| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.8 LAccepted-AOC 15 RAM ARCADE STATION ROAD ANAND ANAND GUJARAT 388001 | ANAND | GUJARAT | 388001 | ₹2.8 L | 1 | Accepted-AOC L1 BIDDER |
| 2 | 2₹2.8 L+₹28 (<0.01%)Rejected-Finance VILL BANIBADA BELIAKHALI P O NIKARIGHATA P S CANNING SOUTH 24 PARGANAS PIN 743329 | CANNING | SOUTH 24 PARGANAS | WEST BENGAL | 743329 | ₹2.8 L+₹28 (<0.01%) | 2 | Rejected-Finance L3 |
| 3 | 3₹2.8 L+₹56 (0.02%)Rejected-Finance NO 1 DIGHIRPAR P O WEST DIGHIRPAR P S CANNING DIST SOUTH 24 PGS | CANNING | SOUTH 24 PARGANAS | WEST BENGAL | ₹2.8 L+₹56 (0.02%) | 3 | Rejected-Finance L2 |
Tender Value
₹2.8 L
EMD Value
₹5,609
Closing Date
12 Mar 2026, 5:00 pmClosed
Executive Engineer_II, JID
Office of the Executive Engineer_II, JID
M R To 4 Nos Sluice Gate With Necessary Accessories Civil Work At Mz- Ramnagar Abad, D.K Durgapur, Purnachandrapur, Indranarayanpur Facing River Gobadia , Mridangabhanga For The Year 2026-27 Under JID S24 pgs (2nd call eNIT_05_Sl32)
2026_IWD_1016882_5
WBIW/EE-II/JOY/NIT- 6(e)/2025-26
Open Tender
CIVIL WORKS
Percentage
21 days
Kuemari
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,609
Yes
11 Sept 2026
5 Mar 2026
13 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes. (i) Pakur variety | 1.62 | Cum | 6,999.9 | ₹11,339.84 |
| 2 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (i) 25 mm to 30 mm shuttering without staging in foundation | 6 | Sqm | 249.09 | ₹1,494.54 |
| 3 | First class Brick work in cement sand mortar in steining of well, pier, abutment, wing wall, parapets cross drain. H.P. culverts, guard wall etc including cost and carriage of all materials. (i) In 1:4 proportion | 1.62 | Cum | 6,525.25 | ₹10,570.91 |
| 4 | Plaster ( to wall, floor, ceiling etc) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, noising and drip course, scaffolding/ staging where necessary ( Ground floor).(Excluding cost of chipping over concrete surface) (i) With 1:4 cement mortar. (a) 15 mm thick plaster | 18.6 | Sqm | 194.53 | ₹3,618.26 |
| 5 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE: Cement 0.152 cum per 100 Sqm. | 18.6 | Sqm | 39.02 | ₹725.77 |
| 6 | Takingoutoldexistingunservicabledamagedgateshutterofcanal/rivercompletelyafterdisengagingfromhoistingsystemcompletelyforinstallationofnewgateshutter.Theworkincludescuttingofgatesintosuitablepiecesbygascutting,removingthesamebymechanical means or suitable crane, stacking all the pieces at the suitable place or as directed by the Engineer in charge upto a lead of 1000 m. The cost includes cost of man power employed for dismantling andcost of consumables like oxygen, accetylene gas, welding rod, hire charges of machineries, like chain pulley block, gas set, grinding machine, welding set, tools & tackles, scaffolding and safety equipments etc including carriage loading & unloading. The cost of complete dismantling of hoisting system & cost of old unservisable materials handed over to departmental godown including loading& unloading will be provided extra. a) Gate shuteer size upto 4.00 sq.m | 350.58 | Kg | 7.01 | ₹2,457.57 |
| 7 | Fabrication , Supply, erection and commissioning of new Slide type vertical lift regulator service gates of Canal/River as per IS: 5620 - 2000/LatestRevisionconsistingofskinplate,verticaland horizantalgrider,stiffeneretc.madeofMSmaterialconsistingofangle,channel, beam, plate, flat, etc. conforming to IS : 2062 -2011/latest revision manufactured as per approved drawing and direction including cost of Materials, Machinaries , Manpower, Cutting, Aligning, drilling, Welding,Finishing,Consumables,Carriagesandalloverheadswith all leads and lifts complete as per specification (without painting). Width of Gate shuteer size upto 2 metre | 175.51 | Kg | 154.93 | ₹27,191.76 |
| 8 | Supplying, fitting and fixing at site Cast Iron flap shutter for hume pipe sluice with Cast Iron collar and other fittings etc. complete (as per drawing & direction of Engineer-in-charge)including castingthe same, necessary drilling etc with carriage to site complete. The Cost includes cost of Materials, Machinaries , Manpower, Cutting, Aligning,drilling,Welding,Finishing,Consumables,Carriagesand all overheads with all leads and lifts complete as per specification (without painting). | 408.8 | Kg | 169.24 | ₹69,185.31 |
| 9 | Cost for supplying and fifling fixing of Flat rubber seal (Make : Universal Moulders & Engineer/Popular Rubber Works (Pvt) Ltd/ SAB Industries/Unique Polymer Works/equivelant approved make conformingtolS:11855-2011/LatestRevision)fordifferenttypesof gate shutter as per direction of E.I.C. The cost includes cost of man power employed for fitting fixing, cost of rubber seal, hire charges of tools & tackles, scaffolding and safety equipments etc including carriage loading & unloading but excluding supply of ms clamp/flat plate, bolts, nuts and washer. (i) 65mm x 6mm | 8.12 | RM | 1,016.61 | ₹8,254.87 |
| 10 | Supplying, fifling & fixing of C.I wheel in the screw hoisting systemforliftingorloweringthedrawshutter.Thewheelconsisting of suitable size hub to accomodate any size of G.M/C.I nut, rim dia 32mm and four nos arm made of minor dia 30mm. & major dia 36mm rod complete or as per approved drawing & direction of the Engineer-in-charge.The cost includes cost of materials, man power employed for dismantling and fittingfixing,consumableslikecutting tools, welding rod, hire charges of machineries, like lathe machine, grinding machine, tools & tackles etc including carriage loading &unloading. | 22 | Kg | 171.62 | ₹3,775.64 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
Additional.pdf
Additional Documents • 2.05 MB
2911.pdf
Tender Documents • 0.98 MB
BOQ_2498374.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .