| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC | ₹2.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.4 CrRejected-AOC | ₹2.4 Cr | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L4 |
| Sl No | Description | Qty | Unit | Sivankuttynair G L4 | S.GOPAKUMAR L3 | BIJU AUGUSTINE L2 | SAMEER ALI CT L1 |
|---|---|---|---|---|---|---|---|
| 1.00Laying Sewer Line | |||||||
| 1.00 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | 1,782 | metre | 26.69 ₹47,561.58 | 26.55 ₹47,312.1 | 24.39 ₹43,462.98 | 25.1 ₹44,728.2 |
| 1.00 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | 128.9 | cum | 429.49 ₹55,362.12 | 408.88 ₹52,705.45 | 392.47 ₹50,590.17 | 403.6 ₹52,024.85 |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 30 | cum | 1,530.18 ₹45,905.4 | 1,451.05 ₹43,531.5 | 1,398.29 ₹41,948.7 | 1,438 ₹43,140 |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 1,133.02 | cum | 667.61 ₹7,56,414.15 | 644.73 ₹7,30,490.7 | 620 ₹7,02,471.16 | 600 ₹6,79,810.8 |
| 1.00 | 100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 1,702.11 | cum | 796.58 ₹13,55,866.78 | 769.28 ₹13,09,399.18 | 740 ₹12,59,561.4 | 740 ₹12,59,561.4 |
| 1.01 | 100.1.3:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 3m but not exceeding 4.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 808.35 | cum | 925.56 ₹7,48,176.43 | 893.84 ₹7,22,535.56 | 855 ₹6,91,139.25 | 580 ₹4,68,843 |
| 1.01 | 100.1.10:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock Requiring Blasting. | 105 | cum | 1,620.77 ₹1,70,180.85 | 1,565.22 ₹1,64,348.1 | 1,488 ₹1,56,240 | 1,500 ₹1,57,500 |
| 1.01 | 100.1.11:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 3m but not exceeding 4.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m in Hard Rock Requiring Blasting. | 105 | cum | 1,852.1 ₹1,94,470.5 | 1,788.63 ₹1,87,806.15 | 1,700 ₹1,78,500 | 1,700 ₹1,78,500 |
| 1.01 | 100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals. | 1,538 | metre | 109.66 ₹1,68,657.08 | 121.05 ₹1,86,174.9 | 100.21 ₹1,54,122.98 | 90 ₹1,38,420 |
Tender Value
₹2.6 Cr
EMD Value
₹1 L
Closing Date
4 Mar 2026, 3:00 pmClosed
The Superintending Engineer
O/o The Superintending Engineer, Public Health Circle, Kerala Water Authority, Thiruvananthapuram
AMRUT 2.0 Block NProviding and laying 300mm dia RCC NP3 Pipe and 315mm dia HDPE Sewer main from trunk main Karayogam Junction to KJK Hospital Nalanchira Ch.00 to Ch 825.0 Reach 1 Sewerage Work
2026_KWA_840644_1
30/2025-26/KWA/PHC/D4/TVM
Open Tender
Civil Works - Water Works
365 days
Nalanchira
Please refer Tender documents.
6 documents required · 6 mandatory
₹8,270
₹1 L
Yes
7 Jul 2026
25 Feb 2026
5 Mar 2026
25 Feb 2026
4 Mar 2026
25 Feb 2026
25 Feb 2026 - 4 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying Sewer Line | |||||
| 1.001 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. | - | metre | - | - |
| 1.002 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | 0.8 | cum | - | - |
| 1.003 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | - | cum | - | - |
| 1.004 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 0.2 | cum | - | - |
| 1.005 | 100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 1 | cum | - | - |
| 1.006 | 100.1.3:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 3m but not exceeding 4.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | - | cum | - | - |
| 1.007 | 100.1.10:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock Requiring Blasting. | - | cum | - | - |
| 1.008 | 100.1.11:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 3m but not exceeding 4.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m in Hard Rock Requiring Blasting. | - | cum | - | - |
| 1.009 | 100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals. | - | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1417201.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.32 MB
NIT.pdf
Tender Documents • 1.07 MB
BOQ_1417201.xls
BOQ • 0.37 MB
extensioncorrigendum30.pdf
Other Document • 0.02 MB