Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | -3.70% | ₹2.4 L | L1 | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹4,984
Closing Date
28 Feb 2026, 6:00 pmClosed
EXECUTIVE OFFICER GORUBATHAN PANCHAYAT SAMITI
EXECUTIVE OFFICER GORUBATHAN PANCHAYAT SAMITI OFFICE
Construction of Additional Class Room at Pala Basty SSK under Todey Tangta Gram Panchayat, under Gorubathan Panchayat Samiti
2026_GTA_1013480_2
EO/GBN_PS/e-NIT /22(15 CFC)/2025-26
Open Tender
CIVIL WORKS
Percentage
30 days
Construction of Additional Class Room at Pala Bas
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,984
6 Mar 2026
24 Feb 2026
2 Mar 2026
24 Feb 2026
28 Feb 2026
24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. . | 1 | %cum | 11,927 | ₹11,915.07 |
| 2 | Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc.layer by layer complete .(payment to be made on the basis of measurement of finished quantity of work). | - | %cum | 7,754 | - |
| 3 | Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes. | - | cum | 6,370.8 | - |
| 4 | Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes. | 1 | cum | 7,238.4 | ₹7,231.16 |
| 5 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. | - | Sqm | 75,332.4 | - |
| 6 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). | 1 | cum | 400.8 | ₹400.4 |
| 7 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 1 | sqm | 1,038 | ₹1,036.96 |
| 8 | Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame excluding cost of concrete, Iron Butt Hinges and M.S clamps. | - | MT | 43,562.4 | - |
| 9 | Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor) | - | M2 | 223.2 | - |
| 10 | Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor) | 1 | M2 | 192 | ₹191.81 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_2489349.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .