GM - Contract
Design, Supply, Installation, Testing, Commissioning and Training for Clean Agent based panel flooding protection system for Traction system of Surat Metro Rail Project Phase-I for Gujarat Metro Rail Corporation Limited
332729
GMRC/TR/GFS/SURAT/2026
Open
Civil Works - Others
Works
Gandhinagar
11 documents required · 10 mandatory · 1 optional
₹25,000
₹3.5 L
7 Aug 2026
7 Aug 2026
7 Aug 2026
29 Aug 2026
7 Aug 2026
Volume-3: Bill of Quantities
Gujarat Metro Rail Corporation (GMRC) Limited
(SPV of Govt. of Gujarat and Govt. of India) Block No.1, First Floor, Karmayogi Bhavan, Behind
Nirman Bhavan, Sector 10/A,
Gandhinagar: 382010,Gujarat, India
Corporate Identification No (CIN): U60200GJ2010SGC059407
GMRC August 2026 1-1 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
This Page Is Intentionally Left Blank
GMRC August 2026 1-2 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
VOLUME B: Bill of Quantities
TABLE OF CONTENTS
1.7 RATES & SUMS TO BE FOR WORK FINISHED COMPLETE......................................................... 1-7
GMRC August 2026 1-3 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
1.1 General Requirements
1.1.1 The Tenderer's attention is drawn to the General Conditions of Contract, Special
Conditions of Contract, Work’s Requirements (General specifications and
Technical Specifications) and Drawings, which are to be read in conjunction with
the Bill of Quantities. This Preamble shall serve as a definitive guide to the
measurement of quantities and payment.
1.1.2 This Contract is for Design, Supply, Installation, Testing, Commissioning and
Training for Clean Agent based panel flooding protection system for Traction
GMRC August 2026 1-4 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
system of Surat Metro Rail Project Phase-I for Gujarat Metro Rail Corporation
Limited. The Contract includes the following but is not limited to:
1.1.2.1 Verification of site data, drawings, programs for execution, schedule of ordering,
schedule of receipt.
1.1.2.2 The procurement of the whole equipment including:
a) tools, testing equipment,
1.1.2.3 The on-site erection and setting to work of the electrical fixed installations
described in the relevant Basic Design documents,
1.1.2.4 The Type testing in NABL accredited LAB, in-plant testing, and acceptance tests,
1.1.2.5 The on-site testing,
1.1.2.6 The commissioning of installation, and acceptance protocols,
1.1.2.7 The supply of relevant documentation mainly including:
a) Installation, execution, and as-built drawings,
b) Test procedures,
c) Maintenance operation manuals: The Contractor is required to submit 3 hard
copies colour (all drawings in A-3) and soft copies of all the documents,
1.1.2.8 Training in India.
1.1.2.9 Design, Supply, Installation, Commissioning and Training for this contract.
1.1.3 Quantities under the Tender have been estimated to cover the above works /
GMRC August 2026 1-5 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
1.2 PROCUREMENT PROGRAM
1.2.1 The Contractor shall submit a detailed works program as per the provisions of the
GS and TS. This shall also include a detailed procurement program.
1.2.2 The Contractor shall obtain approval of works program and procurement program
from Engineer before commencing with the procurement of material.
1.2.3 The procurement of the material shall be planned in a such a that the material
reaches in advance of the proposed erection plan for the same.
1.3 TENDER PRICES
1.3.1 The Tenderer's attention is drawn to the following facts while quoting the prices for
1.3.2 The rates and prices quoted for each item in the Bill of Quantities shall be inclusive
of all central/State/Local Taxes (except GST and custom duties which will be paid
extra as applicable), levies, cess and all other incidental charges required to fulfil
the tender conditions including statutory deductions viz. TDS towards income
tax/GST/Labour cess and any other taxes etc. For further detail please refer
GCC/SCC. The details of all Taxes / Duties/Levies etc for the Quoted price are
required to be furnished separately as estimated by the tenderer as per Annexure-
A. The payment against paid GST will be released only after submission of
documentary proof and display of payment proof online and as per the Engineer’s
recommendation.
1.3.3 The Tenderer should note that GMRC will not make any separate payment towards
any taxes, duties, levies or any other charges leviable, etc. except GST
1.4 PRICE VARIATION
1.5.1 For the purpose of this Contract, all unit quantities given in the Bills of Quantities
are the estimated quantities of the Works and are intended in the first instance to
provide a common basis for Tendering and Tender Evaluation. When a contract
has been entered into, the function of priced Bills of Quantities is to provide for the
valuation of the work executed. No alteration of any rate or price shall be allowed
GMRC August 2026 1-6 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
on account of any difference between the quantities billed and the actual quantities
measured from the drawings.
1.5.2 The Tenderer shall make himself completely acquainted with all conditions,
obligations, specifications, drawings, etc. of the Tender Documents before giving
his prices. He shall have no right to claim any price revision on the basis of
ignorance of the Tender Documents or local conditions, or to make any claims as
regards the integrity of the unit prices of the Bills of Quantities.
1.6 UNITS AND CURRENCY
1.6.1 All sizes and quantities entered in the Bills of Quantities are in metric units.
1.6.2 The Tenderer shall fill in each column with unit rate or lump sum, whichever the
case may be, for each bill item of the various Bills, on the basis of the Tender
Documents and pre-tender survey.
1.6.3 The Tenderer has to quote only in INR currency.
1.7 RATES & SUMS TO BE FOR WORK FINISHED COMPLETE
1.7.1 Tenderers shall be deemed to have read the Work’s Requirements and other parts
of the Tender Documents and reviewed the Drawings to ascertain the full scope of
the requirements included in each item prior to filling in the rates and prices. The
entered rates and prices shall be deemed to include the full scope of the Contract,
including overheads and profits and shall bear a proper relationship to the cost of
carrying out the work described.
1.7.2 Notwithstanding any limits that may be implied by the wording of the individual
items and/or the explanations in the Preamble, the rates and prices, which the
Tenderer enters in the Bill of Quantities, shall be for the work finished complete in
1.7.3 The Tenderer shall be deemed to have taken full account of all requirements,
liabilities, obligations and risks, whether expressed or implied, and to have priced
the items accordingly. The Items in the Bills of Quantities are the only items against
which payment will be made. The cost of any item of work not specifically described
or measured in the Bills of Quantities but required for the execution of the Contract
shall be included in the rates and prices for the measured items in the Bills of
Quantities. The rates and prices shall therefore include for all incidental and
contingent expenses and risks of every kind necessary to supply, install, test and
GMRC August 2026 1-7 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
commission (including Integrated Testing and Commissioning) complete, and
remedying any defects in the whole of the Works in accordance with the Contract.
1.8 ALLOWANCES IN RATES AND PRICES
1.8.1 Full allowance shall be made in the rates and prices against the various items in
the Bills of Quantities for all costs involved in performing the following except to the
extent that work is specifically described and paid for in the Bills of Quantities. The
list below is not exhaustive and the Tenderers are expected to take all costs
involved while quoting the rates and prices that will not be subject to variation on
a) all setting out and final survey work;
b) all kind of design and simulation through Software tools.
c) Temporary access routes and construction of barricades, diversion for shifting
of equipment from factory to ASS-TSS, RSS.
d) Construction of store for storage of equipment, tools, spares.
e) Paying fees and giving notices to authorities.
f) safety precautions and all measures to prevent erosion and suppress fire and
g) Interference to works by persons, vehicles and the lie being legitimate users of
the facilities on or on the vicinity of the site.
h) The protection and safety of GMRCL train and services.
i) supplying, maintaining and removing on completion, the Contractors own
accommodation, offices, depots, stores, workshops, transport, welfare services
j) and other facilities including telephones and facsimile machines and all charges
in connection therewith;
k) the supply, inspection, testing, packaging and transportation of materials and
of the Works as specified including the provision and use of equipment and
arrangements for the Engineer's Inspectors and others;
l) providing, transporting to the Site, setting to work, operating (including all fuel
and consumable stores), maintaining and removing from the Site upon
completion all Construction Plant and Contractor's Equipment necessary for the
GMRC August 2026 1-8 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
execution of the Works and including the cost of all tests and other
requirements in respect of such; plant and equipment;
m) working adjacent to or across existing services and installations;
n) complying with the requirements of the Employer in regard to Safety and
Health, Quality Assurance, Environmental and project implementation plans
and making periodical submissions;
o) co-ordination and interference to the Works by the works of Designated
Contractors and others employed by GMRC being legitimate users of the
facilities on or in the vicinity of the Site;
p) remedying of defects and shrinkage, and works of amendment, reconstruction,
replacement of other faults, fair wear and tear excepted, during Defects Liability
q) Insurance, including all risks in supply, erection, storage, transit, third party,
Workmen’s Compensation and others;
r) All tools, and equipment required for all tests prior and after delivery and for
testing and commissioning installed systems;
s) Carrying out all modifications to the given drawings, preparing construction
detailed drawings and supplying originals, copies, and electronic files in
accordance with employer’s requirement.
t) Marine Insurance
u) All risk Insurance after arrival of goods in India
v) Custom clearance / Port Clearance
w) Handling at Port of arrival in India
x) Inland transportation from port of arrival to site of work
y) Various bank guarantees / warranties/undertakings
1.9 NON-PRICED ITEMS
1.9.1 Items against which no rate or price is entered by the Tenderer whether quantities
are stated or not, shall be regarded as covered by other rates in the Bills of
Quantities and no any additional payment shall be done by employer. Bidder has
GMRC August 2026 1-9 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
to quote against all item as provided in BOQ spread sheet and price against the all
items as listed in BOQ spread sheet shall be considered for Price Bid Evaluation.
1.10 TENDER PRICING
1.10.1 The Tenderer shall take regard of the actual site conditions and the estimated
quantities entered in the various bills. The Tenderer shall price his tender
accordingly and the rates and prices entered against a bill line item shall be the full
and only price paid for all work performed against that item except as described in
the Tender Documents.
1.10.2 The Tenderer shall quote the rates and prices in words as well as in figures in the
summary sheet. Any cutting/overwriting in Bill of Quantities shall be initialled by
the authorized representative of the Tenderer.
1.11 MEASUREMENT AND PAYMENT
1.11.1 The measurement and payment described is for the purpose of making a valuation
of the work acceptable to the Engineer, and Interim Payments to the Contractor,
as work proceeds. The Works as executed will be measured for assessment of
progress for interim payments in accordance with the method adopted in the
relevant standard/Specification, the Bills of Quantities and under the items as set
forth notwithstanding any custom to the contrary.
1.11.2 For the measurement of “Numbers” and “Sets” these shall be by count, using
dimensions and contents as described in the specifications and relevant drawings.
1.11.3 For the purposes of making interim payment for line items described as “Set”, the
Contractor shall submit with his tender a breakdown of the rates making up the
total for those items for which the Contractor may wish to receive interim payments.
These breakdowns shall be subject to the approval of the Engineer, and no interim
payment shall be made on such items until the breakdown has been approved.
1.11.4 Notwithstanding anything stated herein, the Engineer retains the right to withhold
payment on any pay item due for payment when the works to be performed are not
GMRC August 2026 1-10 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
performed, or are not carried out to the Engineer’s satisfaction in accordance with
Specifications and Drawings.
1.11.5 Prices so assigned in the BOQ for supply items shall be for the full compensation
for supplying, installation, Testing, commissioning and integration of items as per
drawing and specifications.
1.11.5.A Prices so filled by Bidder while submitting the financial bid shall be of full
compensation for supply, installation, testing, commissioning, integration of Gas
flooding system. Bidder shall quote the prices in excel BOQ after taking the due
consideration of all Technical Specifications, Drawings, General Specifications,
SCC and GCC, NIT, ITT, FOT and other tender document, clarifications and
addendum issued in this regards. At the time of execution, bidder shall not raise
any claim of NS item for the reason being same is mentioned in Technical
specification but not covered in BOQ.
Terms of Payment
S. No Milestone No Activity Payment percentage
1 Milestone No 1 Acceptance of Design & Detail Engineering
Supply of Gas flooding system along with its 50%
supporting accessories
Installation, Testing & Commissioning including
3 Milestone No 3 30%
Integration with SCADA at OCC level
5 Milestone No 4 Successful completion of DLP 1st year
6 Milestone No 5 Successful completion of DLP 2nd year
1.11.6 Milestone-1: - 10% of total price quoted in BOQ item no. 1, 2 and
(Acceptance of Design & Detail Engineering) (For KD-1 to KD-12)
1.11.6.1 “Notice of No objection “or “notice of No Objection subject to…” to be issued by
the “Engineer of GMRCL” in respect of the design and other documents for Gas
Flooding System. The compensation shall include for the preparation,
submission, and all the subsequent revisions, changes required and re-
submittals as necessary during the design phase as required by the “Engineer”
GMRC August 2026 1-11 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
or documents, design calculations, test procedures etc. and finalization of the
1.11.6.2 Issue of “No- Objection” or “No-Objection subject to…” For the vendor and
technical proposal of all major equipments
1.11.6.3 The 10% of supply price payment shall be payable after the Acceptance of
Design and Detailed engineering for all the ASS, TSS, RSS and Depot.
1.11.7 Milestone-2: 50% of total price quoted under BOQ item no. 1, 2 and
(Supply of Gas flooding system along with its supporting
accessories) (For KD-13 to KD-18)
1.11.7.1 The compensation under Milestone-2 shall be the 60% of supply price payment
payable after the supply of the Gas Flooding System along with associated
accessories for the ASS/TSS, Depot and RSS.
1.11.7.2 The price under this milestone shall include for the establishing and carrying
out of manufacture/procurement; operation of quality assurance programme at
places of manufacture; carrying out of type tests, prototype tests, factory
acceptance tests, tests before shipment; inspection, packing, crating, shipping
to Port of entry India, including insurances, bank guarantees, and transfer from
offshore factory to port and all storage costs at factory and port etc.
1.11.7.3 Compensation for items listed in this milestone, shall include for all costs
incurred in procurement/manufacture, testing, inspection, shipping, hauling, off-
loading, storing at site in Surat (Storage location to be approved by GMRCL)
1.11.7.4 Compensation under Milestone 2 shall include for the all also custom clearance
activities including all formalities, liaising with the custom authority/custom
house agents as well as transportation of goods to the site at Surat. This also
includes price payable for Port Handling, Port Clearance, Local Transportation
to Surat, Storage in approved Warehousing, loading at storage points or
warehouses and transportation to site, offloading and moving to the point of
1.11.7.5 Payment will be made for the items delivered and stored in a place and manner
approved by the Engineer as per billing breakup approved by the Employer for
this item. Payment on delivery at site under this milestone shall be made
against thee submission of following documents:
a. Certificate of Type Test.
b. Certificate of Factory Acceptance Test
c. Certification of inspection by GMRCL Engineer
d. Provision of safe custody bank guarantee
e. Proof of insurance
f. Technical literature and equipment drawing
g. Package list and TS compliance.
GMRC August 2026 1-12 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
1.11.8 Milestone-3: - 20% of total price quoted under BOQ item no. 1, 2,
(Installation, Testing & Commissioning including Integration with
SCADA at OCC level) (For KD-19 to KD-24)
1.11.8.1 The compensation under Milestone-3 shall be 10% of supply price and 80% of
erection price for the Installation of plant and equipment supplied under the
contract in accordance with the drawings and specifications. Compensation
shall include for preparation, submittal and revisions as required by the
Engineer of installation plans and procedures; co-ordination with other
Designated Contractors, GMRC; conduct of approved pre-commissioning tests
as directed by the Engineer on equipment, sub systems, and systems;. The
compensation under this item shall be for the installation of Gas Flooding
system for putting the system in successful operation.
1.11.8.2 The compensation under this milestone shall be for completing the Gas
Flooding system commissioning at all RSS, Depot, ASS/TSS and integration of
SCADA at OCC as per specifications.
1.11.8.3 The compensation under this item shall be covered for supply and installation
of all kind of supporting accessories for the installation and commissioning of
Gas Flooding system. The compensation under this milestone shall be for fully
complying the ERTS specifications, Drawings and BOQ.
1.11.8.4 Prices for installation/erection of items of plant and equipment shall be for the
full compensation for the installation/erection of plant and equipment in
accordance with the drawings and specifications. Compensation shall include
for all costs incurred for transporting to location, off-loading and moving to point
of installation/erection; provision of specified foundations; preparing for
installation/erection and mounting on foundations; supply of left out items,
aligning, fastenings and securing devices; adjusting as necessary, making
good and clearing the location on completion, all to the approval of the
1.11.8.5 The compensation under this milestone-4 shall be for the testing and
commissioning of Plant and equipment forming the Works in accordance with
the specifications. Compensation shall include for all testing and putting-to-
work of all equipment, sub-systems, and systems; re-testing, fault finding,
adjustments and reworking as necessary; submittal of all test reports and other
documents all to the approval of the Engineer. Payment will be made after
certification by the Contractor and acceptance by the Engineer that the sub-
systems and systems, including all equipment have successfully completed the
test procedures, and have been set-to-work and that all test results and other
documentation, as described in the specifications, have been approved by the
1.11.8.6 Compensation shall include for preparation for submittal, revisions, as required
by GMRCL engineer for testing plan and procedures, coordination with
designated contractors and GMRCL department, conduct of appropriated test
as listed in specifications and directed by Engineer on sub-system, system,
equipment, etc.
1.11.8.7 Compensation shall include for completion of all kind of site testing and
integrated testing of Gas Flooding system installed at all station with SCADA
GMRC August 2026 1-13 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
system at all RSS, Depot and at OCC, configuration of SCADA system for
remote monitoring and operation as defined in the specifications.
1.11.8.8 Compensation shall include re-testing, fault finding, rectification, adjustment,
re-working as necessary and replacement of defective parts. Submittal of all
test reports and all other documents for approval of engineer of GMRCL.
1.11.9 Milestone-4&5: - 5% of total quoted price after completion of DLP period of
1st year. Balance final 5% of total quoted price after completion of DLP period
1.11.9.1 The compensation under Milestone-5 & 6 shall be 5% of the supply price and
paid only after the completion of the first year of the Defect Liability Period
(DLP), and the remaining 5% of the supply price shall be paid after the
completion of the second year of the Defect Liability Period (DLP) and
discharging its obligations including all corrective and preventive maintenance
of installed system under the DLP as provided in the specifications. In the DLP
period the all kind of corrective and preventive maintenance will be done by
contractor as per approved schedule.
Note:- Price Bid Evaluation :- Refer Clause E5 Of ITT
GMRC August 2026 1-14 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
Bill of Quantity (BOQ) (Annexure-A)
NAME OF WORK :- Design, Supply, Installation, testing, commissioning and training
for clean agent based panel flooding protection system for Traction system of Surat
Metro Rail Project Phase-I for Gujarat Metro Rail Corporation Limited
G-1 GENERAL REQUIREMENT
Sl. Item Description Unit of Quantit Unit Rate for Total Amount
Sl. Item Description Unit of Quantit Unit Rate for Total Amount
No. (To be read in Measuremen y Supply, for Supply,
conjunction with t Installation, Installation,
TS) Testing, Testing,
Commissionin Commissionin
integration integration
1 A B C D E=CXD
system for 3,4, 5,
a 2.2 KG (5 LBS) of No.
Gas Cylinder filled
with F-K-5-1-12
clean agent gas
with wall bracket
valve, Nozzle and
accessories (For
b Flexible Ploymer M
Tube (Double layer)
c End of Line No.
d Pressure Switch No.
GMRC August 2026 1-15 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
e Audio Visual Alarm Set
control unit for
connecting each
electronic hooters
and productivity
SCADA/Fire Alarm
System including all
electrical wiring to
Elevated and UG
a 9 KG of Gas No.
Cylinder filled with
F-K-5-1-12 clean
agent gas with wall
bracket , SS pipe,
valve, Nozzle and
accessories (For
b Flexible Ploymer M
Tube (Double layer)
c End of Line No.
d Pressure Switch No.
GMRC August 2026 1-16 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
e Audio Visual Alarm Set
control unit for
connecting each
electronic hooters
and productivity
SCADA/Fire Alarm
System including all
electrical wiring to
Auxiliary Trafo of
a 27 KG of Gas No.
Cylinder filled with
F-K-5-1-12 clean
agent gas with wall
bracket , SS pipe,
valve, Nozzle and
accessories (For
b Flexible Ploymer M
Tube (Double layer)
c End of Line No.
d Pressure Switch No.
GMRC August 2026 1-17 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
e Audio Visual Alarm Set
control unit for
connecting each
electronic hooters
and productivity
SCADA/Fire Alarm
System including all
electrical wiring to
Grand Total (In No.s) Excluding GST
Grand Total (In No.s) Excluding GST
Grand Total (in Words)
Grand Total (in Words)
GMRC August 2026 1-18 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
Annexure – 2, DETAILS OF TAXES AND DUTIES (Tax Bifurcation) INR: Indian Rupees
GST (Goods and Services Tax)
Customs Duty Total
CGST SGST IGST Any other Tax Amount of
t on t on Amount Amount
Amou Amount on Amoun Amoun (6) = sum
which Rate which Rate Amount Rate on which Rate Amount on which Rate
nt which tax/ t t
tax/ (%) tax/ (%) (INR) (%) tax/ duty (%) (INR) tax/ duty (%) of (1) to
(INR) duty levied (INR) (INR)
duty duty levied levied (5)
al Note :1 Contractor at any point of time shall be bound to share the details pertaining to the Input Tax Credit availed or to be availed along with the supporting documents.
Note:2 In the Tax Schedule Contractor shall require to furnish component wise tax details.
Note:4 GST TDS will be deducted from the invoice considering the prevailing rates
Note 5 : It shall be sole responsibility of Contractor to pass all the accrue or to be accrued Input tax credit to GMRC as per Section 171 of CGST Act.
GMRC August 2026 19 | P a g e
Tender No:- GMRC/TR/GFS/SURAT/2026 BOQ
PROFORMA FOR STATEMENT OF MINOR DEVIATIONS
(Refer C15 & C26 of ITT)
1The following are the particulars of minor deviations from the requirements of the Tender Document:
Sr. No Clause Deviations Price adjustment for each
1 The Tenderer shall indicate price adjustment against each deviation in Annexure 13A of BOQ. This price is the price
which the tenderer shall reduced from this tender price if deviation(s) is/are accepted by the Employer.
2 Where there is no deviation, the statement should be returned duly signed with an endorsement indicating ‘No
Deviations’.In case, Performa of deviations is not submitted or submitted as blank, it will be construed that the
tenderer has not proposed any deviations from tender documents.
3 If the tenderer proposes deviations in tender documents, and/or any other terms and conditions of the tender,
other than in this Annexure, it will have no effect.
Signature of authorized signatory on behalf of tenderers
GMRC August 2026 1-20 | P a g e
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
20260807 NIT.pdf
2. ITT.pdf
3. FoT.pdf
4. GCC.pdf
5. SCC.pdf
6. SOW ERGS and ERST.pdf
7 SHE.pdf
8. BoQ.pdf
20260824 Clarification.pdf
CORRIGENDUM
20260824 Addendum-1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].