| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Fee/PreQual/Technical/Finance AT WARD 10 PO BIRAMITRAPUR DIST SUNDARGARH ODISHA | BIRAMITRAPUR | SUNDARGARH | ODISHA | +0.00% | ₹5.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹5.9 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹5.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹5.9 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹5.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹5.9 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹5.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹5.9 LAdmitted-Fee/PreQual/Technical/Finance AT KARKATNASA PO PS HATIBARI DIST SUNDARGARH ODISHA | HATIBARI | SUNDARGARH | ODISHA | +0.00% | ₹5.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.9 L
EMD Value
₹5,880
Closing Date
15 Jun 2026, 5:00 pmClosed
EXECUTIVE OFFICER, BIRMITRAPUR MUNICIPALITY
EXECUTIVE OFFICER, BIRMITRAPUR MUNICIPALITY
Detailed estimate for Construction of paver road from Jitendra Majhi house to Dhoba Sahu land Talsera Sahu basti in W.no-11
2026_ORULB_130676_30
EO/BRMP/02/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
BIRMITRAPUR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹5,880
Yes
22 Jun 2026
4 Jun 2026
17 Jun 2026
4 Jun 2026
15 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil with initial lead and lift including rough dressing and leveling the bed and depositing the soil away as directed by E.I.C . | 22.92 | cum | 282.88 | ₹6,483.61 |
| 2 | Sand filling with filling sand inside F and P including watering and ramming, cost of material, labour, conveyance all taxes T and P etc. complete. | 32.95 | cum | 738.69 | ₹24,339.84 |
| 3 | Metal concrete (1:3:6) using 40mm size CBG metal with all cost of material, labour, conveyance, royalty, taxes T and P etc. complete. | 7.64 | cum | 6,182.65 | ₹47,235.45 |
| 4 | Labour for laying sub base in layers not exceeding 100mm ,watering ,compaction to the required density including cost,conveyance of material & all T & P etc complete.(with crusher Dust) | 25.31 | cum | 1,538.37 | ₹38,936.14 |
| 5 | C. C (1:2:4) using 12mm size CBG chips chips including compacting, curing, all cost of material, labour, conveyance, royalty, taxes T and P etc. complete excluding centering and shuttering. | 19.73 | cum | 7,757.3 | ₹1,53,051.53 |
| 6 | Supplying & fixing of 80mm thick cement concrete interlocking paver blocks of M40 grade of approved make ,design,colour & size made by block making machine with proper compaction laid in required pattern etc.complete in all respect confirming to IRC SP-63:2018. | 506.15 | sqm | 608.4 | ₹3,07,941.66 |
| 7 | Towards Photograph of project, display board & other unforseen items | 1 | Nos | 10,000 | ₹10,000 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_594337.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .