| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC DABGRAM COLONY 1 P O RABINDRA SARANI SILIGURI | SILIGURI | WEST BENGAL | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹26.9 L+₹2.4 L (9.99%)Rejected-Finance DONNAGAR GANGANAGAR KOLKATA 700132 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700132 | L2 | Rejected-Finance L2 bidder | |
| 3 | L3₹35.2 L+₹10.8 L (44.2%)Rejected-Finance 55 A KONCHATI POST TRIBENI DIST HOOGHLY PIN 712503 | TRIBENI | HOOGHLY | WEST BENGAL | 712503 | L3 | Rejected-Finance L3 bidder | |
| 4 | Rejected-Technical BAIKUNTHAPUR S T K K ROAD TRIBENI HOOGHLY 712503 | TRIBENI | HOOGHLY | WEST BENGAL | 712503 | - | Rejected-Technical Not Qualified | |
| 5 | Rejected-Technical 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | - | Rejected-Technical Not Qualified |
Tender Value
Refer Docs
EMD Value
₹51,700
Closing Date
29 Apr 2022, 5:00 pmClosed
The General Manager,BKTPP, WBPDCL,731104
The General Manager,BKTPP, WBPDCL,731104
OVERHAULING OF U # 3 ASH HANDLING PLANT AT BKTPP
2022_WBPDC_373515_1
WBPDCL/BKTPP/NIT/E2090/21-22
Open Tender
Support/Maintenance Service
Item Wise
365 days
Bakreswar Thermal Power Plant
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹51,700
Yes
ONLINE- The office of Sr.Mgr.(CC), BKTPP, WBPDCL
19 Oct 2022
6 Apr 2022
2 May 2022
6 Apr 2022
29 Apr 2022
13 Apr 2022
12 Apr 2022
Amount
OH of U#3 BA Hopper Area
Replacement/Repairing of Clinker Grinder ( Including repairing/replacement of Feed Sump and checking/replacement of gland sealing hose. )
OH of Feed Gate along with Feed Gate ( Alignment, checking of OPEN/CLOSE position & rectification of passing problem (if any) and checking/servicing of air water converter tank. )
Servicing/Replacement of Jet Pump along ( With checking/replacement of nozzle, combine tube, nozzle tip, nozzle holder etc. )
Checking & repairing of BA Hopper ( Refractory wall including supply of material. )
Replacement of BA Hopper looking glass/ ( Looking glass assembly. )
Checking/Repairing of BA Hopper man hole ( Including replacement of gaskets. )
Servicing/Replacement of Knife Gate V/V ( (200NB/300NB) at economizer surge hopper & at discharge of Clinker Grinder. )
Servicing/Replacement of 300NB/ ( 250NB Gate/Globe/Butterfly Valve. )
Servicing/Replacement of 100NB/150NB/ ( 200NB Butterfly/Plug Valve/Gate/Globe Valve. )
Servicing/Replacement of 15NB / 25NB/ 50NB/ ( 65NB/ 80NB/ Gate/ Globe /Butterfly Valve/Ball Valve. )
Trough Seal, Economiser Hopper, Eco ( Surge hopper and BA Hopper checking & cleaning. )
OH of U#3 ESP Area
Removal, physical inspection, refitting ( And replacement (if required) of ESP Fluidising Tiles. )
Checking, removal, refitting, repairing/ ( Replacement of diffuser feeder assembly (below ESP Hopper, 1st & 2nd field) including checking/replacement of diffuser fluidizing tiles for wet cleaning. )
Checking, removal, refitting, repairing/ ( Replacement of Ash Intake Valve of ESP & APH Hopper for wet cleaning. )
Checking, Repairing/Replacement of Air ( Intake V/V of ESP vacuum header. )
Checking, Repairing/Replacement of ( 10inch/9inch TERSG V/Vs. )
ESP Hopper inside checking, cleaning ( Repairing (if required) and change of all manhole door packing for wet cleaning. )
OH of U#3 FA Tower Area
Bag Filter/Cage checking, Cleaning & all ( Bag Filter replacement with pulse jet bar checking and repairing. )
Checking, Repairing/Replacement of Swing ( Disc V/V of Transfer Hopper. )
Checking, Repairing/Replacement of Vent ( Valve, equalising valve of Transfer Hopper and NUVA Feeder. )
Physical inspection & repairing of ISH ( Internal (if required),cleaning of accumulated ash from inside of ISH including checking & replacement of ISH fluidizing tiles. )
Disposal of ISH ash through tractor
Checking, repairing/replacement of NUVA ( Feeder diffuser including fluidizing tiles and repairing/replacement of body pad. )
Repairing/Replaceemnt of Collection Tank ( Including checking & replacement of impingement plate. )
OH of Wetting Head including checking & ( Replacement of nozzle, inlet section, gaskets, tail piece, outlet section etc. )
OH of Air Washer (Dry & Wet) including ( Checking & replacement of nozzles, gaskets etc. )
U#3 Pipeline & Fabrication job
Rotation/Replacement of 8 inch/9 inch CI ( Pipe line including bend/lateral/tool piece & T-joint below ESP Hopper & up to FAE Tower, line alignment checking, repairing/erection of damaged support, gasket replacement etc. )
Replacement of 200NB, 250NB, 300NB MS ( Pipe line. )
Replacement of 100NB, 150NB MS pipe line
Replacement of 9inch, 10inch DRC Pipe
Replacement of 15NB, 25NB, 40NB, 50NB, ( 65NB, 80NB MS pipe lines. )
Replacement of 9inch/10inch CI/DRC bend, ( Tee etc. )
Fabrication & Erection of 150NB, 200NB, ( 250NB MS bend. )
Fabrication & Erection of 40NB, 50NB, ( 65NB, 80NB, 100NB MS bend. )
Flushing/Cleaning of fluidising air line ( Of ESP Hopper, NUVA Feeder and flushing of fresh air line up to NUVA Feeder body pad. )
GST as applicable will be paid extra on production of proper documents.
S N ENTERPRISE
KRANTI SERVICE AND ENGINEERING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .