| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | L1 | Accepted-AOC lowest rate | |
| 2 | Rejected-Technical | - | Rejected-Technical higher rate | |
| 3 | Rejected-Technical | - | Rejected-Technical higher rate |
| Sl No | Description | Qty | Unit | HASHIM IBRAHIM L3 | N K LATHEEF L2 | TOJI MATHEW L1 |
|---|---|---|---|---|---|---|
| 1.00CONCRETE | ||||||
| 1.00 | OD410085/2024-2025:OD311446/2023-2024
Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 6.67 | cum | 1,082.66 ₹7,223.51 | 1,035.58 ₹6,909.39 | 1,007.34 ₹6,720.97 Lowest |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 10.01 | cum | 9,970.63 ₹99,786.07 | 9,537.12 ₹95,447.5 | 9,277.02 ₹92,844.42 Lowest |
| 1.00 | OD410233/2024-2025:Providing and fixing of good quality granite name board with lettering including of all cost,conveyance,labour charges etc complete. | 1 | no | 3,194.64 ₹3,194.64 | 3,055.75 ₹3,055.75 | 2,972.41 ₹2,972.41 Lowest |
| 2.00rock cutting | ||||||
| 2.00 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 18 | cum | 633.24 ₹11,398.32 | 605.7 ₹10,902.6 | 589.18 ₹10,605.24 Lowest |
| 2.00 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 36 | cum | 631.2 ₹22,723.2 | 603.76 ₹21,735.36 | 587.29 ₹21,142.44 Lowest |
| 2.00 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 799 | kg | 185.07 ₹1,47,870.93 | 177.02 ₹1,41,438.98 | 172.2 ₹1,37,587.8 Lowest |
Tender Value
₹2.5 L
EMD Value
₹6,352
Closing Date
28 Mar 2025, 10:00 amClosed
HRISHIKESH H K
LID AND EW SECTION, PERUVANTHANAM GP
Annual Plan-PROJ NO.382/24-25 ROAD CONSTRUCTION TOWARDS DIFFERENTIALLY ABLED CHILD AS PER OP RPWDNO3282S2021 (RETENDER)
2025_LSGD_753430_9
07/24-25/AE/LID_EW/PVM/ET7
Open Tender
Civil Works - Roads
Item Rate
PERUVANTHANAM
Please refer Tender documents.
8 documents required · 8 mandatory
₹560
Yes
₹6,352
Yes
26 Aug 2025
21 Mar 2025
29 Mar 2025
21 Mar 2025
28 Mar 2025
21 Mar 2025
Amount
CONCRETE
OD410085/2024-2025:OD311446/2023-2024 Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
OD410233/2024-2025:Providing and fixing of good quality granite name board with lettering including of all cost,conveyance,labour charges etc complete.
rock cutting
2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
N K LATHEEF (BID ID -2179649)
HASHIM IBRAHIM (BID ID -2179730)
Bidder Name
N K LATHEEF
HASHIM IBRAHIM
TOJI MATHEW
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .