Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance HIMACHAL PRADESH HP | ₹1.6 L | L1 | Accepted-Finance QUOTED RATES AT LOWER SIDES. |
| 2 | L2₹1.7 L+₹10,160 (6.21%)Rejected-Finance VILLAGE BADHAL JEORI TEHSIL RAMPUR DISTT SHIMLA H P | ₹1.7 L+₹10,160 (6.21%) | L2 | Rejected-Finance QUOTED RATES AT HIGHER SIDES. |
| 3 | L3₹1.8 L+₹11,798 (7.21%)Rejected-Finance HIMACHAL PRADESH HP | ₹1.8 L+₹11,798 (7.21%) | L3 | Rejected-Finance QUOTED RATES AT HIGHER SIDES. |
Tender Value
₹1.6 L
EMD Value
₹4,100
Closing Date
17 Jul 2026, 3:30 pmClosed
SR. XEN
ED, HPSEBL, RECKONG PEO.
Tender for providing electrification to LOH of village Nako and Malling Dogri by providing 1-phase LT extension from existing 22/0.4KV, 100KVA S/Stn. Nako-II And 25KVA Yangthang in Electrical Section Yangthang under Electrical Sub Division, HPSEBL,
2026_HPSEB_138716_1
RPO/ED/DB-11/2026-27/12
Open Tender
Supply and Erection
Percentage
30 days
Nako
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹4,100
22 Jul 2026
10 Jul 2026
18 Jul 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ERRECTION OF L.T LINE ON 8/9Mtr. Long S.T pole. | - | - | - | - |
| 2 | (i) Digging of pit, Laying of RCC muff,Drilling of holes in poles. Erection of pole,Erection of shackle insulator, filing of pit and ramming, Painting of pole. (Complete in all respect). | - | Each | 3,772.46 | - |
| 3 | ERRECTION OF STAY SET | - | - | - | - |
| 4 | Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect. | - | P/Set | 1,998.92 | - |
| 5 | SAGGING OF ACSR CONDUCTOR 6/1/2.59mm (Single wire). | - | - | - | - |
| 6 | Laying of conductor, stringing & sagging, Binding with insulator (only). | - | P/Km | 8,904.28 | - |
| 7 | Sagging of G.I Wire for earth wire. | - | P/Km | 5,065.74 | - |
| 8 | MANNUAL CARRIAGE OF L.T LINE MATERIAL CONSIDERING AVERAGE DISTANCE 0.750K.M. | - | P/Km | 29,906.81 | - |
| 9 | MATERIAL TO BE SUPPLIED BY CONTRACTOR (Subject to the non-availability of material at Divisional Store). | - | - | - | - |
| 10 | Prov.RCC Muffs (2000mm) with concrete filling. | - | Nos. | 1,622 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.00 MB
BOQ_205468.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .