| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.9 CrAccepted-AOC C O SRI HANUMAN PRASAD BAJAJ WARD NO 02 U T ROAD P O DIST UDALGURI BTC ASSAM | UDALGURI | ASSAM | 784113 | ₹90.9 Cr Quoted ₹30.9 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹31.0 CrRejected-Finance P O P S UDALGURI WARD NO 2 DIST UDALGURI BTC ASSAM | UDALGURI | ASSAM | 784113 | ₹31.0 Cr | L2 | Rejected-Finance Not admitted |
Tender Value
₹30.9 Cr
EMD Value
₹61.7 L
Closing Date
16 Dec 2023, 1:00 pmClosed
Chief Engineer Minor Irrigation Assam
O_O the Chief Engineer Irrigation Assam Chandmari Ghy-03
KHENGHRAJULI FLOW I_SCHEME UNDER PMKSY _HKKP_SMI FOR THE YEAR 2022 _23 UNDER DHEKIAJULI BARCHALLA DIV I DHEKIAJULI
2023_ID_34170_1
41_SMI_2023_24 Date_23_11_2023
Open Tender
Civil Works
480 days
Dhekiajuli
Please refer Tender documents.
5 documents required · 5 mandatory
₹20,000
₹61.7 L
Yes
4 Jan 2024
23 Nov 2023
16 Dec 2023
23 Nov 2023
16 Dec 2023
24 Nov 2023
Amount
Construction of Cofferdam
Item No. 1 : Earth work in excavation in diversion/ Feeder channel to the designed section and grade by depositing the spoils in the form of embankment on either side in layers not exceeding 15 cm thick including clearing light jungles, Removing trees up to 15 cm dia and uprooting roots and stumps etc. from the seat of embankment and canal and free from all vegetation including breaking clods to not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water where necessary complete as directed. B) In Hard soil (i) Soil mixed with gravel or moram upto 50 mm size Diversion Channel
Item No. 2 : Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 km including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Item No. 3 : Construction of whole Bamboo single pallasiding with matured bholuka bamboo post 7.5 cm to 10 cm dia 5 cm apart 1.5 m to 1.8 m above ground and 1.00 m to 1.2 m below ground with jati bamboo struts placed 1.2 m to 1.5 m apart tied with Galvanised wire with 16 G to 18 G complete with 3 rows of horizontal half jati bamboo kamies complete as directed.
Item No. 4 : Supply and laying of cement bags filled with sand/ earth (as locally available) including stitching the mouth, laying, fixing in position as directed complete with supply of bags, sutlies etc.all complete.
Item No. 5 : Earthwork for removing the cofferdam including depositing the earth near the canal embankment and slopes where necessary including removing the pitched boulders and stacking at safe distance in measurable stacks including ramming, dressing the earth etc. complete as directed.
Item No. 6 : Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of Headworks
Item No. 1 : Preparing / making level the ground surface for layout of Headwork / structures for fixing the required axis line by cutting the high land and filling and levelling the low land where necessary etc, complete as directed.
Item No. 2 : Earthwork in excavation in foundation of structures by means of Hydraulic Excavator in all soils including mud, silt, sady clay from the river bed, etc, including clearing the side, dressing,etc.,and removing the earth by loading to dumpers for farther carrige to asafe distance, complete as directed . (0.30 CuM Bucket) A. Upto river bed level B. Below river bed level
Item No. 3 : Cost of dewatering involved during earthwork in excavation of foundation trenches of canal structures (by pumps) in soil mixed with silt and sand etc. Dewatering by using 1 No. 10 HP and 2 Nos. 5 HP water pump.
Item No. 4 : Carriage of excavated earth by dumpers with a lead upto 2 KM unloading to a safe place as directed including spreading, dressing etc, complete as directed.
Item No. 5 : Providing and driving 'Z' type steel sheet pile of 0.69 M effective width, 8mm thick and average weight 68.30 kg/M to specified level and lines including cutting to proper size, making holes including painting sheet piles with two coats of anticorrosive bitumen paint and dewatering including necessary tools and plants and all other accessories complete as directed. (Portion of sheet pile to be embedded in concrete shall not be painted).
Item No. 6 : CC work in proportion 1:4:8 in foundation/ abutment/ piers/ wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing and dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 7 : CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 8 : RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirt wall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 9 : Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.
Item No. 10 : Centering and shuttering including propping etc. Where necessary and removal of forms after completion of C.C. and RCC work complete as directed (measurement to be on the face area of timber).
Item No. 11 : Providing scaffolding work with rows of Bhaluka bamboo and Jati bamboo horizontal one row jati bamboo cross and placing second class planks of 0.025 m thick in between the rows tying with coir strings lacing two nos. vertical jati bamboo at both end including dismantling the scaffolding etc. complete as directed.
Item No. 12 : Collection of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete.(Quarry distance = 70 Km)
Item No. 13 : Supplying and laying of filter materials consisting of sand and river shingles free from dust dirt and other foreign materials and laying in three layers in position as per drawing and specification as directed by the department.
Item No. 14 : Collection of hard broken stone of size 6 mm to 20 mm from river boulder free from dust and dirt and foreign materials including stacking at quarry site, complete as directed. (in the gap of C.C. block protection)
Item No. 15 : Labour charge for spreading of hard river gravel or broken stone of size 13 mm to 38 mm to the required thickness including dressing and ramming the seat before laying the materials as directed with a lead upto 30 M and lift upto 1.5 M complete as directed.
Item No. 16 : Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and making payment of forest royalty etc, complete as directed.
Item No. 17 : Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M complete as directed.
Item No. 18 : Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. ( Quarry distance = 70 Km) For 1st Km of Quarry Road
Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. ( Quarry distance = 70 Km) For subsequent Km
Item No. 19 : Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Item No. 20 : Cost of dewatering in excavation of earthwork by running required no. of pumps including the cost of POL, hire charge, labour charge etc. and handling for a depth of maximum 3.2 M, complete as directed.
Item No. 21 : Supplying and mixing rapidite in concrete works below ground water level where necessary etc. complete as directed.
Item No. 22 : Providing 75 mm dia. Weep Holes including supplying and fixing 75 mm dia PVC pipe in weep holes, complete as directed.
Item No. 23 : Supplying 1 1/2" dia G.I pipe for hand railing including fitting & fixing the same in position etc, complete as directed.
Construction of Afflux and Guide Bund
Item No. 1 : Earthwork in excavation of deposited silt, sand and river debris from the seat of Guide Bunds /Afflux Bunds,etc. including clearing light jungle, removing tree upto 15 cm dia, and uprooting roots and stumps, etc, from the seat of Guide Bunds / Afflux Bunds, etc. including dressing, carriage of excavated earth and depositing the same in stacks at a distance not less than 80 M from the axis of the Guide Bunds / Afflux Bunds, etc. including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified.
Item No. 2 : Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 km including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Item No. 3 : Earthwork in excavation and removal of swelled up earth mixed with silt and slurry due to sand, bailing out water in foundation trenches upto required level including shuttering, shoring, dewatering by means of pump set etc. removing the spoils to a safer distance etc, complete as directed. (ii) With dewatering For toe wall
Item No. 4 : Collection of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and complete as directed.
Item No. 5 : Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. ( Quarry distance = 70 Km)
Item No. 6 : Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.50 M, complete as directed.
Item No. 7 : CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 8 : RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 9 : Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.
Item No. 10 : Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered).(Abutment / Return Wall / Piers / Pedestal etc.)
Item No. 11 : Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Item No. 12 : Plain CC work in 40% plum hard river boulder of 15 cm to 23 cm size and filled interstices with 60% cement concrete in proportion 1:3:6 with 13 mm to 38 mm size stone aggregate including curing, shuttering etc. complete as directed. (Shuttering cost will be paid separately).
Item No. 13 : Construction of 1.50 M x 1.00 M rectangular boulder sausage including supplying of materials with 25 cm to 30 cm size boulders collecting from a lead of 25 KM encased in 15 cm mesh of 8G hexagonal wire netting and filling the voids between the boulders with stone not exceeding 18 cm in size tied with 8G galvanized tying wire at 30 cm apart, laid in position as directed including necessary local carriage of materials, paying necessary forest royalty including providing 1 (one) no. of jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.20 M apart driven at least 0.60 M below ground and tying with sausage etc, all complete as directed.
Item No. 14 : Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and making payment of forest royalty etc, complete as directed. Boulder apron For 1st Km of Quarry Road
For subsequent Km
Item No. 15 : Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M complete as directed.
Construction of RCC Canal
Item No. 1 : Earth work in excavation in foundation of canal structure in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation etc. complete as directed. (Including bailing out stagnant rain water where necessary). All types of soils except soil mixed with gravel and boulders
Item No. 2 : Collection of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and complete as directed.
Item No. 3 : Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. ( Quarry distance = 70 Km)
Item No. 4 : Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.50 M, complete as directed.
Item No. 5 : CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 6 :Supplying fitting fixing and laying reinforcement (TATA)in position in RCC work including cutting, bending,cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item No. 7 : Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) With 38 mm thick wood plank
Item No. 8 : RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 9 : Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Item No. 10 : Providing 50 mm wide expansion joints with bituminous compound mixed with coarse sand for canal work at an interval of 10.0 M apart including laying, fitting the compound in proper position, etc. complete as directed.
Item No. 11 :Earth work in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 Km. including paying compensation of earth obtained from private land if any, loading, unloading and stacking in measurable stacks not more than 1m height, spreading the same in 15 cm thick including clearing light jungles, removing trees up to 15cm dia uprooting roots and stumps etc. from the seat of embankment, profiling with all lift complete as directed. (Payment will be made after 12.5% shrinkage allowances from the gross quantity.)
Construction of Earthen Canal
Item No. 1 : Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 km including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Construction of Fall 1.5m wide 10m lenght ( for 3 nos)
Item No.: 1:- Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 60 M and lift upto 3.00 M. In hard Soil (ii) Soil mixed with gravel or boulders upto 30 cm size
Item No.: 2:- Collection of sand gravel (40% sand and 60% gravel of gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete.
Item No.: 3:-CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No.: 4 Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & GST
Item No.: 5 Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.5 M, complete as directed.
Item No.: 6: CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No.:7.:- RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirtwall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No.8: Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item No.: 9:- Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
Item No.: 10:- 12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:3
Item No.11: Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of Fall 1.1m wide 10m lenght (for 3 nos)
Item No.: 1:- Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 60 M and lift upto 3.00 M. In hard Soil (ii) Soil mixed with gravel or boulders upto 30 cm size
Item No.: 2:- Collection of sand gravel (40% sand and 60% gravel of gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete.
Item No.: 3:-CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No.: 4 Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & GST
Item No.: 5 Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.5 M, complete as directed.
Item No.: 6: CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No.:7.:- RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirtwall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No.8: Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item No.: 9:- Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
Item No.: 10:- 12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:3
Item No.11: Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of Fall 0.85 m wide 10m lenght (for 2 nos)
Item No.: 1:- Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 60 M and lift upto 3.00 M. In hard Soil (ii) Soil mixed with gravel or boulders upto 30 cm size
Item No.: 2:- Collection of sand gravel (40% sand and 60% gravel of gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete.
Item No.: 3:-CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No.: 4 Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & GST
Item No.: 5 Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.5 M, complete as directed.
Item No.: 6: CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No.:7.:- RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirtwall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No.8: Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item No.: 9:- Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
Item No.: 10:- 12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:3
Item No.11: Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of Fall 0.75 m wide 10m lenght (for 4 nos)
Item No.: 1:- Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 60 M and lift upto 3.00 M. In hard Soil (ii) Soil mixed with gravel or boulders upto 30 cm size
Item No.: 2:- Collection of sand gravel (40% sand and 60% gravel of gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete.
Item No.: 3:-CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No.: 4 Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & GST
Item No.: 5 Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.5 M, complete as directed.
Item No.: 6: CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No.:7.:- RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirtwall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No.8: Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item No.: 9:- Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
Item No.: 10:- 12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:3
Item No.11: Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of Fall 1.1 m wide 10m lenght at chainage 5490.00m (for 1 no)
Item No.: 1:- Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 60 M and lift upto 3.00 M. In hard Soil (ii) Soil mixed with gravel or boulders upto 30 cm size
Item No.: 2:- Collection of sand gravel (40% sand and 60% gravel of gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete.
Item No.: 3:-CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No.: 4 Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & GST
Item No.: 5 Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.5 M, complete as directed.
Item No.: 6: CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No.:7.:- RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirtwall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No.8: Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item No.: 9:- Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
Item No.: 10:- 12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:3
Item No.11: Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
construction of RCC Aqueduct at LBMC
Item No.: 1:- Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 60 M and lift upto 3.0 M.
Item No.: 2:-Cost of dewatering involved during earthwork in excavation of foundation trenches of canal structures(by pump) in soil mixed with silt and sand etc. Dewatering by using 1 no. 10 HP and 1 no. 5 HP water pump.
Item No.: 3:-CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No.4: CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No.5 :- RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirtwall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No.6:- Supplying of quick setting concrete admixture of specified brand including loading and unloading, carriage to the work site, complete as directed.
Item No.: Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item No.8 :- Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
Item No.9:- 12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:3
Item No.10: Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Item No.11: Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and making payment of forest royalty etc, complete as directed.
Item No.12:Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & GST
Item No.13: Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.5 M, complete as directed.
Item No.14:- Dewatering of CC works considering 1 no. 10 HP and 1 no. of 5 HP pump including POL, carriage and operator's pay etc. (ii) With Contractor's Profit & GST
Item No.15:Providing 75 mm dia. Weep Holes including supplying and fixing 75 mm dia PVC pipe in weep holes, complete as directed.
construction of RCC Aqueduct at RBMC
Item No.: 1:- Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 60 M and lift upto 3.0 M.
Item No.: 2:-Cost of dewatering involved during earthwork in excavation of foundation trenches of canal structures(by pump) in soil mixed with silt and sand etc. Dewatering by using 1 no. 10 HP and 1 no. 5 HP water pump.
Item No.: 3:-CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No.4: CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No.5 :- RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirtwall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No.6:- Supplying of quick setting concrete admixture of specified brand including loading and unloading, carriage to the work site, complete as directed.
Item No.: Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item No.8 :- Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
Item No.9:- 12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:3
Item No.10: Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Item No.11: Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and making payment of forest royalty etc, complete as directed.
Item No.12:Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & GST
Item No.13: Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.5 M, complete as directed.
Item No.14:- Dewatering of CC works considering 1 no. 10 HP and 1 no. of 5 HP pump including POL, carriage and operator's pay etc. (ii) With Contractor's Profit & GST
Item No.15:Providing 75 mm dia. Weep Holes including supplying and fixing 75 mm dia PVC pipe in weep holes, complete as directed.
Construction of Road crossing Slab Culvert (3.2m) (7 nos)
[§ Item No.: 6.4]:- Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). (A) In all types of soils (except soil mixed with gravel and boulders) (ii) For lead upto 60 M and lift of 3 M
[§ Item No.: 10.3:A:(iii)] CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
[§ Item No.: 10.2:A:(iii)] CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately)
[§ Item No.: 12.1.(ii)]:- RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirtwall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
[§ Item No.: 12.3 ] Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed. Quantity :Provide nominal reinforcement Abudment wall,wing wall
[§ Item No.: 9.1.C]:- Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
[§ Item No.: 9.1.A]:- Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
[§ Item No.: 14.2]:- 12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:3
[§ Item No.: 6.27] Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of Road Crossing Box Culvert ( Size-1.80m x1.80m ) (for 3 Nos)
Item No. 1 : Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing in foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compaction, complete as directed. (Including bailing out stagnant rain water where necessary). a. All type of soil except soil mixed with gravel and boulders For normal lead of 30m and lift of 1.50m
Item No. 2 : Collection and supply of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete.(Quarry distance = 70.00 Km. Quarry=Rowta)
[Item No.: 3] Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & GST
Item No. 4 : Labour charge for spreading of hard river gravel or broken stone of size 13 mm to 38 mm to the required thickness including dressing and ramming the seat before laying the materials as directed with a lead upto 30 M and lift upto 1.5 M complete as directed.
Item No. 5 : CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 6 : Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.
Item No. 7 : Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
Item No. 8 : RCC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing including bailing out water with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No.9 : 12 mm thick cement plastering including clearing surface and curing complete as directed in prop. 1:3
Item No. 10 : Making and maintaining sub-way 3 M wide including providing barrier and sign board and lamp etc.
Item No.11 : Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of HP outlet ( For 60 Nos)
Item No. 1: Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing in foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compaction, complete as directed. (Including bailing out stagnant rain water where necessary). a. All type of soil except soil mixed with gravel and boulders. For normal lead of 30m and lift of 1.50m
Item No. 2 : CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 3 : Supply and carriage of 150mm dia R.C.C. hume pipe from factory to the work site by truck including loading and unloading at both ends complete.
Item No. 4 : Labour for fitting and fixing Hume Pipe in position with collers including joining the joints in cement mortar in prop. 1:3 and curing including carrying the same from the godown to site and complete as directed.
Item No. 5 :14.2 (ii): 12 mm thick cement plastering including clearing surface and curing complete as directed. In prop. 1:4
Item No. 6.: Earthwork in back filling of structure, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of Cattle Crossing at RBMC RCC Canal (span 1.85 m) (For 6 Nos)
Item No.1: Supplying, fitting, fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking, tying, complete as directed. Cattle crossing slab: Transverse reinf., 12mm Ø @ 100 C/C, bottom
Item No.2: R.C.C. work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No.3: Centering and shuttering including propping etc. where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). Shuttering (Beam) without Prop.
Construction of Cattle Crossing at LBMC RCC Canal (span 1.4 m) (For 2 Nos)
Item No.1: Supplying, fitting, fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking, tying, complete as directed. Cattle crossing slab: Transverse reinf., 12mm Ø @ 100 C/C, bottom
Item No.2: R.C.C. work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No.3: Centering and shuttering including propping etc. where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). Shuttering (Beam) without Prop.
Construction of Cattle Crossing at Earthen Canal (span 1.8 m) (For 8 Nos)
Item No. 1: Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing in foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compaction, complete as directed. (Including bailing out stagnant rain water where necessary). a. All type of soil except soil mixed with gravel and boulders. For normal lead of 30m and lift of 1.50m
Item No. 2 : CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 3 :CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing including dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No.1: Supplying, fitting, fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking, tying, complete as directed. i) 10 mm dia bars ii) 12 mm dia bars
Item No. 5 : Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) With 38 mm thick wood plank
Item No. 6: 12 mm cement plastering including clearing surface and curing, complete as directed. (ii) In proportion 1:3
Item No. 7: Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of Cattle Cart Crossing on Earthen Canal (For 10 Nos)
Item No.1:- Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 30 M and lift upto 1.50 M. In hard Soil (ii) Soil mixed with gravel or boulders upto 30 cm size
Item No.:2:- Collection of sand gravel (40% sand and 60% gravel of gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete.
Item No.3:-CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
Item No.4 Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.5 M, complete as directed.
Item No.5: Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & GST
.Item No.6:- RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirtwall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
[§ Item No.7:Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item No.8:- Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
Item No.9:-Providing 75 mm dia. Weep Holes including supplying and fixing 75 mm dia PVC pipe in weep holes, complete as directed.
Item No.10: Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Item No.11:- Dewatering of CC works considering 1 no. 10 HP and 1 no. of 5 HP pump including POL, carriage and operator's pay etc. (ii) With Contractor's Profit & GST
Construction of 0.60M dia HP double barrel Cross Drainage Works ( For 7 Nos)
Item No. 1 : Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing in foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compaction, complete as directed. (Including bailing out stagnant rain water where necessary). A. All types of soils except soil mixed with gravel and boulders i. For normal lead 30m and lift of 1.50m
Item No. 2 : CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 3 : 10.2:A(iii): CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 13 mm to 38 mm including curing including dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 4 : Supplying of 0.60M dia RCC Hume Pipe with carriage complete as directed. A. Hume pipe
Supplying of 0.60M dia RCC Hume Pipe with carriage complete as directed. B. Collar
Item No. 5 : Labour for fitting and fixing hume pipe in position with collars including joining the cement mortar in proportion 1:3 and curing, including carrying the same from godown to site and complete as directed.
Item No. 6 : Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) With 38 mm thick wood plank
Item No. 7 : 12 mm thick cement plastering including clearing surface and curing complete as directed. In prop. 1:4
Item No. 8 : Earthwork in back filling of structure, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of Approach Road
Item No. 1:6.26: Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layer not exceeding 15cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat at embankment and borrow pit area, breaking clods not more than 10mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M complete as directed.
Item No. 2 : 1.6: Collection and supply of sand and gravel (40% sand and 60% gravel) of size 13mm to 38mm from approved quarry including loading, unloading and stacking in measurable stacks at work site up to a height of 1.00m including payment of forest royality etc.
Item No. 3 :Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. Quarry distance 70 km
Item No. 4 : Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30.00 M and lift 1.50 M. Complete as directed.
Construction of RCC 4 Cell Box Culvert (Size of One Cell: 3.50m x 2.50 m)
Item No. 1 : Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing in foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compaction, complete as directed. (Including bailing out stagnant rain water where necessary). A. All types of soils except soil mixed with gravel and boulders i. For normal lead 30m and lift of 1.50m
Item No. 2 : Collection and supply of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete.(Quarry distance = 55.00 Km. Quarry=Rowta)
[Item No.: 3] Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & GST
Item No. 4 : Labour charge for spreading of hard river gravel or broken stone of size 13 mm to 38 mm to the required thickness including dressing and ramming the seat before laying the materials as directed with a lead upto 30 M and lift upto 1.5 M complete as directed.
Item No. 5 : CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 6 : Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Item No. 7 : Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
Item No. 8 : RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 9 : Dewatering of CC works considering 1 no. 10 HP and 1 no. of 5 HP pump including POL, carriage and operator's pay etc.
Item No. 10 : Supplying and mixing rapidite in concrete works below ground water level where necessary etc. complete as directed.
Item No. 11 : Collection and supply of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and making payment of forest royalty etc, complete as directed.
Item No. 12 : Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M complete as directed.
Item No. 13 : Supplying 1 1/2" dia G.I pipe for hand railing including fitting & fixing the same in position etc, complete as directed.
Item No. 14 : Earth work in back filling of structure obtained earth from outside borrow pits filling in 15cm layers, ramming, dressing, waering including paying compensation of land if any etc. complete as directed ( with lead up to 30 m and lift 1.50 m).
Item No. 15 : Construction of 1.50 M x 1.00 M rectangular boulder sausage including supplying of materials with 25 cm to 30 cm size boulders collecting from a lead of 25 KM encased in 15 cm mesh of 8G hexagonal wire netting and filling the voids between the boulders with stone not exceeding 18 cm in size tied with 8G galvanized tying wire at 30 cm apart, laid in position as directed including necessary local carriage of materials, paying necessary forest royalty including providing 1 (one) no. of jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.20 M apart driven at least 0.60 M below ground and tying with sausage etc, all complete as directed.
Item No. 16 : Earthwork in excavation in foundation of structures by means of Hydraulic Excavator in all soils including mud, silt, sady clay from the river bed, etc, including clearing the side, dressing,etc.,and removing the earth by loading to dumpers for farther carrige to asafe distance, complete as directed . (0.30 CuM Bucket)
Item No. 17 : Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Item No. 16: Plain CC work in 40% plum hard river boulder of 15 cm to 23 cm size and filled interstices with 60% cement concrete in proportion 1:3:6 with 13 mm to 38 mm size stone aggregate including curing, shuttering etc. complete as directed. (Shuttering cost will be paid separately).
Construction of a 4.40 m wide causeway
Item No. 1 : Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing in foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compaction, complete as directed. (Including bailing out stagnant rain water where necessary). A. All types of soils except soil mixed with gravel and boulders i. For normal lead 30m and lift of 1.50m
Item No. 2 : CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Item No. 3 : CC work in proportion 1:2:4 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 6mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessary,complete asdirected. (Shuttering, scaffolding cost will be paid
Item No. 4: Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.)
Item No. 5 : Collection and supply of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and making payment of forest royalty etc, complete as directed.
Item No. 6 : Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M complete as directed.
Item No. 7 : Earth work in back filling of structure obtained earth from outside borrow pits filling in 15cm layers, ramming, dressing, waering including paying compensation of land if any etc. complete as directed ( with lead up to 30 m and lift 1.50 m).
Item No. 8 : Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Construction of S.A Quarter
Item No. 1 :Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
Item No. 2 :Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks.
Item No. 3 :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
Item No. 4 :Steel reinforcement for R... Work inluding sraitaning, leaning utting and bending to proper shape plaing in position and binding up to plinth level. 5.22.6. TMT bar Fe500D or more.
Item No. 5 :Centering and shuttering inluding strutting, propping etc end removal of the same…
Item No. 6 :Lintels, beams, plinth beams, girders, bressumers and cantilevers
Item No. 7 :Columns, Pillars, Posts & Strut
Item No. 8 :Suspended floors, roofs, landings, balconies and access platform
Item No. 9 :Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
Item No. 10 :Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement
Item No. 11 :Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
Item No. 12 :Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Item No. 13 :Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources)
Item No. 14 :Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level.
Item No. 15 :15 mmthick cement plaster in single coat on rough side of single or half brick wall
Item No. 16 :15 mm cement plaster on the rough side of single or half brick wall of mix :13.2.2 1:6 (1 cement: 6 fine sand)
Item No. 17 :15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix :
Item No. 18 :Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 6 graded stone aggregate 20 mm nominal size (Recycled Concrete Aggregate (RCA) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth
Item No. 19 :Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or dash fastener shall be paid for separately)
Item No. 20 :Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows, fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. (Note:- Butt hinges and necessary screws shall be paid separately)
Item No. 21 :Providing and fixing double glazed hermetically sealed glazing in aluminium windows, ventilators and partition etc. with 6 mm thick clear float glass both side, having 12 mm air gap, including providing EPDM gasket, perforated aluminium spacers, desiccants, sealant (Both primary and secondary sealant) etc. as per specifications, drawings and direction of Engineer-in-charge complete.
Item No. 22 :Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. 9.48.1 Fixed to steel windows by welding
Item No. 23 : Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel rimer, including welding and bolted with special shaped washers etc. complete. 10.16.1 Hot finished welded type tubes
Item No. 24 :Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.12.1.3 0.63 mm thick with zinc coating not less than 275 gm/ m²
Item No. 25 :Providing ridges or hips of width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete. 12.4.2 0.63 mm thick with zinc coating not less than 275 gm/m²
Item No. 26 :Providing and fixing 15 mm thick false ceiling tiles at all heights with integral densified calcium silicate reinforced with fibre and natural filler false ceiling tiles of Size 595x595 mm of approved texture, design and patterns having NRC (Noise Reduction coefficient) of 0.50 (minimum) as per IS 8225:1987, Light reflectance of 85% (minimum). Non combustible as per BS:476 (part-4), fire performance as per BS:476 (part 6 &7), humidity resistance of 100%, thermal conductivity < 0.043 W/m K as per ASTM 518:1991,in true horizontal level on theexisting frame work consisting of T-sections and Lsections suitably fixed according to tile size as per direction of Engineer-in-charge.
Item No. 27 :CEMENT PAINT & PRIMER White washing with lime to give an even shade : 13.37.1 New work (three or more coats)
Item No. 28 :PLASTER OF PARIS & WALL PUTTY Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete
Item No. 29 :Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : 13.48.1 Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm
Item No. 30 :Providing and applying two coats of fire retardant paint on cleaned wood / ply surface @ 3.5 sqm per litre per coat including preparation of base surface as per recommendations of manufacturer to make the surface fire retardant
Item No. 31 : Finishing walls with water proofing cement paint of required shade : 13.44.1 New work (Two or more coats applied @ 3.84 kg/10 sqm)
Item No. 32 :With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works
Item No. 33 :Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture
Item No.34 :Sanitary and water supply & sanitary works (Items and rates as per TS estimate)
Construction of Temporary Shed
Item No. 1 :-Construction of temporary shed with 0.30 M high earth plinth and floor with bhaluka bamboo post of size 100 mm to 120 mm dia driven at least 0.75 M below GL and 2.75 M above plinth split jati bamboo walling tied with 3 lines of half bamboo (jati) kamies with 0.63 mm thick GCI sheet roofing over jati bamboo framing with whole bamboo struts fitted with post plate of bamboo purlins tied with galvanized wire, coir string including providing single dharamat jhap doors and windows, complete as directed
Item No. 2:-Split jati bamboo janana fencing upto 1.83 M to 2.10 M high woven with double longitudinal kamies 60 cm to 75 cm apart with bhaluka bamboo post 1.50 M to 1.80 M apart driven atleast 70 cm below ground and four lines of half bamboo kamies tied with wire with post and complete as directed. (Including supplying all materials)
Item No. 3 : Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding15 cm thick including clearing light jungle, removingtrees upto 15 cm dia and uprooting roots and stumpsfromthe seat of embankment and borrow pit area,breaking clods not more than 10 mm cube, ramming,watering, dressing and roughening the seat ofembankment, profiling etc. Paying compensation ofearth borrowed from private or forest land if any, leadupto 30 M and lift upto 1.5 M, complete as directed. B) Hard soil ( soil mixed with gravel or moorum up to 50mm size
Item No. 4 :Earthwork in excavation in irrigation canal to the designsection and grade by depositing the spoils in the form of embankment in 15 cm layers on both banks asnecessary including clearing light jungle, removing treesupto 15 cm dia and uprooting roots and stumps etc.from the seat of the embankment and canal free fromall vegetation including breaking clods not more than 10mm cube, ramming, dressing and roughening the seat of the embankment with a lead upto 30 M and lift upto1.50 M, complete as directed. B) Hard soil ( soil mixed with gravel or moorum up to 50mm size
Item No. 5 : Collection of sand gravel (40% sand and 60% gravel of gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and as directed complete as directed.
Item No. 6 :Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & GST
Item No. 7 : Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.5 M, complete as directed.
Item No. 8 :CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone aggregate of size 13 mm to 38 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). A) River shingles (i) without shuttering & without dewatering
Item No. 9 : Providing fitting and fixing vitreous water closet squatting pan (Indian type W.C Orissa pattern) with all fittings and fixtures complete including cutting and making good to the walls and floors whereever required. (Flushing Cistern to be paid separately) Indian type W.C Orissa pattern of size 580 x 440 mm a) White Indian type W.C Orissa pattern of size 580 x 440 mm i) Parryware make
Item No10 : Supplying, fitting, fixing PVC pipes (IS 12818, 6 kg/cm2), joining pipes with relevant cement, levelling, testing leakages etc, complete as directed. (Cost of E/W foundation trenches will be paid separately) (ii) For 160 mm dia
Item No. 11 :Making soak pit 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with bricks and S.W. drain pipe 100 mm diameter, 1.8 m long complete as per standard design. 19.32.1 With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
construction of Sign Board
Item No. 1 : Supply of sign board made of 1.60mm thick MS iron sheet fitted with steel frame of size 1.05 m x 0.75m fixed with 2 Nos. 50mm dia GI (medium) pipes 2.10m above and 0.60m below ground fitted with C.C. work in proportion 1:3:6 and size 0.45m x 0.45m x 0.60m below ground including painting with approved paint including writing letters complete as directed.
Mechanical Part
Cross Regulator Gates Shutter Assembly : Supply, fabrication, installation and commissioning at site including painting of CROSS REGULATOR steel gate [size: 3.30 x 2.00 M]made of 6 mm thick M.S. skin plate, with 10 mm dia. hole to be drilled at an interval of 150 mm apart on both the vertical sides and one horizontal side at the bottom at a fixed distance from the edge, and MS channel of size 150 mm x 75 mm x 5.4 mm for shutter frame, Horizontal girders and vertical stiffeners,fitting fixing of C.I. Guide Roller of size 75 mm x 67 mm x 100 mm x 20 mm having 25 mm dia hole with pin Guide roller M.S. bracket of size 90 mm x 90 mm x 250 mm made of 20 mm thick and 90 mm wide M.S. Flat with guide roller pin fitted on the shutter frame, having required slots and holes and supply, fitting and fixing of ‘J’ type rubber seal, of size 125 mm , with fabricated M.S. fastener of 50 mm width x 8 mm thick having 10 mm dia. hole at an interval of 150 mm apart for Regulator Gates complete as per design & drawing & as directed by the department. The Job also includes the followings- (As per Part I & Annexure I) Guide Channel Assembly : Supply, fabrication, installation and commissioning including painting at site of guide channel assembly with fabricated MS channel of size ISMC : 200 ( 200 mm x 75 mm x 6.1 mm) up to a required length having holes of 19 mm dia at a distance of 20 mm from the outer edge and at an interval of 500 mm vertically for fitting of separator stud including anchoring at pier groove , anchoring to footing with MS plate of size 400 mm x 400 mm x 6 mm thick , MS separator stud of 19 mm dia threaded at both end x 400 mm L with washer , GI pipe separator of 25 mm dia, Embedded Chanel of size ISMC 200 in complete for Regulator gates as per design & drawing & as directed. Lifting Arrangement : Supply, Fabrication, installation and commissioning including greasing, painting, etc. at site and fitting fixing of Lifting Arrangement of Regulator gate with counter weight mechanism including M.S. Screw shaft of 63mm along with C.I. Boss of size 200 mm x 200 mm, thrust bearing of 65mm (ID) , C.I. Grooved Pulley of size 250 mm dia and 150 mm dia , C.I. counter weight of size 375 mm dia x 37 mm thick of approx weight 30 kg each as stated in the design , fabricated M.S. hook for holding counter weight , tested quality steel wire rope of size 19 mm dia and required length, operating wheel made of GI Pipes of 25 mm dia , securely fixed with lock plate & tool plate on fabricated tool post made of MS Tee bar 80 x 80 x 8mm fitting fixing of all these items complete as per design & drawing and as directed.
Plateform Assembly : Supply, Fabrication, installation and commissioning including painting and fitting –fixing of fabricated platform assembly at site of Regulator gate and 1.25 M width with 2 nos top beam channel of size 200 mm x 75 mm x 6.1 mm, securely welded to supporting channel of size 125mm x 65mm x 5mm fabricated M.S. checkered plate, 5 mm thick and M.S. cross channel of size 100 mm x 50 mm x 4.7 mm for supporting platform having required number of slots and holes for the passage of wire rope and fitting of screw shaft assembly and M.S. Channel of length 1.25 M each to be welded at a distance of 0.50 M apart (Approx) across the top supporting beam with top beam and platform plate , to be welded with top channel and platform plate, GI pipe of 25 mm dia security railing(2 rows) with ISA6565 angle at approx. distance of 1.0 M and height 1.0 M on both side complete as per design & drawing and as directed. Size of Plateform = 38.00 M x 1.25 M = 54.25 Sqm ] ( Mech SOR 2023-24)
MS Ladder : Supply, Fabrication, Erection /Installation including Painting and fitting –fixing of fabricated MS Ladder of 0.75 M width and required length on the side of Regulator gate made of M.S. Channel ISMC : 100 (100mm x 50mm x 4.7mm ) M.S. plate (checkered) 6 mm thick and 25 mm dia , G.I. pipe . The ladder consist of inclined bar of M.S. Channel, horizontal member for numbers of steps as required, Railing post of M.S. Angle of size ISA 6565 and G.I. pipe railing of size 25 mm(ID) in complete as directed. ( Mech SOR 2023-24) [ Any C C work to be measured extra]
Head Regulator Gates (Right Bank)
Shutter Assembly : Supply, fabrication, installation and commissioning at site including painting of right bank HEAD REGULATOR steel gate [size: 1.8 M x 1.9 M]made of 6 mm thick M.S. skin plate, with 10 mm dia. hole to be drilled at an interval of 150 mm apart on both the vertical sides and one horizontal side at the bottom at a fixed distance from the edge, and MS channel of size 150 mm x 75 mm x 5.4 mm for shutter frame, Horizontal girders and vertical stiffeners,fitting fixing of C.I. Guide Roller of size 75 mm x 67 mm x 100 mm x 20 mm having 25 mm dia hole with pin Guide roller M.S. bracket of size 90 mm x 90 mm x 250 mm made of 20 mm thick and 90 mm wide M.S. Flat with guide roller pin fitted on the shutter frame, having required slots and holes and supply, fitting and fixing of ‘J’ type rubber seal, of size 125 mm , with fabricated M.S. fastener of 50 mm width x 8 mm thick having 10 mm dia. hole at an interval of 150 mm apart for Regulator Gates complete as per design & drawing & as directed by the department. The Job also includes the followings- ( As per Part II & Annexure II) Guide Channel Assembly : Supply, fabrication, installation and commissioning including painting at site of guide channel assembly with fabricated MS channel of size ISMC : 200 ( 200 mm x 75 mm x 6.1 mm) up to a required length having holes of 19 mm dia at a distance of 20 mm from the outer edge and at an interval of 500 mm vertically for fitting of separator stud including anchoring at pier groove , anchoring to footing with MS plate of size 400 mm x 400 mm x 6 mm thick , MS separator stud of 19 mm dia threaded at both end x 400 mm L with washer , GI pipe separator of 25 mm dia, Embedded Chanel of size ISMC 200 in complete for Regulator gates as per design & drawing & as directed. Lifting Arrangement : Supply, Fabrication, installation and commissioning including greasing, painting, etc. at site and fitting fixing of Lifting Arrangement of Regulator gate with counter weight mechanism including M.S. Screw shaft of 50 mm dia along with C.I. Boss of size 150 mm x 200 mm, thrust bearing of 55 mm (ID) , C.I. Grooved Pulley of size 250 mm dia and 150 mm dia , required nos C.I. counter weight of size 375 mm dia x 37 mm thick of approx weight 30 kg each, fabricated M.S. hook for holding counter weight , tested quality steel wire rope of size 16 mm dia and required length, operating wheel made of GI Pipes of 25 mm dia , securely fixed with lock plate & tool plate on fabricated tool post made of MS Tee bar 80 x 80 x 8mm fitting fixing of all these items complete as per design & drawing and as directed.
Plateform Assembly : Supply, Fabrication, installation and commissioning including painting and fitting –fixing of fabricated platform assembly at site of Regulator gate and 1.6 M width with 2 nos top beam channel of size 200 mm x 75 mm x 6.1 mm, securely welded to supporting channel of size 100mm x 50mm x 5.7 mm fabricated M.S. block sheet , 4 mm thick and M.S. cross channel of size 100 mm x 50 mm x 4.7 mm for supporting platform having required number of slots and holes for the passage of wire rope and fitting of screw shaft assembly and M.S. Channel of length 1.6 M each to be welded at a distance of 0.50 M apart (Approx) across the top supporting beam with top beam and platform plate , to be welded with top channel and platform plate, GI pipe of 25 mm dia security railing(2 rows) with ISA6565 angle at approx. distance of 1.0 M and height 1.0 M on both side complete as per design & drawing and as directed.Size of Plateform = 2.5 M x 1.25 M = 3.125 Sqm ] ( Mech SOR 2023-24)
Plateform Assembly : Supply, Fabrication, installation and commissioning including painting and fitting –fixing of fabricated platform assembly at site of Regulator gate and 1.6 M width with 2 nos top beam channel of size 200 mm x 75 mm x 6.1 mm, securely welded to supporting channel of size 100mm x 50mm x 5.7 mm fabricated M.S. block sheet , 4 mm thick and M.S. cross channel of size 100 mm x 50 mm x 4.7 mm for supporting platform having required number of slots and holes for the passage of wire rope and fitting of screw shaft assembly and M.S. Channel of length 1.6 M each to be welded at a distance of 0.50 M apart (Approx) across the top supporting beam with top beam and platform plate , to be welded with top channel and platform plate, GI pipe of 25 mm dia security railing(2 rows) with ISA6565 angle at approx. distance of 1.0 M and height 1.0 M on both side complete as per design & drawing and as directed.Size of Plateform = 2.5 M x 1.25 M = 3.125 Sqm ] ( Mech SOR 2023-24)
Head Regulator Gates (Left Bank)
Shutter Assembly : Supply, fabrication, installation and commissioning at site including painting of right bank HEAD REGULATOR steel gate [size: 1.8 M x 1.9 M]made of 6 mm thick M.S. skin plate, with 10 mm dia. hole to be drilled at an interval of 150 mm apart on both the vertical sides and one horizontal side at the bottom at a fixed distance from the edge, and MS channel of size 150 mm x 75 mm x 5.4 mm for shutter frame, Horizontal girders and vertical stiffeners,fitting fixing of C.I. Guide Roller of size 75 mm x 67 mm x 100 mm x 20 mm having 25 mm dia hole with pin Guide roller M.S. bracket of size 90 mm x 90 mm x 250 mm made of 20 mm thick and 90 mm wide M.S. Flat with guide roller pin fitted on the shutter frame, having required slots and holes and supply, fitting and fixing of ‘J’ type rubber seal, of size 125 mm , with fabricated M.S. fastener of 50 mm width x 8 mm thick having 10 mm dia. hole at an interval of 150 mm apart for Regulator Gates complete as per design & drawing & as directed by the department. The Job also includes the followings- ( As per Part II & Annexure II) Guide Channel Assembly : Supply, fabrication, installation and commissioning including painting at site of guide channel assembly with fabricated MS channel of size ISMC : 200 ( 200 mm x 75 mm x 6.1 mm) up to a required length having holes of 19 mm dia at a distance of 20 mm from the outer edge and at an interval of 500 mm vertically for fitting of separator stud including anchoring at pier groove , anchoring to footing with MS plate of size 400 mm x 400 mm x 6 mm thick , MS separator stud of 19 mm dia threaded at both end x 400 mm L with washer , GI pipe separator of 25 mm dia, Embedded Chanel of size ISMC 200 in complete for Regulator gates as per design & drawing & as directed. Lifting Arrangement : Supply, Fabrication, installation and commissioning including greasing, painting, etc. at site and fitting fixing of Lifting Arrangement of Regulator gate with counter weight mechanism including M.S. Screw shaft of 50 mm dia along with C.I. Boss of size 150 mm x 200 mm, thrust bearing of 55 mm (ID) , C.I. Grooved Pulley of size 250 mm dia and 150 mm dia , required nos C.I. counter weight of size 375 mm dia x 37 mm thick of approx weight 30 kg each, fabricated M.S. hook for holding counter weight , tested quality steel wire rope of size 16 mm dia and required length, operating wheel made of GI Pipes of 25 mm dia , securely fixed with lock plate & tool plate on fabricated tool post made of MS Tee bar 80 x 80 x 8mm fitting fixing of all these items complete as per design & drawing and as directed.
Plateform Assembly : Supply, Fabrication, installation and commissioning including painting and fitting –fixing of fabricated platform assembly at site of Regulator gate and 1.6 M width with 2 nos top beam channel of size 200 mm x 75 mm x 6.1 mm, securely welded to supporting channel of size 100mm x 50mm x 5.7 mm fabricated M.S. block sheet , 4 mm thick and M.S. cross channel of size 100 mm x 50 mm x 4.7 mm for supporting platform having required number of slots and holes for the passage of wire rope and fitting of screw shaft assembly and M.S. Channel of length 1.6 M each to be welded at a distance of 0.50 M apart (Approx) across the top supporting beam with top beam and platform plate , to be welded with top channel and platform plate, GI pipe of 25 mm dia security railing(2 rows) with ISA6565 angle at approx. distance of 1.0 M and height 1.0 M on both side complete as per design & drawing and as directed. Size of Plateform = 2.5 M x 1.25 M = 3.125 Sqm ] ( Mech SOR 2023-24)
MS Ladder : Supply, Fabrication, Erection /Installation including Painting and fitting –fixing of fabricated MS Ladder of 0.75 M width and required length on the side of Regulator gate made of M.S. Channel ISMC : 100 (100mm x 50mm x 4.7mm ) M.S. plate (checkered) 6 mm thick and 25 mm dia , G.I. pipe . The ladder consist of inclined bar of M.S. Channel, horizontal member for numbers of steps as required, Railing post of M.S. Angle of size ISA 6565 and G.I. pipe railing of size 25 mm(ID) in complete as directed. ( Mech SOR 2023-24) [ Any C C work to be measured extra]
Shutter Assembly (Size of the Gate = (B X H) = 1.0 M x .75 M = 0.75 Sqm [1( One) Nos])
Supply, Fabrication, Installation and Commissioning at site including painting of Shutter Assembly of Cross Regulator/ Head Regulator gates of different size made of 6 mm thick M.S. skin plate, with 10 mm dia. hole to be drilled at an interval of 150 mm apart on both the vertical sides and one horizontal side at the bottom at a fixed distance from the edge, and MS channel of size 100 mm x 50 mm x 4.7 mm or 125 mm x 65 mm x 5 mm for shutter frame, Horizontal girders and vertical stiffeners , fitting fixing of C.I. Guide Roller of size 75 mm x 67 mm x 100 mm x 20 mm having 25 mm dia hole with pin Guide roller M.S. bracket of size 90 mm x 90 mm x 250 mm made of 12 mm thick and 90 mm wide M.S. Flat with guide roller pin fitted on the shutter frame, having required slots and holes and supply, fitting and fixing of ‘J’ type rubber seal, of size 125 mm , ‘J’ type rubber seal corner of size 125 mm , with fabricated M.S. fastener of 50 mm width x 8 mm thick having 10 mm dia. hole at an interval of 150 mm apart for Regulator Gates complete as per design & drawing & as directed. B] C/Regulator & H/Regulator GATES OF SIZE less than 5.0 M2 ( Size of Gate = 1.0 M x 0.75 M = 0.75 Sqm)
Guide Channel Assembly Supply, fabrication, installation and commissioning including painting at site of guide channel assembly with fabricated MS channel of size ISMC : 200 ( 200 mm x 75 mm x 6.1 mm) up to a required length having holes of 19 mm dia at a distance of 20 mm from the outer edge and at an interval of 500 mm vertically for fitting of separator stud including anchoring at pier groove , anchoring to footing with MS plate of size 400 mm x 400 mm x 6 mm thick , MS separator stud of 19 mm dia threaded at both end x 400 mm L with washer , GI pipe separator of 25 mm dia, Embedded Chanel of size ISMC 200 in complete for Cross/ Head Regulator gates as per design & drawing & as directed. ( Length of Guide Channel taking 1 M allowance = 2 x 0.75 M + 1M = 2.5 M ) [Measurement to be done as height of Guide Chanel Assembly as a whole, not for individual channel length.
Lifting Arrangement Supply, Fabrication, installation and commissioning including greasing, painting, etc. at site and fitting fixing of Lifting Arrangement for Regulator gate manually operated including M.S. Screw shaft of 40 mm/ 50mmdia along with C.I. Boss of size 150 mm x 200 mm , thrust bearing of 45 mm/55 mm (ID) ,operating wheel made of GI Pipes of 25 mm dia , securely fixed with lock plate & tool plate on fabricated tool post made of MS Tee bar 80 x 80 x 8mm fitting fixing of all these items complete as per design & drawing and as directed.
Sri Minon Mochahari
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid