation of plus 10% to minus 10% of the nominal voltage. An inbuilt voltage stabilizer shall be provided in the controller for the purpose. The controller shall be complete with relay protection against the following: Over current Under voltage Single phasing Phase reversal Earth leakage Over voltage – 3Phase Spikes & Surges Control panels & drive systems shall be designed to meet the requirements laid down by the EN12015 standards relevant to Electro-Magnetic Compatibility (EMC). Lift motor control system shall be electronic closed-loop control to ensure fail safe motor over speed controls and stopping accuracy of ± 3 mm to ± 5 mm. Load compensation circuits shall also be included to further improve upon the levelling accuracy. The levelling shall be ensured within ± 3 mm to ± 5 mm. An Automatic Phase reversal device s
Taking out old unserviceable Automatic rescue device (ARD) for JCOs/OR accn lifts up to 13 passenger with sealed maintenance free (SMF) batteries of 12 volts, up to 18 AH ( 06nos battery) after disconnected all electrical and control wiring connection carefully and supply, installation, testing and commissioning new Automatic rescue device (ARD) . The ARD shall be wall/floor mounted, vertical, totally enclosed cubicle type with hinged doors on the front and/or the rear to provide easy access to all components in the ARD. The cubicle shall be well ventilated such that the temperature inside never exceeds the safe limits of the components at ambient room conditions in the machine room. The ARD shall operate within the supply voltage variation of plus 10% to minus 10% of the nominal voltage. An inbuilt voltage stabilizer shall be provided in the ARD for the purpose. The ARD shall be complete with relay protection against the following: Over current Under voltage Single phasing Phase reversal Earth leakage Over voltage – 3Phase Spikes & Surges. The ARD should be automatic evacuation to the nearest floor during power failure or other emergencies. All necessary wiring cable and Connectors connections for proper integration with the lift's control system. The ARD should be working correctly and integrating it with the lift's overall existing control system and should be recommended as per OEM of existng Lift complete all as specified and as directed. Note: Cotractor Shall be submitted techanical data sheet of Control panel before procurement for approval.
Taking out existing unserviceable LOP 1st foor to fifth floor up to 8/13 passenger cum goods lift assembly after disconnected all electrical and control wiring connection carefully and supply & fixing new car assembly with and including illuminated push button for floor position, alarm, nonstop, door stop, door close, cabin fan, cabin light stop, attendant out key etc, direction indicator of 7 segment display with SPI card on stainless steel face plate duly controlled and electric connection, also including necessary wiring for laminated push button of each floor, cutting wall, making good the surfaces to match with the existing surfaces, suitable for Goods/Passenger lift. complete all as specified and directed. Note: the LOP should be compatiable as per existing lift control system and should be recommended as per OEM of existing lift.
Passenger lift No 1 of capacity 05 Passenger with traveling speed of upto 1.0 mtrs/sec, (Ground + 3 floors) installed at CFEES NEW BUILDING including all instruments and controls complete all as specified and directed.(Make of Lift- OMEGA.)
Takingout existing defective unserviceable main drive (any type) from existing control panel and supply & fixing new variable voltage, variable frequency drive (VVVF) of upto 15 KW suitable for EXISTING LIFT and including making necessary electric connection, complete all as specified and directed.
Taking out existing light fittings from lift cabin and in lieu S & F New LED light fittings, 16 Watt complete with and including LED, all accessories, fixutres complete all as specified and directed.
Taking out existing old/ defective PVC flooring mat and in lieu S & F New antistatic PVC flooring 3mm thick flame resistance UV coating with superior quality and thickness of mat 3 mm dully solution/ adhesive after scraping ,cleaning surface preparing of old surface and colour/design of mat shall be approved by Engr-in -charge a complete all as specified and directed .
Material and labour for removal of dust, stains, marks, scratches on the stainless steel surface of car cabin including ceiling and carry out the scrubbing, polishing & buffing of stainless steel surface with the help of stainless steel polish liquid and buffing tool to give the glossy and clean finish to lift cabin surfaces of 08 to 13 passengers lift complete all as specified and directed.
Material and labour for removal of dust, stains, marks, scratches on the stainless steel surface of car door/ landing door and carry out the scrubbing, polishing & buffing of stainless steel surface with the help of stainless steel polish liquid and buffing tool to give the glossy and clean finish to doors& facia srufaces of 08 to13 passengers lift complete all as specified and directed.
Takingout existing unserviceable hoist steel wire rope after disconnecting from counter weight pulley and car cabin and supply & fix new steel wire rope 13 mm dia, ungalvanised 8/19 construction, conforming to IS-14665 including making necessary connection with weigh, pully and car cabin GI clamps, nuts, bolts, washers etc complete all as specified and directed.
Taking out existing unserviceable hoist steel wire rope after disconnecting from counter weight pulley and car cabin and supply & fix new steel wire rope 10 mm dia, ungalvanised 8/19 construction, conforming to IS-14665 including making necessary connection with weigh, pully and car cabin GI clamps, nuts, bolts, washers etc complete all as specified and directed.
Supply, installation and testing of automatic voice annoucement system, these system audibly announce, floor arrivals, door movements, (open & close), overload alerts, lift directional (i.e going up & going down), power failure or other emergency notifications etc as directed the system should be installed by OEM of existing make lift in and including speakers, control copper wiring, duly compatiable as per existing lift control system complete with all necessary accessories and connections required for proper function of above voice announcement system complete all as specified and as directed.
(e) All the complaint(s) will be addressed within 02 hrs from the time of receipt of complaint. If, contractor or his tradesmen fails to attend the complaint within 02 hrs from the time of receipt of complaint, the compensation/penalty of Rs. 500.00 (Rupees Five Hundred only) per complaint per hr for first 04 hrs and after that Rs 1000 00 (Rupees One Thousand Only) per complaint per hr shall be recovered from the contractor's dues. (f) The cost of transportation (to and from) and other necessary equipment shall be arranged / brought by contractor to complete the job and no extra cost shall be paid to the contractor in this effect. (g) All the complaints are required to be rectified within 24 hrs or within stipulated time given by the JE/Engineer-in-Charge, if, contractor of his tradesmen fails to rectify the defects, the compensation of Rs. 1000.00 (Rupees one thousand only) per complaint for each date (i.e. 24 hours) shall be recovered from the contractor's dues. The decision of accepting officer is this regard shall be final and binding.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
TDR.pdf
Tender Documents • 1.05 MB
BOQ_833858.xls
BOQ • 1.01 MB
Download all tender documents and submit your bid