| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | ₹4.0 L Quoted ₹4.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.3 L+₹16,747.85 (4.07%)Rejected-AOC 109 A 3 T SELLANDIPALAYAM KARUR 639003 | KARUR | KARUR | TAMIL NADU | 639003 | ₹4.3 L+₹16,747.85 (4.07%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | RJR INFRA STRUCTURES L2 | KR CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Name of the works | |||||
| 1.01 | Clearing the damaged Precast RCC cover slab including all labour charges, lead, lift etc complete. | 15 | M2 | 537.5 ₹8,062.5 | 520.7 ₹7,810.5 Lowest |
| 1.02 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone with steel mould, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. (For precast cover slab.) | 15 | M3 | 15,555 ₹2,33,325 | 15,051.44 ₹2,25,771.6 Lowest |
| 1.03 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire etc complete complying with standard specification. | 610 | Kg | 99 ₹60,390 | 91.35 ₹55,723.5 Lowest |
| 1.04 | Labour charges for transporting from casting yard to curing tank,curing tank to cable duct , aligning and laying of RCC pre cast slab as directed by the site engineer including all labour lead lifts etc complete. | 616 | Nos | 92.5 ₹56,980 | 89.32 ₹55,021.12 Lowest |
| 1.05 | White washing one coat with freshly burnt white shell lime in all floors including cost of lime, blue powder, fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed by the departmental officers. | 171 | M2 | 25 ₹4,275 Lowest | 26.39 ₹4,512.69 |
Tender Value
₹4.1 L
EMD Value
₹4,100
Closing Date
18 Jul 2025, 2:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF SUPERINTENDING ENGINEER, KEDC KARUR
Repair and Maintenance of the Thanthonimalai 110 /11KV Sub station by providing precast RCC cover slab for the cable trenches etc at Thanthonimalai in Karur
2025_EB_578055_1
SPEC 02 /2025-2026 DATE 02.07.2025
Open Tender
Civil Works
Works
60 days
KARUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,100
Yes
17 Oct 2025
4 Jul 2025
19 Jul 2025
4 Jul 2025
18 Jul 2025
4 Jul 2025
Amount
Name of the works
Clearing the damaged Precast RCC cover slab including all labour charges, lead, lift etc complete.
RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone with steel mould, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. (For precast cover slab.)
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire etc complete complying with standard specification.
Labour charges for transporting from casting yard to curing tank,curing tank to cable duct , aligning and laying of RCC pre cast slab as directed by the site engineer including all labour lead lifts etc complete.
White washing one coat with freshly burnt white shell lime in all floors including cost of lime, blue powder, fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed by the departmental officers.
RJR INFRA STRUCTURES (BID ID -1404691)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .