Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | -5.00% | ₹2.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.1 L+₹8,471.94 (4.21%)Admitted-Fee/PreQual/Technical/Finance | -1.00% | ₹2.1 L+₹8,471.94 (4.21%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.1 L
EMD Value
₹5,295
Closing Date
10 Aug 2026, 5:00 pmClosed
Assistant Engineer
Office Assistant Engineer LSGD Section Tarur
63/26-27 Renovation of Veterinary Hospital in Tarur GP
2026_LSGD_863422_1
01/AE/LSGD/2026-27
Open Tender
Civil Works - Buildings
Percentage
240 days
Tarur GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹655
Yes
₹5,295
Yes
13 Aug 2026
31 Jul 2026
13 Aug 2026
31 Jul 2026
10 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Building Maintenance | |||||
| 1.001 | 11.41.1:Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 500x500 mm. | - | sqm | 1,673.31 | - |
| 1.002 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | - | sqm | 20.48 | - |
| 1.003 | 13.111.1:Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface | - | sqm | 139.96 | - |
| 1.004 | 13.99.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work | - | sqm | 108.55 | - |
| 1.005 | OD107604/2026-2027:Providing and laying factory made chamfered edge Cement Concrete paver blocks
in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength,
thickness & size/ shape, made by table vibratory method using PU mould, laid in
required colour & pattern over 50mm thick compacted bed of 6mm stone aggregates, compacting and
proper embedding/laying of inter locking paver blocks into the sand bedding layer
through vibratory compaction by using plate vibrator, filling the joints with sand and
cutting of paver blocks as per required size and pattern, finishing and sweeping
extra sand. complete all as per direction of Engineer-in-Charge.60mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern. | 1 | sqm | 1,141.14 | ₹1,140 |
| 1.006 | 50.6.1.1:Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | - | cum | 6,408.03 | - |
| 1.007 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 10,488.77 | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | 112.43 | - |
| 1.009 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | 762.88 | - |
stage.html
html • 0.02 MB
finance_1460515.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_1460515.xls
BOQ • 0.33 MB
viewnit63.pdf
Tender Documents • 0.03 MB
SBD63.pdf
Other Document • 1.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .