Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | -3.70% | ₹2.4 L | L1 | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹4,984
Closing Date
28 Feb 2026, 6:00 pmClosed
EXECUTIVE OFFICER GORUBATHAN PANCHAYAT SAMITI
EXECUTIVE OFFICER GORUBATHAN PANCHAYAT SAMITI OFFICE
Construction of Additional Class Room at Pala Basty SSK under Todey Tangta Gram Panchayat, under Gorubathan Panchayat Samiti
2026_GTA_1013480_2
EO/GBN_PS/e-NIT /22(15 CFC)/2025-26
Open Tender
CIVIL WORKS
30 days
Construction of Additional Class Room at Pala Bas
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,984
6 Mar 2026
24 Feb 2026
2 Mar 2026
24 Feb 2026
28 Feb 2026
24 Feb 2026
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. .
Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc.layer by layer complete .(payment to be made on the basis of measurement of finished quantity of work).
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes.
Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame excluding cost of concrete, Iron Butt Hinges and M.S clamps.
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor)
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor)
Artificial stone in floor, dado, staircase etc. with cement conctrete (1:2:4) with stone chips laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works, using cement @ 1.75 kg./sq.m. all complete including all materials and labour In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted) with ordinary cement. Using grey cement.
White washing including cleaning and smoothening surface thoroughly :All floors:.
Supplying best Indian sheet glass panes set in putty and fitted and fixed with nails and putty complete (In all floors for internal wall & upto 6m height for external wall ).
supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar , end bifurcated with necessary screws etc. by cement concrete (1:2:4) as per direction . ( cost of concrete will be paid separately).
Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark.
(i) Iron hasp bolt of approved quality fitted and fixed complete (oxidised) with 16 mm dia rod with centre bolt and round fitting.
Anodised aliminium D-type handle of approved quality manufactured from extruded section conforming to I.S. specification (I.S.230/72) fitted and fixed complete:.
Galvanized corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugaion minimum side lap. ( payment to be made on area of finished work). (GCI sheet to be supplied by contractor). .
Panel shutters of door and window, as per design (each panel consisting of single plank with out joint), including fitting and fixing the same in position but excluding the cost of hinge and other fittings.In ground floor.(In case of non-supply of single plank, panel rate of reduction of 20% will be made).
M.S. structural works in roof trusses with tubular sections conforming to IS: 806- 1957 & IS: 1161- 1958 connected to one another with bracket,gusset,cleats as per design, direction of Engineer-In-Charge complete including cutting to requisite size. fabrication with necessary metal arc welding conforming to IS: 816- 1956 & IS: 9595 using electrodes of approved make and brand conforming to IS: 814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section. consumables such as electrodes, gas and hire charges of all tools and plants and labour required for the work including all incidental charges such as electricity charges, labour insurance charges etc.(Payment to be made on the basis of calculated weight of structural tubular members as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with the weight of finished structural members. The rates are considered for a height of erection 8m./ 2nd. floor leves from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initial 8m. or part ther of.
Galvanised iron sheet ridging fitted with necessary bolt, screws, washers etc complete. (225 mm end lapping).
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_2489349.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid