Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC E 06 127 236 GHOSHPARA WAR NO 4 P O P S KALYANI NADIA PIN 741235 | KALYANI | NADIA | WEST BENGAL | 741235 | ₹5.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.0 L+₹997.90 (0.20%)Rejected-Finance VILL BASTIYA P O P S EGRA DIST PURBA MEDINIPUR PIN 721429 | EGRA | PURBA MEDINIPUR | WEST BENGAL | 721429 | ₹5.0 L+₹997.90 (0.20%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.0 L+₹1,796.22 (0.36%)Rejected-Finance | ₹5.0 L+₹1,796.22 (0.36%) | L3 | Rejected-Finance L3 |
Tender Value
₹5.0 L
EMD Value
₹9,979
Closing Date
7 Mar 2026, 4:00 pmClosed
Chairman Kalyani Municipality
Office of the Chairman, Kalyani Municipality
Construction of Dressing Room at Housing Play Ground , Colour Coated shade with M.S Hollow Section, Brick work, Near Housing Market, in ward no-14, Under Kalyani Municipality.
2026_MAD_1013758_78
WBMAD/ULB/KM/NIT-17(e) /Dev/2025-2026
Open Tender
CIVIL WORKS
Percentage
90 days
Kalyani Municipality
Please Refer Tender Document
8 documents required · 8 mandatory
₹0
₹9,979
15 Sept 2026
2 Mar 2026
10 Mar 2026
2 Mar 2026
7 Mar 2026
2 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches ordrains, in all sorts of soil (including mixed soil butexcluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.asdirected. The item includes necessary trimming thesides of trenches, levelling, dressing and ramming thebottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm.
Ref. Page- 1, Item -2, PWD SOR Vol-I w. e. f. 1.11.2017 | 12.52 | %Cum | 11,927 | ₹1,49,326.04 |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.including watering and ing etc. layer by layercomplete. (Payment to be made on the basisent of finished quantity of work)(b) With eart ained by freshxcavation (includingcost of excavation upto 1,800 mm. depth) fromarranged by the Deptt. within a lead of 100 m.
Ref. Page- 16, Item -16, PWD SOR Vol-I w. e. f. 1.11.2017 | 34.4 | %Cum | 7,754 | ₹2,66,737.6 |
| 3 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
Ref. Page- 47, Item -3, PWD SOR Vol-I w. e. f. 1.11.2017 | 92.81 | Sqm | 24 | ₹2,227.44 |
| 4 | Cement concrete with graded jhama khoa (30 mmsize) excluding Shutering In ground floor and foundation.
(a) 1:3:6 proportion
Ref. Page- 23, Item -1, a) PWD SOR Vol-I w. e. f. 1.11.2017 | 6.97 | Cum | 4,630.25 | ₹32,272.84 |
| 5 | Brick work with 1st class bricks in cement mortar (1:6)
(a) In foundation and plinth
Ref. Page- 15, Item -8, PWD SOR Vol-I w. e. f. 1.11.2017 | 14.57 | Cum | 5,368.05 | ₹78,212.49 |
| 6 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in
ground floor.
Ref. Page- 16, Item -16, PWD SOR Vol-I w. e. f. 1.11.2017 | 65.71 | Sqm | 728.53 | ₹47,871.71 |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, pla -cing in proper position and binding with 16 gauge black anne -aled wire at every intersect- ion, complete as per drawing and direction.
Ref. Page-43, Item -40, PWD SOR Vol-I w. e. f. 1.11.2017 | 0.15 | MT | 54,915 | ₹8,308.64 |
| 8 | M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per esign, drawing direction ofEngineer-in-Charge complete uding cutting torequisite shape & ze,fabrication including etalforming to IS: 816-1969 & IS: 9595 using electrodes of approvedmake and brand conforming to IS:814- 2004, haulage, hoisting anderection allcomplete.The rate includes the cost of all M.S. Hollow ection, allconsumables such as electrodes, gas and hire charges of all toolsand plants and labour reqired for execution and all identalhages (such as electricity, labour insurance) etc. complete.
Ref. Page- 101, Item -2A,i) PWD SOR Vol-I w. e. f. 1.11.2017 | 0.92 | MT | 58,832 | ₹54,372.53 |
| 9 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
a) Pakur Variety
Ref. Page- 16, Item -16, PWD SOR Vol-I w. e. f. 1.11.2017 | 1.67 | Cum | 5,952.42 | ₹9,940.54 |
| 10 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or strai -ght including fitting, fixing and striking out after comp -letion of works (upto roof of ground floor)
Ref. Page-42, Item -36, PWD SOR Vol-I w. e. f. 1.11.2017 | 13.35 | Sqm | 209 | ₹2,790.15 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 6.17 MB
BOQ_2496265.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .