Tender Value
₹45.9 L
EMD Value
₹91,900
Closing Date
3 Oct 2026, 12:00 pm
EE RWD CHAMOLI
EE RWD CHAMOLI
The remaining work of renovation and upgradation (phase-2) of the road (Shanti Path) form the main market to the Narsingh Temple in Joshimath development block of chamoli District (Block Joshimath)
2026_RES_100192_3
2138/RWD/14-09-2026
Open Tender
Civil Works
Item Wise
365 days
GOPESHWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Yes
EE RWD CHAMOLI
₹91,900
18 Sept 2026
18 Sept 2026
3 Oct 2026
18 Sept 2026
3 Oct 2026
18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. 15.23.1 For thickness of tiles 10 mm to 25 mm | 76.54 | sqm | - | - |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge In cement mortar | 2.99 | Cu M | - | - |
| 3 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 2,395.25 | kg | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 76.5 | Cu M | - | - |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 2.3 | Cu M | - | - |
| 6 | Coursed rubble masonry (first sort) with hard stone in foundation and plinth with : 7.6.1 Cement mortar 1:6 (1 cement : 6 coarse sand) | 28.69 | Cu M | - | - |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level [ 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) ] | 2.43 | Cu M | - | - |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 5.85 | Cu M | - | - |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 974.97 | Kg | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete | 15.5 | Sq M | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.04 MB
BOQ_118155.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .