Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | ₹2.8 L | L1 | Accepted-AOC L1 |
| 2 | Informal₹2.5 LRejected-AOC | ₹2.5 L | Informal | Rejected-AOC Informal |
Tender Value
₹2.9 L
EMD Value
₹5,809
Closing Date
19 Mar 2026, 3:00 pmClosed
Executive Engineer,P.W.Div-IV,AMC
O/O the Executive Engineer,P.W.Div-IV,AMC
Const of new drain and slab at started from HO Kalipada Debnath to HO Panchananda Debnath at Ajitpalli Under Ward no 29 AMC
2026_SAMC_71564_1
DNIET-48/Div-IV/AMC/2025-26
Open Tender
Civil Works
Percentage
60 days
under ward no-29, AMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
₹5,809
Yes
9 Jun 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
Earth work in excavation by mechanical means (Hydaulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 5.00 m. All Kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size).
First class brick work in foundation and plinth including cost of all materials as required complete:In cement mortar 1:4 ( 1 cement : 4 fine sand ).
Probiding and laying flat brick floooring in cement morter including cement slurry etc complete.In cement morter 1:4 ( 1cement :4 fined sand)
12 mm cement plaster of mix: Cement mortar 1:4 (1 cement : 4 fine sand).
Neat Cement Punning
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring shuttering,finishing and reinforcement.All work upto plinth level;-1:1.5:3(1Cement: 1.5 fine sand :3 graded stone aggregate 20mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering shuttering including struttings, propping etc. and removal of form work for: Suspended fioors, roofs, landings,balconies and access platform with timber planks
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_72818.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_72818.xls
BOQ • 0.33 MB
DNIET48.pdf
Tender Documents • 2.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].