Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
12 Dec 2022, 2:00 pmClosed
Block Development officer(VP)
Panchayat union office, Thottiyam
Desiliting of main pond, Baby Pond, Inlet Channel, Paving Revetment and Construction of Bhathing ghat at Minathampatty Kuttai in Kamalapuram Panchayat. (40.0 x 60.0m ) in Thottiyam block
2022_RDTN_269986_1
B7/3224/2022 date 29.11.2022
Open Tender
Civil Works - Buildings
Item Rate
120 days
Thottiyam
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹12,000
Yes
13 Dec 2022
5 Dec 2022
12 Dec 2022
5 Dec 2022
12 Dec 2022
5 Dec 2022
Amount
Desiliting of main pond, Baby Pond, Inlet Channel, Paving Revetment and Construction of Bhathing ghat at Minathampatty Kuttai in Kamalapuram Panchayat. (40.0 x 60.0m )Clearing the juliflora jungle without uprooting
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
For Stone Pitching Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc except sand and rock requiringblastingwith all incidental charges etc completefor foundation asper SS20B
Cement concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and labour charges, cement which will be supplied by dept shorings huttering baling out water etc., complete For foundation & basement
Cement concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and labour charges, cement which will be supplied by dept shorings huttering baling out water etc., complete For foundation & basement
Supplying & Erecting centring for sides & Sofits Including Necessary supports up to 3.29 M Hegiht including all labour charges etc., complete
Rough Stone dry Packing For Apron and Revetment including cost and conveyance of all materials to site and all labour charges etc
BABY POND LINING WALL Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc except sand and rock requiringblastingwith all incidental charges etc completefor foundation asper SS20B
Cement concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and labour charges, cement which will be supplied by dept shorings huttering baling out water etc., complete For foundation & basement
Cement concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and labour charges, cement which will be supplied by dept shorings huttering baling out water etc., complete For foundation & basement
Supplying & Erecting centring for sides & Sofits Including Necessary supports up to 3.29 M Hegiht including all labour charges etc., complete
FOR INLET AND OUTLET Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc except sand and rock requiringblastingwith all incidental charges etc completefor foundation asper SS20B
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Cement concretein C M 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and labour charges, cement which will be supplied by dept shorings huttering baling out water etc., complete For foundation & basement
Cement concretein C M 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and labour charges, cement which will be supplied by dept shorings huttering baling out water etc., complete For foundation & basement
Supplying & Erecting centring for sides & Sofits Including Necessary supports up to 3.29 M Hegiht including all labour charges etc., complete
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Provision for Name Board etc
Provision for Photo charges etc
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
THANGAM BUILDERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .