Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.6 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹49.9 L+₹1.7 L (3.46%)Rejected-AOC | L2 | Rejected-AOC Being L2 | |
| 3 | L3₹50.5 L+₹2.3 L (4.80%)Rejected-AOC | L3 | Rejected-AOC Being L3 | |
| 4 | L4₹50.7 L+₹2.5 L (5.18%)Rejected-AOC | L4 | Rejected-AOC Being L4 | |
| 5 | L5₹51.3 L+₹3.1 L (6.51%)Rejected-AOC | L5 | Rejected-AOC Being L5 |
| Sl No | Description | Qty | Unit | M/S TAPAN KUMAR RAY L5 | M/S SANJIB DEB L7 | ABDUL AUDUD L3 | m/s builders and suppliers L2 | M/S SUBHAM ENTERPRISE L8 | M/S MOLOY KUMAR DEY L4 | MAGADH TRADING L1 | SHRI YOUNUS KHAN L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00B & R Division Items | |||||||||||
| 2.00 | Demolition of Concrete (reinforced) of any description and in any position not otherwis specifically provided for complete all as specified and as directed. | 0.5 | Cum | 850 ₹425 | 980 ₹490 | 900 ₹450 | 830 ₹415 | 1,000 ₹500 | 820 ₹410 | 800 ₹400 Lowest | 960 ₹480 |
| 3.00 | Demolition of cement concrete (un-reinforced) in ground floors and pavings not exceeding 15cm thickness (below or above ground level) and removal of debris complete all as specified and as directed. | 128.75 | Cum | 940 ₹1,21,025 | 960 ₹1,23,600 | 950 ₹1,22,312.5 | 905 ₹1,16,518.75 | 950 ₹1,22,312.5 | 910 ₹1,17,162.5 | 900 ₹1,15,875 Lowest | 950 ₹1,22,312.5 |
| 4.00 | Demolition Stone slabs and tiles of any description or thickness in floors, aprons etc. laid dry or laid dry and pointed complete all as specified and as directed. | 6 | 10 Sqm | 600 ₹3,600 | 740 ₹4,440 | 620 ₹3,720 | 600 ₹3,600 | 750 ₹4,500 | 580 ₹3,480 | 500 ₹3,000 Lowest | 750 ₹4,500 |
| 5.00 | Demolition of brickwork or stone / boulder masonry, built in cement mortar including all quoins, arches, pillars, etc but excluding ashlar facings, dressed stonework and precast concrete articles and disposing off complete all as specified and as directed. | 14.5 | Cum | 850 ₹12,325 | 890 ₹12,905 | 840 ₹12,180 | 810 ₹11,745 | 900 ₹13,050 | 820 ₹11,890 | 800 ₹11,600 Lowest | 888 ₹12,876 |
| 6.00 | Dismantling floor hearth or wall tiling including cement mortar bedding (but not backing) and disposing off complete all as specified and as directed. | 99.2 | Sqm | 65 ₹6,448 | 100 ₹9,920 | 70 ₹6,944 | 65 ₹6,448 | 110 ₹10,912 | 70 ₹6,944 | 60 ₹5,952 Lowest | 90 ₹8,928 |
| 7.00 | Dismantling wall and ceiling boards (AC,fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness including cover fillets, frameworks, etc. complete all as specified and as directed. | 157.5 | Sqm | 28 ₹4,410 | 45 ₹7,087.5 | 30 ₹4,725 | 25 ₹3,937.5 | 40 ₹6,300 | 25 ₹3,937.5 | 20 ₹3,150 Lowest | 40 ₹6,300 |
| 8.00 | Dismantling boarding any description fixed in any position with nails complete all as specified and directed. | 10.75 | Sqm | 45 ₹483.75 | 60 ₹645 | 47 ₹505.25 | 45 ₹483.75 | 50 ₹537.5 | 48 ₹516 | 40 ₹430 Lowest | 55 ₹591.25 |
| 9.00 | Dismantling mild steel work or wrought iron of any description and in any position complete all as specified and as directed. | 7.4 | Qtl | 770 ₹5,698 | 770 ₹5,698 | 760 ₹5,624 | 720 ₹5,328 | 760 ₹5,624 | 750 ₹5,550 | 700 ₹5,180 Lowest | 770 ₹5,698 |
| 10.00 | Dismantling plain or corrugated steel sheeting, any gauge or any thickness as in roof covering, wall cladding, etc.including all necessary staging / scaffolding, etc. as required complete all as specified and as directed. | 303.25 | Sqm | 48 ₹14,556 | 60 ₹18,195 | 48 ₹14,556 | 45 ₹13,646.25 | 70 ₹21,227.5 | 46 ₹13,949.5 | 40 ₹12,130 Lowest | 66 ₹20,014.5 |
Tender Value
₹46.9 L
EMD Value
₹93,800
Closing Date
18 Feb 2026, 6:00 pmClosed
GE Silchar
Office of the GE Silchar Masimpur Cantt
SPECIAL REPAIR TO BLDG NO T-750 AND P-17 (KITCHEN AND GYM PORTION), HARDSTANDING AT MOI AND NEAR KALIBARI TCP AT MASIMPUR MILITARY STATION
2026_MES_750159_1
8115A/E8
Open Tender
Civil Works
Item Rate
180 days
Masimpur
Class D Category a i and other criteria as per NIT and Tender Doc
7 documents required · 7 mandatory
₹500
GE Silchar
₹93,800
Yes
1 Apr 2026
28 Jan 2026
21 Feb 2026
28 Jan 2026
18 Feb 2026
11 Feb 2026
28 Jan 2026 - 4 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | B & R Division Items | - | - | - | - |
| 2 | Demolition of Concrete (reinforced) of any description and in any position not otherwis specifically provided for complete all as specified and as directed. | 0.5 | Cum | - | - |
| 3 | Demolition of cement concrete (un-reinforced) in ground floors and pavings not exceeding 15cm thickness (below or above ground level) and removal of debris complete all as specified and as directed. | 128.75 | Cum | - | - |
| 4 | Demolition Stone slabs and tiles of any description or thickness in floors, aprons etc. laid dry or laid dry and pointed complete all as specified and as directed. | 6 | 10 Sqm | - | - |
| 5 | Demolition of brickwork or stone / boulder masonry, built in cement mortar including all quoins, arches, pillars, etc but excluding ashlar facings, dressed stonework and precast concrete articles and disposing off complete all as specified and as directed. | 14.5 | Cum | - | - |
| 6 | Dismantling floor hearth or wall tiling including cement mortar bedding (but not backing) and disposing off complete all as specified and as directed. | 99.2 | Sqm | - | - |
| 7 | Dismantling wall and ceiling boards (AC,fibre,pulp, insulation, etc.) or insulation boards/slabs/blankets, any thickness including cover fillets, frameworks, etc. complete all as specified and as directed. | 157.5 | Sqm | - | - |
| 8 | Dismantling boarding any description fixed in any position with nails complete all as specified and directed. | 10.75 | Sqm | - | - |
| 9 | Dismantling mild steel work or wrought iron of any description and in any position complete all as specified and as directed. | 7.4 | Qtl | - | - |
| 10 | Dismantling plain or corrugated steel sheeting, any gauge or any thickness as in roof covering, wall cladding, etc.including all necessary staging / scaffolding, etc. as required complete all as specified and as directed. | 303.25 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.16 MB
8115A-TP.pdf
Tender Documents • 0.57 MB
BOQ_840180.xls
BOQ • 0.43 MB
8115A-SchOfCreditformat.pdf
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .