Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC NULL | L1 | Accepted-AOC L1Accepted | |
| 2 | L2₹8.4 L+₹2,606 (0.31%)Rejected-Finance | L2 | Rejected-Finance L2 Rejected |
Tender Value
₹10.7 L
EMD Value
₹26,767
Closing Date
18 Mar 2020, 3:00 pmClosed
AEE,Roads subdivision ,Ekm
AEE,Roads subdivision ,Ekm
There is one ROB at pullelpadi and 2 small bridge to be constructed for which detailed investigation has to be carried out.The total stretch of the road under this propsal is 4km.
2020_PWD_350031_1
PWD/2019-2020/11400/EKM
Open Tender
Civil Works - Roads
Item Rate
90 days
Ernakulam
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
online
₹26,767
Yes
19 May 2020
12 Mar 2020
20 Mar 2020
12 Mar 2020
18 Mar 2020
12 Mar 2020
Amount
1 Appendix- A Site Survey and Preparation Of Alignment
56.12.b : Total station surveying and preparation of site plan for plain built up area with hindrance to line of sight due to buildings/structures.Total station surveying and preparation of site plan for plain built up area with hindrance to line of sight due to buildings/structures.
od18869/2019_2020 : Preparing alignment plan for the proposed road and drawing out a suitable alignmentmeeting all the requirements of Indian Road Congress (IRC). Also satisfying the Engineering aesthetic andeconomic requirement designing of horizontal curves (wherever feasible) including spiral transitions andvertical curves after finalizing the alignment and also preparing the LS and CS at an interval of 50m C/C.
56.17.1 : Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing.Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing.
od18870/2019_2020 : Conducting traffic survey at two stations with two sheds on opposite sides at each station including hire charges of shed and furniture , labour charges of survey assistants , cost of stationaries etc. complete
od18871/2019_2020 : Conducting CBR test and engaging labour for assisting collecting sample for CBR Test
od18872/2019_2020 : Conveyance charge per trip for Tipper/ Truck fron site to Lab and also the conveyance of Benkleman's<br>Beam etc
od18873/2019_2020 : Conducting BENKLEMAN BEAM DEFLECTION TEST icluding carrying out condition survey for collecting basic information of the road structure , transportation charges to survey site etc complete as per the direction of departmental officer
od18874/2019_2020 : Preparation of Detailed Project Report of the road and bridge works containing alignment plan, key plan, contour<br>plan , index map, longitudinal and cross section of road and detailed inventory , all quantity calculations<br>including pavement design, earthwork calculations, detailed drawings of all proposed structures like<br>retaining wall , culvert etc including neat filing and supplying five set DPR etc. as per the directions of the<br>departmental officers.
od20205/2019_2020 : Collection of field datas from land, Survey numbers, width measuring to be aquired land etc. complete in every kilometer
Appendix.B Investigation for Bridge work for Pullepady railway overbridge and at near Pipeline road
56.13 : Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation,bridge and building sites at in accessible locations)Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation,bridge and building sites at in accessible locations)
56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the work<br>For machine boringMobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring
56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.<br>For machine boring.Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring.
56.3.a.1 : Boring with rotary power drilling equipment's in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment's inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil.
56.3.b.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soilBoring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil
56.3.c.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 20m upto 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m.intervals.For ordinary soil.
56.5.a : Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.<br>In land.Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.In land.
56.6 : Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
56.7 : Conducting standard penetration test in bore hole at any depth.Conducting standard penetration test in bore hole at any depth.
56.8 : Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.11.a : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)<br>Machine boring for 5 bore holes.Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)Machine boring for 5 bore holes.
Synergy Architects and Engineers
Bidder Name
G S Infrastructure
Synergy Architects and Engineers
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_491216.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .