Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | UNNI S L1 |
|---|---|---|---|---|
| 1.00Routine maintenance of Bridges | ||||
| 1.00 | 2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Manual Means<br> | 0.41 | Hectare | 1,53,860.24 ₹63,082.7 Lowest |
| 1.00 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 0.61 | Hectare | 51,132.17 ₹31,446.28 Lowest |
| 1.00 | OD60/2025-2026:Hire charges for wood cutting equipments, pulleys etc | 10 | Day | 1,270.5 ₹12,705 Lowest |
| 1.00 | OD61/2025-2026:Engaging wood cutters of trees and removal of fell down trees and branches etc complete | 30 | Day | 1,082.87 ₹32,486.1 Lowest |
| 1.00 | OD62/2025-2026:Engaging excavator for vent way clearance | 2 | Day | 12,285.48 ₹24,570.96 Lowest |
| 1.01 | OD63/2025-2026:Engaging man mazdoor for clearing the deposit of silt over bridge, cutting of trees and vent way clearance etc. | 85 | Day | 979.32 ₹83,242.2 Lowest |
| 1.01 | OD65/2025-2026:Filling up potholes with bituminous ready mix compound(25kg bag) including of cost of
material and transportation to site etc | 60 | each | 800.05 ₹48,003 Lowest |
| 1.01 | OD59/2025-2026:Providing platform over pipes of size 15mm to 20mm . Dia erected and platform made up of Posts of average 2m long and the platform consist 25mm, thick planks placed to 125 mm and 75 mm irul wood joists placed tied at 60 cm intervals including all hire and labour charge for fixing and laying the platform, cost of nails , coir etc. including removal of entire platform after completion of the work. | 9 | sqm | 1,094.1 ₹9,846.9 Lowest |
| 1.01 | OD64/2025-2026:Tipper for removal of all debris, branches and waste materials away from site | 2 | Day | 2,983.61 ₹5,967.22 Lowest |
Tender Value
₹3.0 L
EMD Value
₹7,413
Closing Date
19 Jul 2025, 5:30 pmClosed
Assistant Executive Engineer PWD Bridges Sub Div
Assistant Executive engineer PWD Bridges Sub division Kollam
GENERAL-Pre Monsoon Work 2025-Pre Monsoon Work for Various Bridges under Bridges Section Kottarakkara-General Civil Work
2025_PWD_766090_3
PWD/BR/TR/6793/2025_5_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
Kollam
Please refer Tender documents.
10 documents required · 10 mandatory
₹655
Yes
₹7,413
11 Sept 2025
14 Jul 2025
21 Jul 2025
14 Jul 2025
19 Jul 2025
14 Jul 2025
Amount
Routine maintenance of Bridges
2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Manual Means<br>
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
OD60/2025-2026:Hire charges for wood cutting equipments, pulleys etc
OD61/2025-2026:Engaging wood cutters of trees and removal of fell down trees and branches etc complete
OD62/2025-2026:Engaging excavator for vent way clearance
OD63/2025-2026:Engaging man mazdoor for clearing the deposit of silt over bridge, cutting of trees and vent way clearance etc.
OD65/2025-2026:Filling up potholes with bituminous ready mix compound(25kg bag) including of cost of material and transportation to site etc
OD59/2025-2026:Providing platform over pipes of size 15mm to 20mm . Dia erected and platform made up of Posts of average 2m long and the platform consist 25mm, thick planks placed to 125 mm and 75 mm irul wood joists placed tied at 60 cm intervals including all hire and labour charge for fixing and laying the platform, cost of nails , coir etc. including removal of entire platform after completion of the work.
OD64/2025-2026:Tipper for removal of all debris, branches and waste materials away from site
Bidder Name
UNNI S
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1269913.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .