Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-AOC | ₹2.9 L | 1 | Accepted-AOC 1 |
Tender Value
₹2.6 L
EMD Value
₹6,543
Closing Date
28 Feb 2026, 6:00 pmClosed
The Assistant Engineer
The Assistant Engineer,LSGD Valakom Section,Valakom Panchayath
WATER WORKS
2026_LSGD_831597_2
46/AE/LIDEW/VPT/P46/25-26
Open Tender
Civil Works - Water Works
Percentage
30 days
Valakom GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹580
Yes
₹6,543
Yes
3 Aug 2026
21 Feb 2026
2 Mar 2026
21 Feb 2026
28 Feb 2026
21 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1POND RENOVATION | |||||
| 1.001 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | 345.54 | - |
| 1.002 | OD432713/2025-2026:desilting thodu using hydraulic excavator (clearing debris and silt from thodu),depositing at the
banks ,dressing etc. complete Details of cost for 10 cum. Average output of Hydraulic Excavator per hour = 30cum | - | cum | 121.9 | - |
| 1.003 | OD432714/2025-2026:Removing water weeds such as hyasinth grass etc,by rooting out of small tress and all floating
debris using Amphibious excavator wherever necessary including conveying the debris from the
site and depositing same with contractors own risk place of choice etc. complete as per the
direction of the departmental officers ( Outturn of the Machine is taken as 10000 Sqm per day)
Calculated for the out turn of 10000 sqm per day | - | sqm | 9.59 | - |
| 1.004 | OD432711/2025-2026:Dry rubble masonry with with DEPARTMENT RUBBLE. complete as per direction of
departmental officers at site. | 1 | cum | 1,715.88 | ₹1,714.16 |
| 1.005 | OD432712/2025-2026:Dry rubble masonry with good quality blasted rubble including conveyence of materials and labour charges etc. complete as per direction of departmental officers at site | - | cum | 3,653.72 | - |
| 1.006 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | 9,235.97 | ₹9,226.73 |
| 1.007 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | 18.19 | - |
| 1.008 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | - | cum | 6,831.14 | - |
| 1.009 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | - | sqm | 369.76 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.33 MB
BOQ_1412990.xls
BOQ • 0.32 MB
SBDNIT.pdf
Tender Documents • 0.79 MB
AFFIDAVIT.pdf
Tender Documents • 0.35 MB
epayment.pdf
Tender Documents • 0.35 MB
FoT.pdf
Tender Documents • 0.40 MB
IP.pdf
Tender Documents • 0.34 MB
PA.pdf
Tender Documents • 0.26 MB
date.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .