Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
22 Oct 2026, 6:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Dy. Executive Engineer, R & B Sub Division, Harij
Maintance and repairs to Roads under the Juridiction of R & B Sub - Division,Harij Dist-Patan.
354677
05 of 2026-27
Open
Civil Works - Roads
Works
Patan
7 documents required · 7 mandatory
₹900
Dy. Executive Engineer, R and B Sub Division, Harij
₹25,000
13 Oct 2026
13 Oct 2026
13 Oct 2026
22 Oct 2026
13 Oct 2026
Name of work :- Maintance and repairs to Roads under the Juridiction of R & B Sub - Division,Harij Dist-Patan.
BILL OF QUANTITY
Sr. No. Description of Item Unit RATE
In figure In words
1 Providing and laying compacted W.B.M. 150 mm thick of machine Cmt 2901.73 Rupees Two Thousand
crushed B.T. metal of size 45 mm to 63 mm with using 20 % stone Nine Hundred One And
screenings as filler grit and stone dust including spreading, watering & Paise Seventy Three
consolidation by vibratory roller etc complete. Only
2 Surface dressing one coat with paving bitumen using 18 kg Bitumen per Smt 228.26 Rupees Two Hundred
10 Sqm. With 0.15 Cmt. Of stone Chipping 12 mm nominal size per 10 Twenty Eight And
Sqm. Of road surface including cost of stone chippings,asphalt,Rolling Paise Twenty Six Only
and consolidation etc complete.
3 Providing and laying 37.50mm thick built up spray grout in one layer Smt 320.17 Rupees Three
bitumen at the rate 2.50 Kg per 10 Sqm. for tack coat at 15 kg/10sqm.For Hundred Twenty And
spreading over aggregate with 0.50 Cum. Of stone chippings per 10 sqm. Paise Seventeen Only
Of road surface for 1st layer and using 0.13 Cum. of key aggregate per
Sqm. including rolling and consolidation etc complete.
4 Providing & laying 25 mm thick bitumen carpet with tack coat at the rate M.T 5363.10 Rupees Five Thousand
of 2.5kg/10 Smt.Using crushed stone gradation and bitumen (Of grade Three Hundred Sixty
VG-30) at the rate of 3.28% by wt. of total mix for binder by hot mix laid Three And Paise Ten
process including heating the asphalt and aggregate by continous drum Only
mix plant machinery transporting the mix and spreading the same with
vibratory roller including necessary fire wood, oil, lubricants, labour
charges and hire charges of requred plant and machinaries etc Complete.
5 Providing & laying 25 mm thick bitumen carpet with tack coat at the rate M.T 5034.85 Rupees Five Thousand
of 2.5kg/10 Smt.Using crushed stone gradation and bitumen (Of grade Thirty Four And Paise
VG-30) at the rate of 3.28% by wt. of total mix for binder by hot mix laid Eighty Five Only
process including heating the asphalt and aggregate by continous drum
mix plant machinery including necessary fire wood, oil, lubricants,
labour charges and hire charges of requred plant and machinaries
loading in Govt. and private dumper.
6 Providing and laying 0.24 Cmt./10 Smt Seal Coat with B.T aggregate as M.T 5976.17 Rupees Five Thousand
per gradation using asphalt of VG-30 grade binder for mixing at the rate Nine Hundred Seventy
of 4.5% (Le.45kg/M.T) by wt. of total mix including heating & mixing in Six And Paise
drum mix plant & transporting mix material & spreding the same with Seventeen Only
paver finisher the sand & Cost of fuel, higher charges,wood kerosene,
labour charges etc by contractors own machinery & plant etc complete.
7 Providing and laying 0.24 Cmt./10 Smt Seal Coat with B.T aggregate as M.T 5647.92 Rupees Five Thousand
per gradation using asphalt of VG-30 grade binder for mixing at the rate Six Hundred Forty
of 4.5% (Le.45 Kg./M.T.) by wt. of total mix including heating & mixing in Seven And Paise
drum mix plant & transporting mix material & spreading including Cost Ninety Two Only
of fuel, higher charges,wood kerosene, labour charges etc by
contractors own machinery & plant, loading in Govt or Private dumper.
Sr. No. Description of Item Unit RATE
In figure In words
8 Providing and laying Spreading and compacting graded stone aggregate Cmt 2861.33 Rupees Two Thousand
to wet mix macadam 100 to 150 mm thick as per MORT&H specification Eight Hundred Sixty
incl. premixing the material with water to O.M.C. in mechanical mix plant. One And Paise Thirty
Carriage of mixed material by tipper to site, laying in uniform layers with Three Only
mechanical grader in sub base, base course on well prepared surface
and compacting with vibratory roller to achieves the desired density.
9 Providing & laying 25 mm. thick compacted SDBC with B.T. Stone chips M.T 6460.97 Rupees Six Thousand
as per MORT&H gradation & specification with bulk asphalt VG-30 for Four Hundred Sixty
mixing at the rate of 50.00 Kg./MT by wt. of total mix i.e.(5.00% by weight And Paise Ninety
of total mix) incl. heating the asphalt & aggregates by contineous Seven Only
batching drum mix plant & spreading the same by paver finisher incl.
rolling & Consolidation with 10-12 tonnes vibratory & paver roller & pro.
all materials, equipments, tools and plants, fire wood, oil, kerosene,
labour charges etc and using contractor's own machinaries drum mix
plant & paver finisher etc complete.
10 Providing and laying asphalt painting on B.T surface with bitumen grade Smt 57.66 Rupees Fifty Seven
VG-30 at the rate of 5.00 kg/10 sqm by mechanical spreyer and spreading And Paise Sixty Six
the stone dust on prepared surface at the rate of 0.03 cum/10 sqm and Only
rolling with smooth wheeled and penumatic roller and brushing
11 Providing & laying 37.50mm thick B.M. with B.T. aggregates as per M.T 5277.25 Rupees Five Thousand
M.O.R.T.&H. specification & asphalt for tack coat at the rate of 2.5 kg./ 10 Two Hundred Seventy
Sqm. with michenical sprayer & bitumin grade VG-30 for mixing at the Seven And Paise
rate of 34 Kg./M.T. i.e.3.40% of total weight of mix including heating the Twenty Five Only
aggregare & asphalt in continuous batching drum mix plant and
spreading the same by paver finisher and consolidation with vibratory
roller including paving all materials equipments, tools & plants, fire
wood, oil, kerosene, labour charges etc complete using contractor's own
machinery drum mix plant & paver finisher etc. complete.
12 Providing & laying 20 mm thick M.S.S. with B.T. aggregate (as per M.T 7094.24 Rupees Seven
M.O.R.T.&H. gradation) & bitumen grade VG-30 for mixing at the rate of Thousand Ninety Four
5.09 % (i.e. 50.90 Kg./M.T.) by wt. Of total mix & tack coat at the rate of 2.5 And Paise Twenty
kg./ 10 Sqm. with michenical sprayer including heating & mixing in drum Four Only
mix plant & transporting mix material & spreading the same &
consolidation with vibratory roller of 8 tone to 12 tone & flushing sand or
stone dust at the rate of 0.03 Cum./10 Sqm. including cost of fuel, hire
charges, wood, kerosene, labour charges etc. & with contractor's own
machinery & plant etc. complete.
13 Providing & laying 20 mm thick M.S.S. with B.T. aggregate (as per M.T 6558.94 Rupees Six Thousand
M.O.R.T.&H. gradation) & bitumen grade VG-30 for mixing at the rate of Five Hundred Fifty
5.09 % (i.e. 50.90 Kg./M.T.) by wt. Of total mix including heating & mixing Eight And Paise Ninety
in drum mix plant & transporting mix material & spreading the same & Four Only
consolidation with vibratory roller of 8 tone to 12 tone & flushing sand or
stone dust at the rate of 0.03 Cum./10 Sqm. including cost of fuel, hire
charges, wood, kerosene, labour charges etc. & with contractor's own
machinery & plant etc. complete.
14 Providing and applying primer coat with bitumen SS1 emulsion using Smt 122.21 Rupees One Hundred
emulsion distributor at the rate of 7.50kg per 10 sqm on prepared Twenty Two And Paise
bitumen surface cleaned with hydraulic broom as per technical Twenty One Only
specification Clause
15 Supplying,Stacking and Spreading of Quarry Spall on road side shoulder Cmt 1761.44 Rupees One Thousand
including filling the measure boxes etc.completed as directed. Seven Hundred Sixty
One And Paise Forty
Sr. No. Description of Item Unit RATE
In figure In words
16 Construction of 150 mm thick compacted granular sub base ( Grade-I , Cmt 2592.67 Rupees Two Thousand
Crushed B T coarse graded materials of 53 mm to 26.5 mm @ 35 %, 26.5 Five Hundred Ninety
mm to 4.75 mm @ 45 %, Below 2.36 mm @ 20 % ) by providing coarse Two And Paise Sixty
graded matrial , mixing in a at site with OMC , spreading uniform layers Seven Only
with motor grader on prepared surface and compacting with vibratory
power roller to achieve desire density , complete clause as per
17 Engaging earth excavator for maintaing side shoulders, Removing fallen Hrs 877.15 Rupees Eight Hundred
trees,obstracting Ganda Baval, or branches of trees on road, maintaining Seventy Seven And
borrow pit,spreading metal,Rubble,quarry spall, cleaning of open area of Paise Fifteen Only
building and other misc. works which can be done by earth excavator
including diesel, drivers,lubricant etc complete as per direction and
instruction of Engineer incharge.
18 Scarifying gravelled macadam or Bitumen macadam surface 6 cm to 10 Smt 43.58 Rupees Forty Three
cm depth including stacking useful materials on road side and disposing And Paise Fifty Eight
off remaining stuff. Only
19 Supplying and fixing reinforced concrete heavy duty non-pressure pipes Rmt 659.99 Rupees Six Hundred
with collars for culverts including setting and joining the pipes in cm. 1:2 Fifty Nine And Paise
watering and laying (To level of slops) of I.S. 498/1971 Class NP 3 of Ninety Nine Only
following internal diameters.
(ii) 450 mm Dia Rmt 1190.05 Rupees One Thousand
One Hundred Ninety
And Paise Five Only
(iii) 600 mm Dia Rmt 1968.38 Rupees One Thousand
Nine Hundred Sixty
Eight And Paise Thirty
(iv) 750 mm Dia Rmt 2605.57 Rupees Two Thousand
Six Hundred Five And
Paise Fifty Seven Only
(v) 900 mm Dia Rmt 3469.26 Rupees Three
Hundred Sixty Nine
And Paise Twenty Six
(vii) 1200 mm Dia Rmt 4679.42 Rupees Four
Thousand Six Hundred
Seventy Nine And
Paise Forty Two Only
20 Providing and laying cement concrete 1:2:4 (1 Cement : 2 coarse sand : 4 Cmt 3575.49 Rupees Three
graded stone aggregrate 20mm nominal size) and curing complete Thousand Five
excluding cost of form work in Hundred Seventy Five
(A) Foundation and plinth And Paise Forty Nine
Sr. No. Description of Item Unit RATE
In figure In words
21 Providing and laying cement concrete 1:4:8 (1 Cement : 4 coarse sand :8 Cmt 2670.08 Rupees Two Thousand
hand broken stone aggregates 40 mm nomial size) and curing complete Six Hundred Seventy
excluding cost of form work in (A) Foundation and plinth And Paise Eight Only
22 Providing TMT bar FE 500D reinforcement for RCC work including Kg 77.29 Rupees Seventy
bedding binding and placing in position complete upto floor two level. Seven And Paise
Twenty Nine Only
23 Brick work using common burnt clay building brick having crushing Cmt 3708.98 Rupees Three
strength not less than 35 kg/sq. cm. in foundation and plinth in cement Thousand Seven
mortar 1:6 (1 Cement : 6 fine sand) Hundred Eight And
(B) Conventional Paise Ninety Eight Only
24 Providing 15 mm thick cement plaster in single coat on fair side Smt 188.98 Rupees One Hundred
Brick/concrete wall for interior plastering upto floor two level finished Eighty Eight And Paise
even and smooth in : Ninety Eight Only
(II) cement mortar 1 : 3 (1 cement : 3 sand)
25 Box cutting the road surface to proper slope and chamber for making a Cmt 114.44 Rupees One Hundred
base for road work including removing the excavated stuff and Fourteen And Paise
depositing on the road side slope as deirected up to 50 m. Forty Four Only
26 Excavation for foundation upto 1.5 m depth including sorting out and Cmt 128.79 Rupees One Hundred
stacking of useful materials and disposing off the excavated stuff Twenty Eight And
upto 50 Meter lead.(A) Loose or soft soil Paise Seventy Nine
27 Filling in plinth with sand under floors including watering ramming, Cmt 429.24 Rupees Four Hundred
consolidating and dressing complete Twenty Nine And
Paise Twenty Four Only
28 Filling available excavated earth (excluding rock) in trenches. Cmt 137.47 Rupees One Hundred
plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth Thirty Seven And
consolidating each disposited layer by ramming and watering. Paise Forty Seven Only
29 Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse sand : Cmt 3909.60 Rupees Three
6- crushed stone aggregates 20 mm nominal size) and curing complete Thousand Nine
including cost of formwork in (A) Wall Caps / Coping Hundred Nine And
Paise Sixty Only
30 Providing and laying controlled cement concrete M.150 for curing Cmt 3775.43 Rupees Three
complete excluding cost of formwork and reinforcement for reinforced Thousand Seven
concrete work in (A) Foundations, footings,Base of columns and Mass Hundred Seventy Five
concrete And Paise Forty Three
31 Providing and laying controlled cement concrete M.250 and curing Cmt 4553.08 Rupees Four
complete including the cost of formwork and reinforcement for Thousand Five
reinforced concrete work in (A) Foundations, footings, Base of columns Hundred Fifty Three
and Mass concrete. And Paise Eight Only
Sr. No. Description of Item Unit RATE
In figure In words
32 Providing and laying weep hole in abutment and return by using A.C No 90.83 Rupees Ninety And
pipes of 100 mm diamiter with laying in proper grade and joining Paise Eighty Three
complete as per deteled specification Only
33 Providing and laying - Fitter Media 600mm thick directed at the back of Smt 1298.38 Rupees One Thousand
abutments, returns and wing walls as per detailed specifications. Two Hundred Ninety
Eight And Paise Thirty
34 Providing and laying spreading and compacted 100 mm thick sub grade Cmt 898.90 Rupees Eight Hundred
layer using sand of approved quality C.B.R. not less than 10% and Ninety Eight And Paise
confirming to technical specification including mixing the material at Ninety Only
OMC at site & spreading in uniform layer and comp
35 Providing and laying 50 mm. thick bitumenous macadam with using M.T 5203.52 Rupees Five Thousand
asphalt 60/70 for tack coat at the rate of 2.50kg./10 sqm. using Two Hundred Three
crushed stone aggregate as per MORT & H gradation and Viscocity And Paise Fifty Two
grade of VG 30 grade for mixing bitumen at the rate of 3.40% by Only
weight of total mix ( ie 34 kg. / MTon of mix ) including heating
&mixing the asphalt and aggregates by in drum mix plant and
transporting the mix and spreading the same by sensor paver
finisher and consolidation with vibratory road roller including
providing and laying uniformly tack coat and using using
contractor's own machinaries drum mix plant & sensor paver finisher etc
36 Providing & laying 30 mm. thick Compacted Asphaltic Concrete with BT M.T 7342.70 Rupees Seven
aggregate as per M.O.R.T.&H.gradation & asphalt grade VG-30 for Thousand Three
mixing at the rate of 55 Kg./M.T. i.e. 5.50% of total weight of total mix & Hundred Forty Two
with tack coat 2.50kg/10Smt including heating the aggregate & asphalt in And Paise Seventy
continuous batching drum mix plant & spreading the same by paver Only
finisher & consolidation with vibratory roller & flushing sand @
Cum/ 100 Smt. including providing all materials wquipments, tools &
plants, fire wood, oil, kerosene, labour charges etc complete using
constractors own machinery drum mix plant & paver finisher etc
37 Supplying,Stacking & Spreading of Crush Metal 25 to 40mm size on Cmt 1848.30 Rupees One Thousand
Road site as directed. Eight Hundred Forty
Eight And Paise Thirty
38 Supplying,Stacking & Spreading of Crush Metal 45 to 63mm size on Cmt 1926.07 Rupees One Thousand
Road site as directed. Nine Hundred Twenty
Six And Paise Seven
39 Supplying,Stacking & Spreading of H.B. Metal 25 to 90mm size on road Cmt 1797.80 Rupees One Thousand
site as directed. Seven Hundred Ninety
Seven And Paise
40 Supplying & Stacking of Ruble on road site as directed. Cmt 1870.52 Rupees One Thousand
Eight Hundred Seventy
And Paise Fifty Two
Sr. No. Description of Item Unit RATE
In figure In words
41 Rolling and watering of soiling including filling in depression which occu Smt 22.75 Rupees Twenty Two
during the process. with power roller 8 tonne to 12 tonne And Paise Seventy
42 Hire charges Hitachi machine incl. fuel, driver on site for all lead etc Hrs 3030.00 Rupees Three
complete as directed. Thousand Thirty Only
43 Hire charges Dumper with hydralice system including loading and Km 40.40 Rupees Forty And
unloading transporting and spreding the materials with necessary Paise Forty Only
labours, drivers, incl. cost of fuel etc complete.
44 Providing and fixing post and pipe railing as per detailed drawing Rmt 1210.98 Rupees One Thousand
including 3 coats of painting to steel works complete Two Hundred Ten And
Paise Ninety Eight Only
45 Providing and laying evenly Tack coat using low viscocity liquid Smt 25.25 Rupees Twenty Five
bituminious VG-30 materials at the rate of 2.5 Kg / 10 Sq.M. on road And Paise Twenty Five
surface using pressure sprayer etc complete including the cost of all Only
labour and materials
46 Providing and supplying of Labour for maintaining road and building No 510.05 Rupees Five Hundred
campus as per requirement. Ten And Paise Five
47 Hire charges Paver Machine necessary labours, drivers, incl. cost of fuel Day 11110.00 Rupees Eleven
etc complete. Thousand One
Hundred Ten Only
48 Earthwork for embankment including breaking clods, dressing with all Cmt 186.39 Rupees One Hundred
lead and lift and including watering rolling and consolidation of Eighty Six And Paise
subgrade in layers at O.M.C. to required dry density including filling the Thirty Nine Only
depression which occur during the process using power roller 8T to
10T.(E) From Borrow area within 3.0KM. lead
Sr. No. Description of Item Unit RATE
In figure In words
49 Providing & laying 50 mm thick compacted D.B.M. with B.T. stone MT 6216.55 Rupees Six Thousand
aggregates as per MoRT&H gradation & specification with asphalt VG-30 Two Hundred Sixteen
for tack coat at the rate of 2.5 kg./ 10 sq.mt. with mechanical sprayer and And Paise Fifty Five
bitumen grade ( VG - 30) for mixing at the rate of 45.0 kg./M.T. by weight Only
of total mix i.e.( 4.5% by weight of total mix ) including heating the
asphalt & agreegates by contineous Drum mix plant & spreading the
same by paver finisher including rolling & consolidation with 10-12 tones
vibratory and power roller & providing all materials,equipments,tools &
plants,fire wood,oil,kerosene,labour charges etc.and using contractors
own machinaries Drum mix plant & paver finisher etc.comp.
50 Providing full depth repair by excavating existing loose damaged Smt 1185.74 Rupees One Thousand
pavement layer in geomatric shape area. Providing & spreding 100 mm One Hundred Eighty
thick sand, 150 mm GSB, 150 mm WBM, and 100 mmm thick WMM etc as Five And Paise
directed. Seventy Four Only
51 Hire charges for Vibratory Roller 8 - 10 Tonnes @ 100 Cum per Hour Hrs 850.79 Rupees Eight Hundred
Fifty And Paise
Seventy Nine Only
52 Charges for clearing road site by removing of Ganda Bavals, Akadas, Km 14133.94 Rupees Fourteen
Bordies etc upto 4 mt. on both side from edge of B.T. surface including Thousand One
de-rooting by JCB machine & throwing away all stuff, branches etc with Hundred Thirty Three
all lead & lift with all materials, labour etc complete as directed. And Paise Ninety Four
53 Engaging tractor with trolly or front pavada as regd. Incluidng loading 1 Hrs 209.71 Rupees Two Hundred
and unloading transporting & spreding the materials up to 15 km lead Nine And Paise
with necessary laboursdrivers, including cost of fuel etc complete as Seventy One Only
54 Hire charges water tanker of 3000 capacity Portable water through Per 505.00 Rupees Five Hundred
including Fuel, and driver with filling water from site shown and empting Trip Five Only
the water on site with all lead as directed.
55 Providing and Supplying at any site of our juridiction of 50 Kg empty No 101.00 Rupees One Hundred
Cement bag with filling Sand and binding as per directiction and One Only
instruction of engineer incharge.
Sr. No. Description of Item Unit RATE
In figure In words
56 Providing photo graphy of any type of work at any site of taluka including No 50.50 Rupees Fifty And
Soft copy & Hard Photo Copy . as per directed by incharge Engineer. Paise Fifty Only
57 Providing Soft Copy Video graphy of Road Site work at any site of Km 1010.00 Rupees One Thousand
taluka as per directed by incharge Engineer. Ten Only
58 Cleaning & Leveling of both side side shoulders up to 1.00 to 1.50 mt Km 44804.17 Rupees Forty Four
width from carrageway end by mechanical means or manual means and Thousand Eight
also making cleaning the water trench parallel to the road etc including Hundred Four And
repairing of both side side shoulders up to 1.00 mtr, filling of rain cut etc Paise Seventeen Only
Complete as per direction and instruction of Engineer in charge.
59 Providing and Laying 200 mm thick ( 100 mm + 100 mm) Granular Sub Cmt 832.76 Rupees Eight Hundred
base course in single layers as per gradation made of natural Thirty Two And Paise
unscreened gravel & sand in proper propertion as directed including Seventy Six Only
spreading, watering & rolling with vibrator roller as directed.
60 Providing Milling with Cold Milling machine of existing Bituminous Sqm 84.84 Rupees Eighty Four
surface up to any depth as per instruction of Engineer In charge and And Paise Eighty Four
Stock usable material with machinery to near by place as per direction of Only
engineer in charge where as disposing or reuse material from the site up
to any lead as per instruction of engineer in charge
s!f C]\ q VDM V\NFH5+SGL NZ[S VF.8DGL ;FD[ NXF"J[, EFJYL _________________@ p\RF q GLRF
s XaNMDF\_____________________________________@ p\RF q GLRFf EFJ[ SFD SZL VF5JF ;C\DT KLV[P
sZf p5ZMST XZT G\AZ s!f D]HA DFZF q VDFZF TZOYL EZJFDF\ VFJ[, 8SFJFZL 5|DF6[GF pRF q GLRF EFJ p5ZMST AWLH VF.8DGF EFJMG[ ,FU] 50X[ VG[ V[ D]HAGF
EFJ D]HA H~ZLIFT D]HAGL SFDULZL SZL VF5JF ;C\DT KLV[P
s#f p5ZMST EFJMGL ;ZBFD6L5+S D]HA ;F{YL GLRF EZ[, EFJMGL V[SH VHg;L GSSL SZJFDF\ VFJX[ VG[ T[ D]HA ;1FD S1FFV[YL V[S V[Hg;LG\] EFJ 5+S D\H]Z SZJFDF\
s$f p5ZMST EFJ5+SDF\ HyYM NXF"JJFDF\ VFJ[, GYLP H[YL H~ZLIFT D]HAGF ;A\lWT VF.8DGF HyYFGF SFDJFZ V,U V\NFH5+SM T{IFZ SZL ;1FD S1FFV[YL D\H]Z SZFJL
SFDULZL CFY WZJFDF\ VFJX[P
s5f XZTL EFJM l:JSFZJFDF\ VFJX[ GCLP
s&f EFJM VFBF JQF"GF WMZ6[ VF5JFGF ZC[X[ T[DH H~ZLIFT D]HA EFJMGL D]NT JWFZJFGL H~ZLIFT H6FI tIFZ[ ;C\DTLYL EFJMGL D]NT ;1FD S1FFV[YL JWFZJFGL NZBF:T
s*f .gRFH" .HG[ZzLGL ;]RGF D]HA H~ZLIFT D]HAG]\ SFD TFSLNGF WMZ6[ SZJFG]\ ZC[X[P
s(f S]NZTL VFOTM q JFJFhM0] q JZ;FN T[DH DCFG]EFJMGF VFSl:DS SFI"S|DG[ V\TU"T p5ZMST D\H]Z YI[, EFJM 5|DF6[GL SFDULZL TFSLNGF WMZ6[ CFY WZJFGL ZC[X[ VG[
:Y/ l:YlT VG[ ;DIVG];FZ TFSLNGL SFDULZL SZJF D\H]Z YI[, .HFZNFZzLGF EFJ D]HA VgI .HFZNFZzL 5F;[YL 56 SFDULZL SZFJJFDF\ VFJX[P
s)f ;NZ EFJ5+SDF\ NXF"J[, EFJ HLPV[;P8L JUZGF CMJFYL H[YL lA,GF R]SJ6F JBT[ !( @ HLPV[;P8LP V,UYL R]SJJFDF\ VFJX[P
s!_f ;NZ SFDULZL VFSl:DS 5|SFZGL CM. TYF VFSl:DS ;\HMUMDF\ SZJFGL YTL CMJFYL ;NZ SFD 5F86 HL<,FDF\ 0FDZGF %,Fg8 WZFJGFZ .HFZNFZzLVM V[H EZJFGF
ZC[X[PT[ l;JFIGF .HFZNFZzLVM NJFZF EZJFDF\ VFJ[, 8[g0Z ZN U6JFDF\ VFJX[P
Signature of Contractor
Deputy Executive Engineer
R & B Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.SCHEDULE - B.pdf
2.SPECIFICATION.pdf
3.DETAILS OF SPECIFICATION.pdf
4.CONDITION.pdf
ROAD WORKS SPECIFICATIONS.pdf
BRIDGE WORKS SPECIFICATIONS1.pdf
BuildingSpecificationBooklet1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .