V J SATISH KUMAR
Cherlapally Installation, Bharat Petroleum Corporation Limited
AMC for railway siding track maintenance
2388
1000386822
Limited Tender
Supply
Cherlapally Installation
7 Dec 2022
11 May 2022
24 May 2022
10 May 2022
24 May 2022
10 May 2022
60 days
SCOPE AND TERMS & CONDITIONS OF THE JOBS
1. This AMC is valid for 1 year period.
2. The job involves carrying out preventive maintenance of the railway siding track as per railway
guidelines and P-way manual on daily basis (26 days per month exclusive of sundays and national
holidays) by engaging one semi-killed manpower having good experience and preferably must be
retired gangman from railways track maintenance dept.
3. All tools and tackles required for the execution of job must be provided by contractor itself.
4. The vendor must ensure that track fittings are secured properly as per railway guidelines and any
deviations must be corrected immediately.
5. The vendor must ensure the integrity of the four insulation joints is healthy and check the track
insulation every month. The report must be submitted along with the bill.
6. The vendor also has to co-ordinate for the issue of fitness certificate of the siding track from the office
of Section Engineer, P-way, SCR Ghatkesar.
7. The vendor must be available during any siding inspections by railways or BPCL/IOCL officials and co-
ordinate the inspection.
8. The vendor must position the manpower during any major repair and maintenance work of siding
9. The vendor must ensure the contract staff is wearing PPE (safety helmets and shoes) while working
in siding and also must issue him ID card authorized by BPCL.
10. Police verification must be done of the contract staff engaged.
11. This "TRACK FIT" certificate has to be submitted to BPCL every quarter.
12. The contractor must immediately bring to the notice of engineering officer regarding any deviations
observed with respect to siding track.
13. The contractor must ensure each and every activity mentioned in the SCOPE OF JOB is followed during
execution of the subject job.
14. In case of contractor negligence whenever there is a loss to the company/ neighbors due to
nonadherence to SCOPE OF JOB; penal amount as fixed by company will be debited from contractor’s
payment. Job to be executed as per the directions of BPCL officer.
15. Penalty shall be levied in case of deviations of any guidelines as below.
a. Failing to submit report of Track Fitness : 50 % of monthly invoice value.
b. Down time of track insulation joint more than 48 hours : 50 % of monthly invoice value.
c. Greasing not done on fish plate joints : 10% of monthly invoice
d. No PPE : 10 % of monthly value per day
1. Effective 01.04.2019, the periodic increase in the amount of minimum wage will be automatically
subsumed under the additional wage component i.e. whenever there is an increase in the Central
Minimum Wage rates, the additional wage component will be proportionately reduced so that there
is no change in the total payout in terms of wages. The computation of additional wage will be as
Revised Computation Methodology for additional wage
'Area Type' Unskilled Semi-skilled Skilled
Z - Increase in the Central Minimum Wage rate for a
particular class and skill
This special wages is to be added to the current Central minimum wages and accordingly payment is to
2. This minimum wages is revised/ escalated by CLC every six months from 1st April and 1st October.
3. Thus special wages would also undergo a change whenever minimum wage revision happens in
October and April.
4. The increase in minimum wages will be subsumed from the additional wages resulting in
proportionate decrease in additional wages over a period of time
The subject tender period is for one year.
5. HENCE WHILE FINALIZING THE APPLICABLE MINIMUM WAGES, THE BIDDER MUST CONSIDER TO
ENSURE HIS QUOTED RATE CAN MEET THE MINIMUM WAGES UP TO TENDER PERIOD. NO REVISION IN
CONTRACT VALUE SHALL BE ENTERTAINED DUE TO REVISION IN MINIMUM WAGES IN THE MONTH OF
IF THE HIKE IN MINIMUM WAGES IS MORE THAN 10% OF PREVAILING WAGES + X Component and beyond
THEN THE INCREMENTAL AMOUNT ABOVE THAT VALUE SHALL BE PAID TO THE VENDOR. THE
CONTRACTOR SHALL SEEK THE ESCALATION IN WRITING WITH ALL RELATED DOCUMENTS WHEREBY
JUSTIFYING THE REQUEST FOR ESCALATION AND THE COMPANY AT ITS DISCRETION SHALL STUDY THE
REQUEST AND THEREAFTER ACCEPT, MODIFY OR REJECT THE REQUEST, AS IT MAY DEEM FIT. ESCALATION
AMOUNT, IF ANY, WOULD FORM PART OF THE SUBSEQUENT MONTHLY BILLS PRODUCED BY THE
CONTRACTOR, FOR THE SERVICES PROVIDED.
IF THERE IS ANY ABNORMAL HIKE IN THE MINIMUM WAGES OTHER THAN REGULAR HIKES ANTICIPATED
IN APRIL AND OCTOBER MONTHS, THE DIFFERENTIAL AMOUNT OF HIKE WITH CONTRACTOR MARGIN AS
PER THE CONTRACT RATES SHALL BE ADDITIONALLY PAID. THE CONTRACTOR SHALL SEEK AN ESCALATION
IN WRITING WITH ALL RELATED DOCUMENTS WHEREBY JUSTIFYING THE REQUEST FOR ESCALATION AND
THE COMPANY AT ITS DISCRETION SHALL STUDY THE REQUEST AND THEREAFTER ACCEPT, MODIFY OR
REJECT THE REQUEST, AS IT MAY DEEM FIT. ESCALATION AMOUNT, IF ANY, WOULD FORM PART OF THE
SUBSEQUENT MONTHLY BILLS PRODUCED BY THE CONTRACTOR, FOR THE SERVICES PROVIDED.
6. The contractor then has to add his profit / margin.
7. The total monthly cash outflow will be sum of (basic + VDA+Variable Special wages) + (statutory
liabilities) + (Over head cost for equipment maintenance) + (Contractor profit).
8. The contractor shall calculate the wages based on the above calculation and No extra wages shall not
be paid over and above your monthly bill.
If the payments are not made as per these guidelines the contract will be cancelled and Security deposit
will not be refunded.
9. All the safety and security regulations and other statutory rules as applicable in area shall be complied
by contractor in totality. In the event of any damage caused due to non observance of such rules and
regulations, the contractor shall be solely responsible for the same and shall keep BPCL indemnified
against all cases and claims arising out of the same.
10. All bills, supporting documents (wages sheet, PF/ESI Challan copy, attendance sheet etc.) duly
certified by BPCL officer shall be submitted by 7th of following month. The onus of getting bills verified
lies with the contractor.
11. The contractor shall have to be registered under GST as per prevailing government rule.
12. The tendered/Ordered numbers/quatities are indicative and approximate and same may vary as per
requirement of BPCL during tendering, at the time of placement of PO or after placement of PO. Also the
above services in full or in Part may be sought in phased manner at discretion of BPCL even after
placement of PO. Payment shall be made for actual certified quantities within the required quantities
only. BPCL reserves the right to take partial quantities/Place PO for Partial Quantities and/or
foreclose/short close the order. No claims shall be entertained by BPCL on this account, whatsoever, at a
13. In case of contractor fails to provide the assistance on any particular day or period, BPCL has the right
to hire an outside agency at the cost and risk of contractor.
14.. Contact telephone numbers of contractor and of all assistance personnel esp. of supervisor shall be
given to BPCL officer in charge.
15. Contractor shall not be entitled to sublet the job.
16.. The contractor assistance provided for job shall abide to all BPCL rules and regulations inside the
premises and well behaved, punctual and shall not consume alcohol & smoke during duty. No worker
below the age of 18 years will be employed.
17.. BPCL reserves the right to accept/reject the personnel deployed for the assistance if found that the
services are not in compliance with the terms and conditions of the contract.
18. If any change in Contractor assistance, that shall be implemented only in consultation/approval with
and after acceptance from officer in charge.
19.. The contractor personnel provided for assistance will always have to abide by the safety and security
norms of the installation.
20.. The contractor shall arrange to carry out periodical medical check-up of all assistance personnel
under the contract twice in a year and submit the reports to BPCL. No extra payment will be made for
21. Payment terms: Payment will be made on monthly basis within 15 days from the date of receipt of
certified bills and will be through e-payment only.
22. Contract period: One year from the date of PO/LOI
23. Repeat order for a further period of 1 year can be given provided the contractor and BPCL mutually
agrees to continue executing the subject contract under the same rates and scope of job/terms and
conditions of the contract.
24. Contractor shall commence the works from the date as instructed in the LOI/PO.
25. BPCL reserves the right to cancel the contract during contract period with one-month notice without
assigning any reason thereof
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2388.pdf
pdf • 0.48 MB
BUDGETDOC_2388.pdf
pdf • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .