Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC 1205 SUB TREASURY KOLENCHERY | ERNAKULAM | KERALA | 680667 | L1 | Accepted-AOC lowest | |
| 2 | L2₹3.6 L+₹3,339.19 (0.92%)Rejected-AOC 11 | KANNUR | KERALA | 670511 | L2 | Rejected-AOC 2nd lowest |
Tender Value
₹3.4 L
EMD Value
₹8,453
Closing Date
12 Apr 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer
Office of the AEE, Vadavucode Block Panchayathu
Completion of Muthayilchira side protection work in Kunnathunad GP
2023_LSGD_570619_1
46/AE/LSGD/VBP/22-23
Open Tender
Civil Works - Others
Item Rate
180 days
kolenchery
Please refer Tender documents.
8 documents required · 8 mandatory
₹750
₹8,453
Yes
2 Jun 2023
4 Apr 2023
17 Apr 2023
4 Apr 2023
12 Apr 2023
4 Apr 2023
Amount
CHIRA PROTECTION
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD434053/2022-2023:Supplying and fixing in place granite nameboard of slab area less than 0.9sqm including engraving and painting letters etc complete as per direction of Engineer incharge at site OD 79/21-22
BIJU K SLEEBA
Bidder Name
BIJU K SLEEBA
K.V.Mathew
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_842350.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .