Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.3 LAccepted-AOC D NO 9 947 66 DOCTORS COLONY SHIVAJI PLEM VISAKHAPATNAM 530017 | VISAKHAPATANAM | ANDHRA PRADESH | 530017 | ₹27.3 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹31.1 L+₹3.9 L (14.2%)Rejected-Finance DOOR NO 15 1 141 BHAVANA ENCLAVE 1 NEAR HOTEL GRAND BAY MAHARANIPETA NOWAROJI ROAD VISAKHAPATNAM 530002 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530002 | ₹31.1 L+₹3.9 L (14.2%) | L2 | Rejected-Finance Being not L1 |
| 3 | L3₹37.5 L+₹10.2 L (37.4%)Rejected-Finance DOOR NO 14 6 21 5 OPP MARVAL SCHOOL BC ROAD NEW GAJUWAKA VISAKHAPATNAM 530026 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530026 | ₹37.5 L+₹10.2 L (37.4%) | L3 | Rejected-Finance Being not L1 |
| 4 | L4₹43.1 L+₹15.8 L (57.9%)Rejected-Finance D NO 65 6 500 2 MULAGADA COLONY HIMACHALNAGAR GAJUWAKA VISAKHAPATNAM 530 026 | VISAKHAPATANAM | ANDHRA PRADESH | 530026 | ₹43.1 L+₹15.8 L (57.9%) | L4 | Rejected-Finance Being not L1 |
| 5 | L5₹43.3 L+₹16.1 L (58.9%)Rejected-Finance | ₹43.3 L+₹16.1 L (58.9%) | L5 | Rejected-Finance Being not L1 |
Tender Value
₹40.1 L
EMD Value
₹80,300
Closing Date
13 Apr 2023, 6:00 pmClosed
GE (I) DM Visakhapatnam
GE (I) DM Visakhapatnam
MAINTENANCE AND REPLACEMENT OF UNSERVICEABLE SPARES OF UPTO 30TR CENTRAL AC PLANTS INCLUDING CERTAIN MISC WORKS AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE (I) (DM) VISAKHAPATNAM
2023_MES_586058_1
SSGE/8812/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Naval Dockyard Visakhapatnam
As per tender documents
9 documents required · 9 mandatory
₹500
GE (I) DM Visakhapatnam
₹80,300
Yes
13 Jun 2023
16 Mar 2023
20 Apr 2023
16 Mar 2023
13 Apr 2023
30 Mar 2023
Amount
Repairs, overhauling and servicing of following AC Plant compressor by stripping out both end covers, cylinder head, cylinders, connecting rod, crank shaft, oil pump, side covers, bush bearings etc.,and refrigerant taking the cylinder for reuse (if available) of unserviceable worn out parts in the compressor, cleaning the system with CO2/Nitrogen gas for leak detection for minimum 24 Hrs, after flushing out the system, vacuumization and charging with refrigerant gas & compressor oil and testing the unit on no load and full load conditions all as specified and directed. Note:- Supply only refrigerant gas, compressor oil and spare parts for the compressors will be measured and paid under relevant items of Schedule ’A’.
SMC 6-65 of Make ‘Accel’ 20TR
5F-20 of Make ‘Carrier’ 15TR
Supply only following spare parts suitable for SMC 6-65 of 'ACCEL' make
Bushing with collar standard
Shaft seal assembly
Bearing bushing
Gear wheel
Single frame (unload -65)
Rocker for unload mechanism
Bearing cup
Spring holder
Spring
Cup washer
Crank shaft
Half section of bearing standard
Bush for piston pin
Castie nut
Split pin
Piston with pin & rings
Cylinder liner
Unloading ring with pin
Tension spiral
Suction valve ring plate
Valve spring
Suction valve retaining plate
Discharge valve seat
Discharge valve ring plate
Oil pressure regulating valve
Safety valve assembly
Set of gasket
Set of neoprene “O” Ring
Set of dowty rings
Set of sealing rings
Supply only following spare parts suitable for 5F-20 of Make ‘Carrier’ 15TR
Crank shaft
Connecting rod
Piston
Piston pin
Piston lock
Suction reed
Discharge reed
Suction valve springs
Discharge valve springs
Discharge valve assembly
Valve plate
Spring lifter pin
Gasket set
Collecing rod bearings
Oil pump assembly with bush
Shaft seal assebly
Pump end bearing
Seal end bearing
Thrust washer
Cylinder liner
Piston ring and oil ring
Supply only R-22 gas. Make:-Refron 22/Floron 22/Mafron 22
Supply only compressor oil. Make:-Servo/N-68 of HPCL
Material and labour for descaling of 10 TR to 25 TR condensers by using HCL acid with continuous circulation method using circulation pump, finally neutralizing with fresh water, opening both end covers of shell and tube condensers, cleaning of copper tubes manually by using nylon brushes, re-fixing the end covers with new neoprene rubber gaskets, commissioning after complete performance test of the system all as specified and directed.
Material and labour for checking the complete refrigeration system of the AC plant of capacity 10 - 30 TR, leak testing with CO2 gas under constant pressure of 250 PSI after complete transfer of refrigerant gas from the entire system, rectification of leakages including cutting and brazing the refrigeration pipes wherever required, replacement of "O" rings, teflon washers of valves, copper tubing, flare nuts etc., neutralizing after the pressure hold good for at least 24 hours vacuumization of system, testing and commissioning of air conditioning plants: Note : Refrigerant gas shall be measured and paid separately
Material labour for taking out defective shaft seal assembly, supply and fix new shaft seal assembly suitable for the following capacities of compressors all as specified and directed:
SMC 6-65 ‘Accel’ make compressor
610-18-00 SMC 4-65 ‘Accel’ make compressor
Material and labour for preparation of surfaces by scrapping and removing rusted portion with wire brush and applying one coat of synthetic enamel paint for complete refrigeration system, in-let/out-let pipe lines, compressor unit, condenser pump set, control LT panel board duct covers, cooling tower stand including lettering & numbering and applying one coat of white/colour wash to chiller pipe line all as specified and directed
Material and labour for complete checking, servicing/ rectification of electrical circuits for all units and control wiring showing phase sequence with proper lugging of AC plant control panel including replacement of fused indication lamps with new ones, cleaning of all power contacts, rectification of minor defects in Ammeters and Voltmeters, testing and commissioning all as specified and directed. Note :- Material such as indication lamp, ammeter, voltmeter shall be measured and paid separately.
Material and labour for replacement of suction reeds, discharge reeds, piston rings, oil rings and replacement of gaskets complete all as specified and directed by Engr-in-Charge. Note : - Refrigerant gas charging/ Pressure testing shall be measured and paid separately under relevant items of Schedule ’A’.
Supply and fix pressure gauge for suction/discharge refrigerant lines and water lines of square/round type 2"/4" dial for the following ranges for Package/Central type AC plants including taking down old unserviceable pressure gauge complete all as specified directed Make -Air Master/Febig/Scientific
0-150 PSI for refrigerant line
0-300 PSI for refrigerant line
0-12 Kg./cm2 for water line
Material and labour for taking out the following defective pressure cut-outs of any range and model and supply & fix new pressure cut-outs, connecting the pressure lines / control wiring, leak testing and commissioning all as specified and directed Make:-Indofoss/Danfoss/Ranco
HP/LP pressure cut-out MP-15
Oil pressure cut-out MP-55
S&F for VVE-70 model expansion valve of Sporlon make with necessary modification, brazing, lead testing and commissioning including taking out old unsv expansion valve complete all as specified and directed.
All as per item No. 14.00 above but for VVE- 52
All as per item No. 14.00 above but for VVE- 16
All as per item No. 14.00 above but for VVE- 20
Material and labour for monthly cleaning of entire indoor substation buildings inside wall, ceiling, floor and outside wall, plinth protection with suitable brush/broom/wiper, removing wild vegitation around substation building complete all as specified and directed.
Supply only indication lamps (LED type) red, yellow and blue in colours of 22.5 mm dia to monitor on LT panel board suitable for 240 V AC supply and taking down unserviceable indication lamps all as specified and directed. Make:- Siemens/C&S/schneider/ABB
Taking down existing corroded/ unserviceable portion of MS flat/angle iron supports/ channels of various sizes fitted in electrical panels in AC plants and supply & fix MS flat/ angle iron including necessary bolting/ welding etc., all as as specified and directed.
Supply and fix suction, discharge valves seatings, copper lines, angle valves of suitable sizes required for suction, discharge, oil pressure and cutouts suitable for 10 TR to 25 TR complete including necessary removal, recharging of refrigerant gas and nitrogen testing all as specified and directed.
Supply and fix in repairs pilot solenoid valve to the refrigerant system, reconnecting the refrigeration piping including leak testing, brazing/flaring to the pipe line whererever required all as specified and directed. Make :- Sporlon/Donfos
Supply and fix in repairs loading solenoid valve to the refrigerant system, reconnecting the refrigeration piping including leak testing, brazing/flaring to the pipe line whererever required all as specified and directed. Make :- Sporlon/Donfos
Supply & fix HMI display board with micro processor controller touch pad for 26 TR ductable AC plant (Model No : - 30RBS80S Make - Carrier) including taking out old unserviceable one complete all as specified and directed.
Supply & fix NRCP board for 26 TR ductable AC plant (Model No. CEBD 430335 - 16 - RB, Make : - Carrier) including taking out old unserviceable one complete all as specified and directed.
Supply & fix EXV board suitable for 26 TR ductable AC plant (Make - Carrier ) including taking out old unserviceable one complete all as specified and directed.
Supply & fix suction gas temperature tranduger (LP) for 26 TR ductable AC plant (Make - Carrier) including taking down unserviceable complete all as specified and directed.
Supply & fix discharge gas temperature tranduger (HP) for 26 TR ductable AC plant (Make - Carrier) including taking down unserviceable complete all as specified and directed.
Supply & fix entering/leaving water temperature sensor for 26 TR ductable AC plant (Make - Carrier) including taking down unserviceable one complete all as specified and directed.
Supply & fix outside temperature sensor for 26 TR ductable AC plant (Make - Carrier) including taking down unserviceable one complete all as specified and directed.
Supply & fix HP switch for 26 TR ductable AC plant (Make - Carrier) including taking down unserviceable one complete all as specified and directed.
Supply & fix LP switch for 26 TR ductable AC plant (Make - Carrier) including taking down unserviceable one complete all as specified and directed.
Supply & fix sub cooler sensor for 26 TR ductable AC plant (Make - Carrier) including taking down unserviceable one complete all as specified and directed.
Supply & fix electronic expansion valave suitable for 26 TR ductable AC plant (Make - Carrier) including taking down unserviceable one including charging/dishcharging of refrigerant gas alongwith necessary brazing work and pressure testing complete all as specified and directed
Material and labour for repair/maintenance of 26 TR ductable AC plant by leak testing with N - 2 gas under constant pressure of 250 PSI (17 Kg/cm2) after complete transfer of refrigerant gas from the entire system, rectification of leakage by cutting and brazing the refrigeration system wherever required, replacement of 'O' rings, teflon washers of valves, copper tubing, safety valves, flare nuts etc. neutralising after the pressure holds, good for atleast 24 hours, vaccumization, charging the system with refrigerant gas, performance test and commissioning complete all as specified and directed. Note : - Gas charging shall be measured and paid separately)
Material & labour for 26 TR ductable AC plant complete checking, servicing / rectification of electrial circuits for all units and control wiring showing phase sequence with proper lugging of AC plant control panel including replacement of fused indication lamps with new ones, cleaning of all power contacts, rectification of minor defects in Ammeter and Voltmeters, testing and commissioning complete all as specified and as directed.
Material and labour for replacement of suction lines, oil pressure lines, HP/LP lines and cut out lines with existing size copper tubing including necessary brazing, flaring alongwith pumping down, and recharging after complete replacement of copper tubing, neutralizing after the pressure hold good for at least 24 hours vacuumization of system, testing and commissioning of air conditioning plants. Note : - Refrigerant gas shall be measured and paid for separately as supply only and pressure testing by replacing old flare nuts complete.
SRIESWARI ENTERPRISES
REAL ENGINEERING WORKS
ANAND ENTERPRISES AND ENGINEERS
SRI SIDDHI VINAYAKA ENTERPRISES
bhavani constructions
SAI ENGINEERING WORKS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .