| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-Finance | ₹3.5 L | L1 | Accepted-Finance being L1 |
| 2 | L2₹3.6 LRejected-Finance | ₹3.6 L | L2 | Rejected-Finance being L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
Tender Value
₹3.3 L
EMD Value
₹6,600
Closing Date
16 Jul 2026, 5:00 pmClosed
Executive Engineer
HPPWD Division Nurpur
C/O G.I. wire caret work at RD 6/320 to 6/335 L 15.00 Mtr RHS
2026_PWD_138488_2
2903-04 dated 07.07.2026
Open Tender
Civil Works
Percentage
Nurpur
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹6,600
22 Jul 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
16 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable matreiali ncluding Caariage of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government. | 46.88 | Per Cubic Meter | 364 | ₹17,064.32 |
| 2 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 including Caariage of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government . | 93.75 | Per Cubic Meter | 3,250 | ₹3,04,687.5 |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 including Caariage of materials in all leads, lifts and other incidental, as per the entire satisfaction and directions of Engineer-in-Charge . The rate including octroi, royality, Malkana, toll tax, or other taxes imposed by the Government . | 30.94 | Per Cubic Meter | 110 | ₹3,403.4 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 4.42 MB
Tendernotice_3.pdf
PDF • 12.19 MB
SBD272026.pdf
Tender Documents • 2.59 MB
BOQ_205171.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].