| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC GHUMARWIN DIVISION HP PWD GHUMARWIN | ₹4.2 L Quoted ₹4.7 L | L1 | Accepted-AOC Due Lowest Rate |
| 2 | L2₹4.9 L+₹22,473 (4.77%)Rejected-Finance | ₹4.9 L+₹22,473 (4.77%) | L2 | Rejected-Finance Due to Highest Rate |
| 3 | L3₹5.1 L+₹39,545 (8.39%)Rejected-Finance | ₹5.1 L+₹39,545 (8.39%) | L3 | Rejected-Finance Due to Highest Rate |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Contractor has submited the application in the office of the under signed on dt. 20.07.2026 he wants to his tender bid not open. |
| Sl No | Description | Qty | Unit | sachin kumar L1 | Ashwani L2 | Vivek Dogra L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations, trenches etc., in earth work, lift upto 1.50 Metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres complete as per the direction of Engineer-in-Charge with in all leads and lifts. | 109 | Cum | 425 ₹46,325 Lowest | 450 ₹49,050 | 475 ₹51,775 |
| 2.00 | Providing and laying Cement concrete 1:6:12 (1 Cement:6 Sand:12 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect including all leads and lifts. | 6.6 | Cum | 5,700 ₹37,620 Lowest | 6,000 ₹39,600 | 6,100 ₹40,260 |
| 3.00 | Providing and laying cement concrete 1:3:6 (1:cement :3 sand:6 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in:-Foundation and plinth i/c carriage of material within all leads and lifts. Complete in all respect as per the dircetion and satisfaction of the Engineer-in-Charge. | 36.78 | Cum | 7,100 ₹2,61,138 Lowest | 7,500 ₹2,75,850 | 7,500 ₹2,75,850 |
| 4.00 | Boulder filling tightly hand packed in foot path complete in all respect within all leads and lifts. | 25.2 | Cum | 1,600 ₹40,320 Lowest | 1,700 ₹42,840 | 1,750 ₹44,100 |
| 5.00 | Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor two ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete in: Vertical surface such as wall (any thickness) partition and the like i/c attached pillasters, butresses plinth and string course including all leads and lifts. | 107.22 | Sqm | 345 ₹36,991 Lowest | 350 ₹37,527 | 375 ₹40,208 |
| 6.00 | Providing Steel work welded in built up sections trusses and framed work including cutting hoisting fixing in position and applying a priming coat of red lead paint in gratings, framed, Guard bars,ladders, railing and (similar work) complete in all respect including all leads and lifts as per the direction and and to the entire satisfection of Engineer-In-Charge. | 389.84 | Kgs. | 125 ₹48,730 Lowest | 125 ₹48,730 Lowest | 150 ₹58,476 |
Tender Value
₹4.7 L
EMD Value
₹9,375
Closing Date
20 Jul 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Kangra
C/O Drain and Path in Hud Kuhl, Pump House).
2026_HPIPH_138712_1
EE/JSDK/NIT/2026- 3469-3519 Dt.10-07-2026
Open Tender
Civil Works
Item Rate
90 days
Kangra
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
₹9,375
20 Aug 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
10 Jul 2026 - 20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundations, trenches etc., in earth work, lift upto 1.50 Metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres complete as per the direction of Engineer-in-Charge with in all leads and lifts. | 109 | Cum | - | - |
| 2 | Providing and laying Cement concrete 1:6:12 (1 Cement:6 Sand:12 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect including all leads and lifts. | 6.6 | Cum | - | - |
| 3 | Providing and laying cement concrete 1:3:6 (1:cement :3 sand:6 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in:-Foundation and plinth i/c carriage of material within all leads and lifts. Complete in all respect as per the dircetion and satisfaction of the Engineer-in-Charge. | 36.78 | Cum | - | - |
| 4 | Boulder filling tightly hand packed in foot path complete in all respect within all leads and lifts. | 25.2 | Cum | - | - |
| 5 | Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor two ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete in: Vertical surface such as wall (any thickness) partition and the like i/c attached pillasters, butresses plinth and string course including all leads and lifts. | 107.22 | Sqm | - | - |
| 6 | Providing Steel work welded in built up sections trusses and framed work including cutting hoisting fixing in position and applying a priming coat of red lead paint in gratings, framed, Guard bars,ladders, railing and (similar work) complete in all respect including all leads and lifts as per the direction and and to the entire satisfection of Engineer-In-Charge. | 389.84 | Kgs. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
Termsandcondtions.pdf
Tender Documents • 0.21 MB
Form6and8.pdf
Tender Documents • 0.71 MB
BOQ_205465.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .