Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹50.7 LAccepted-Finance FP 38A GROUND FLOOR PITAMPURA NEW DELHI 110034 | NORTH WEST DELHI | DELHI | 110034 | ₹50.7 L | L 1 | Accepted-Finance Accepted |
| 2 | L 2₹51.7 L+₹99,749 (1.97%)Rejected-Finance BARKOT UTTARKASHI | RUDRA PRAYAG | UTTARAKHAND | 246141 | ₹51.7 L+₹99,749 (1.97%) | L 2 | Rejected-Finance Rejected |
| 3 | L 3₹52.5 L+₹1.8 L (3.56%)Rejected-Finance JHIWAREDI KARBARI DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹52.5 L+₹1.8 L (3.56%) | L 3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | VRISHANK ELECTRICALS L1 | Aarna Electrical And Co L2 | Shashi Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00NON-CENTRALIZED MATERIAL (SUPPLY) | ||||||
| 2.00 | Stay Clamp for SP-23 Double | 66 | Nos | 275 ₹18,150 Lowest | 281 ₹18,546 | 285 ₹18,810 |
| 3.00 | Top Channel Clamp for SP-55 | 93 | Nos | 313 ₹29,109 Lowest | 319 ₹29,667 | 324 ₹30,132 |
| 4.00 | Holding Clamp SP-33 with N&B | 66 | Nos | 246 ₹16,236 Lowest | 251 ₹16,566 | 255 ₹16,830 |
| 5.00 | Bracing Clamp Bottom SP-55 with N&B | 84 | Nos | 335 ₹28,140 Lowest | 342 ₹28,728 | 347 ₹29,148 |
| 6.00 | Stay Clamp for SP-55 with Nut & Bolt | 109 | Nos | 292 ₹31,828 Lowest | 298 ₹32,482 | 302 ₹32,918 |
| 7.00 | Stay Clamp for SP-33 with Nut & Bolt | 60 | Nos | 280 ₹16,800 Lowest | 286 ₹17,160 | 290 ₹17,400 |
| 8.00 | Earth wire clamp for SP-23 with N&B | 36 | Nos | 275 ₹9,900 Lowest | 281 ₹10,116 | 285 ₹10,260 |
| 9.00 | Bracing Clamp for ST SP-33 Top with N&B | 54 | Nos | 245 ₹13,230 Lowest | 250 ₹13,500 | 254 ₹13,716 |
| 10.00 | Earth wire clamp for SP-33 with N&B | 34 | Nos | 275 ₹9,350 Lowest | 281 ₹9,554 | 285 ₹9,690 |
Tender Value
₹50.7 L
EMD Value
₹1.3 L
Closing Date
4 Jun 2026, 3:00 pmClosed
Superintending Engineer
Superintending Engineer EDC Ranikhet
Const. of new 11 KV feeder and Line for evacuation of Power for the Solar Power Plant under S/s Bagwalipokher under EDD Ranikhet
2026_UPCL9_95764_1
EDC(R)-21/2026-27
Open Tender
Electrical Works
Item Wise
90 days
Ranikhet
As per Tender Documents
2 documents required · 2 mandatory
₹5,900
Executive Engineer
₹1.3 L
8 Sept 2026
22 May 2026
5 Jun 2026
22 May 2026
4 Jun 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | NON-CENTRALIZED MATERIAL (SUPPLY) | - | - | - | - |
| 2 | Stay Clamp for SP-23 Double | 66 | Nos | 100 | ₹6,600 |
| 3 | Top Channel Clamp for SP-55 | 93 | Nos | 100 | ₹9,300 |
| 4 | Holding Clamp SP-33 with N&B | 66 | Nos | 100 | ₹6,600 |
| 5 | Bracing Clamp Bottom SP-55 with N&B | 84 | Nos | 100 | ₹8,400 |
| 6 | Stay Clamp for SP-55 with Nut & Bolt | 109 | Nos | 100 | ₹10,900 |
| 7 | Stay Clamp for SP-33 with Nut & Bolt | 60 | Nos | 100 | ₹6,000 |
| 8 | Earth wire clamp for SP-23 with N&B | 36 | Nos | 100 | ₹3,600 |
| 9 | Bracing Clamp for ST SP-33 Top with N&B | 54 | Nos | 100 | ₹5,400 |
| 10 | Earth wire clamp for SP-33 with N&B | 34 | Nos | 100 | ₹3,400 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
TenderDoc35NoSolarBagwalipokher21.pdf
Tender Documents • 0.67 MB
BOQ_113207.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .