Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance UNIT NO 2702 27TH FLOOR RUPA RENAISSANCE PLOT D 33 D 207 JUINAGAR MIDC TTC INDUSTRIAL AREA TURBHE NAVI MUMBAI THANE MAHARASHTRA 400705 | THANE | MAHARASHTRA | 400705 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
8 Sept 2020, 2:30 pmClosed
KK Agarwal
NHIDCL 3RD FLOOR, PRESS TRUST OF INDIA BUILDING, 4, PARLIAMENT STREET, NEW DELHI
Consultancy Services for Preparation of Detailed Project Report for construction to 2-Lane Tura Bypass between existing km 95.00 to km 101.00 of NH-51 on EPC mode in the State of Meghalaya
2020_NHIDC_574799_1
NHIDCL/Meghalaya/Tura Bypass/NH-51/2020
Open Tender
Consultancy
Item Rate
365 days
Meghalaya
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
MD NHIDCL
Exempted
NHIDCL HQ New Delhi
19 Oct 2020
4 Aug 2020
11 Sept 2020
4 Aug 2020
8 Sept 2020
25 Aug 2020
5 Aug 2020 - 17 Aug 2020
20 Aug 2020
Amount
Remuneration for Local Staff (inclusive of per diem allowance)
Team Leader cum Sr. Highway Engineer
Highway cum Pavement Engineer
Senior Bridge Engineer
Traffic and Safety Expert
Material cum GeoTechnical Engineer cum Geologist
Senior Survey Engineer
Environment Specialist
Quantity Surveyor/Documentation Expert
Land Acquisition Expert
Utility Expert
Sub Professional Staff (To be assessed by consultant as per requirement of assignment)
Position
Position
Position
Support Staff (inclusive of per diem allowance)
Office Manager
Typist
Office Boy
Transportation (Fixed Costs)
The vehicles hired by the Consultant shall include the cost For rental, drivers, operation, maintenance, repairs, insurance, etc.
Duty Travel to Site (Fixed Costs)
Trips
Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairs, etc.
Office Rent
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Office Furniture and Equipment (Rental)
Office Furniture and Equipment
Reports and Document Printing
Monthly Report (3 copies per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report& RAP
Final Environmental Assessment report& RAP
Draft Detailed Design Report & Drawings etc. Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D)& 3G notification for land acquisition (3 copies each)
LA & Clearances II Report
Survey and Investigation A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment (GPS, Total Station, Auto Level etc.) and supply of survey Teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile/ aerial LiDAR or equivalent technology
Sub-surface utilities detection using Ground Penetrating Radar, Induction Locator or better technologies
Survey/Investigation using Network Survey Vehicle as per TOR
Investigation (Fixed cost)(lumpsum)
Road and Bridge Inventory
BBD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Any other investigations/surveys
Sub-Soil Investigation (Boring) (Rate/m)
a) In soil other than hard rock
b) In hard rock
Fixing Boundary pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval
Other Miscellaneous expenses (Like DA, internal travel expenses other incidentals)(Fixed Cost)
Holtec Consulting Private Limited
STUP Consultants Pvt. Ltd.
Theme Engineering Services Pvt Ltd
Casta Engineers Pvt Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .