Loading…
Loading…
Tender ID
Tender Value
₹1.7 L
EMD Value
₹4,237
Closing Date
11 Mar 2026, 10:00 amClosed
Assistant engineer
Office of the assistant engineer
Construction of Karuvancheri Bridge
2026_LSGD_842058_10
ET06/2025-26/AE/TKD
Open Tender
Civil Works - Bridges
Item Rate
180 days
Thrikkadeeri GP
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
₹4,237
2 Mar 2026
2 Mar 2026
12 Mar 2026
2 Mar 2026
11 Mar 2026
2 Mar 2026
Construction of Karuvancheri Bridge (MorD2018)
3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6
12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m III. R.C.C grade M 20
13.1.2:Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5<br>R.C.C M 25
13.1.1.3:Providing and laying reinforced cement concrete in super structure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 <br>. 1. R.C.C grade M20 <br> (iii) For design mix RCC M20
12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
OD499160/2025-2026:Supplying and fixing Name board Built in Square Pipe with MS sheet and a Size of 90cmx60cm, including all Other materials, labour charges etc. Completed as per the Direction of Departmental officers
Construction of Karuvancheri Bridge (DAR2018)
50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
51.2.3:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1421600.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 2.33 MB
Corrigendm.pdf
PDF • 0.27 MB
Corrigendm.pdf
PDF • 0.27 MB
ET6.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .