Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.9 LAccepted-AOC | ₹3.9 L | 1 | Accepted-AOC QUALIFIED |
| 2 | 2₹3.9 L+₹7,502.79 (1.94%)Rejected-AOC PURUNA BARIPADA MAYURBHANJ | BARIPADA | MAYURBHANJ | ODISHA | ₹3.9 L+₹7,502.79 (1.94%) | 2 | Rejected-AOC DISQUALIFIED |
| 3 | 3₹3.9 L+₹7,897.68 (2.04%)Rejected-AOC AL WARD NO 15 PO PS BARBIL KEONJHAR 758035 | KENDUJHAR | ODISHA | 758035 | ₹3.9 L+₹7,897.68 (2.04%) | 3 | Rejected-AOC DISQUALIFIED |
| 4 | 4₹3.9 L+₹7,897.68 (2.04%)Rejected-AOC | ₹3.9 L+₹7,897.68 (2.04%) | 4 | Rejected-AOC DISQUALIFIED |
Tender Value
₹4.7 L
EMD Value
₹4,700
Closing Date
30 Mar 2026, 5:00 pmClosed
O/O EXECUTIVE OFFICER, KEONJHARGARH MUNICIPALITY
O/O EXECUTIVE OFFICER, KEONJHARGARH MUNICIPALITY
Upgradation of 25 KVA to 100KVA Transformer of DP S/S of FSTP premises
2026_ORULB_127372_5
ODULB_KGM_22/2025-2026
Open Tender
Electrical Works
Percentage
60 days
KEONJHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹4,700
Yes
15 Jul 2026
19 Mar 2026
31 Mar 2026
19 Mar 2026
30 Mar 2026
19 Mar 2026
19 Mar 2026 - 26 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply & erection of 50x6mm GI flat for earthing, 2.36 Kg/Mtr including Stock, Storage & Insurance, Contigency, T&P, Transportation and Erection Charges. | 84.96 | Kg. | - | - |
| 2 | Supply & erection of 100 KVA,11/0.4KV (A1)Transformer BIS Energy Level-II including Stock, Storage & Insurance, Contigency, T&P, Transportation and Erection Charges. | 1 | EA | - | - |
| 3 | Supply & erection of LT Distribution box with MCCB, aluminium bus bar for 2 bay with kit kat fuse for 100KVA S/S | 1 | EA | - | - |
| 4 | 55sqmm All Alloy Aluminium conductor (AAAC) including Stock, Storage & Insurance, Contigency, T&P, Transportation and Erection Charges. | 50 | Mtr | - | - |
| 5 | Supply & erection of 4C x 95 sqmm LT XLPE cable (Armoured) including Stock, Storage & Insurance, Contigency, T&P, Transportation and Erection Charges. | 10 | Mtr | - | - |
| 6 | Supply & erection of AB Switch 11KV 3 pole, 200A, 50HZ including Stock, Storage & Insurance, Contigency, T&P, Transportation and Erection Charges. | 1 | Set | - | - |
| 7 | Supply & erection of HG Fuse 11KV, 3 pole, 200Amp including Stock, Storage & Insurance, Contigency, T&P, Transportation and Erection Charges. | 1 | Set | - | - |
| 8 | Supply & erection of PG clamp for 55sqmm AAA Conductor including Stock, Storage & Insurance, Contigency, T&P, Transportation and Erection Charges. | 6 | EA | - | - |
| 9 | Supply & erection of Lighting Arrester (12KV,10KA) station class including Stock, Storage & Insurance, Contigency, T&P, Transportation and Erection Charges. | 3 | EA | - | - |
| 10 | Supply & erection of 40mm Nominal bore GI Pipe (Medium gage) earthing device with 3 mtrs. Long | 3 | EA | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_585538.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
DTCN.pdf
Tender Documents • 0.80 MB
BOQ_585538.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .