Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹32 L+₹7.5 L (30.7%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹41 L+₹16.5 L (67.4%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DEV BHUMI ROPEWAYS PVT LTD L2 | Advance engineering solutions L1 | J S MOHAR CONSTRUCTION COMPANY PVT. LTD. L3 |
|---|---|---|---|---|---|---|
| 1.01 | Rope Splicing Work at Chairlift Auli Tensioning Removal and Old Rope down and opening of splice and remove from track. New Rope pulling and bright in position tensioning and hold both side and start splicing. After splicing release and tensioning. comprising following works including loading from Rishikesh, Transport to Auli and Unloading, Shifting to LTP of Chair lift at Auli Distt. Chamoli including Transportation of all required tools, tackles, and equipment to Auli site, Shifting of tools and tackles from base location to the designated splicing zone and Inspection of site conditions, safety setup, and marking of working area and also including Removal of all chairs from the haulage rope and proper stationing/storage, Shifting of the marry point (rope joint reference point) towards the splicing zone, Anchoring of the rope securely from both ends to prevent movement with Installation and jamming of hydraulic jacks to release rope tension safely, Removal of the existing (old) rope from the line/track, Opening and dismantling of the old rope splice, Temporary splicing (marrying) of new rope with old rope to pull the new rope onto the track, Complete removal of old rope once new rope is positioned, Positioning of the new rope accurately in the splicing zone, Execution of final rope splicing, Gradual release of hydraulic jacks and restoration of rope tension, Conducting minimum 2-hour empty rope trial run, Reinstallation of all chairs onto the haulage rope and Conducting load testing complete in all respect as per direction by E/I | 1 | JOB | 21,00,000 ₹21,00,000 | 16,30,000 ₹16,30,000 Lowest | 25,00,000 ₹25,00,000 |
| 1.02 | Rope Splicing Work at POMA SKILIFT Auli including Tensioning Removal and Old Rope down and opening of splice and remove from track. New Rope pulling and bright in position tensioning and hold both side and start splicing. After splicing release and tensioning. comprising following works including loading from Rishikesh, Transport to Auli and Unloading, Shifting to LTP of Skilift at Auli Distt. Chamoli including Transportation of all required tools, tackles, and equipment to Auli site, Shifting of tools and tackles from base location to the designated splicing zone and Inspection of site conditions, safety setup, and marking of working area and also including Removal of all Ski-bars from the haulage rope and proper stationing/storage, Shifting of the marry point (rope joint reference point) towards the splicing zone, Anchoring of the rope securely from both ends to prevent movement with Installation and jamming of hydraulic jacks to release rope tension safely, Removal of the existing (old) rope from the line/track, Opening and dismantling of the old rope splice, Temporary splicing (marrying) of new rope with old rope to pull the new rope onto the track, Complete removal of old rope once new rope is positioned, Positioning of the new rope accurately in the splicing zone, Execution of final rope splicing, Gradual release of hydraulic jacks and restoration of rope tension, Conducting minimum 2-hour empty rope trial run, Reinstallation of all Ski-bars onto the haulage rope and Conducting load testing complete in all respect as per direction by E/I | 1 | JOB | 11,00,000 ₹11,00,000 | 8,19,000 ₹8,19,000 Lowest | 16,00,000 ₹16,00,000 |
Tender Value
₹14.3 L
EMD Value
₹28,600
Closing Date
19 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager Project
GMVN Head Office 74/1 Rajpur Road, Dehradun
SPLICING WORK OF HAULAGE ROPE FOR SKI LIFT (POMA) AND CHAIR LIFT INCLUDING LOADING FROM RISHIKESH, TRANSPORT TO AULI AND UNLOADING, SHIFTING TO LTP OF CHIAR LIFT AT AULI DISTT CHAMOLI.
2026_GMVN_99562_1
GMVN- PROJ-SPLAULI
Open Tender
Miscellaneous Works
Item Rate
90 days
AULI DISTT CHAMOLI.
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,770
General Manager (Project)
₹28,600
DEHRADUN
16 Oct 2026
31 Aug 2026
19 Sept 2026
31 Aug 2026
19 Sept 2026
5 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Rope Splicing Work at Chairlift Auli Tensioning Removal and Old Rope down and opening of splice and remove from track. New Rope pulling and bright in position tensioning and hold both side and start splicing. After splicing release and tensioning. comprising following works including loading from Rishikesh, Transport to Auli and Unloading, Shifting to LTP of Chair lift at Auli Distt. Chamoli including Transportation of all required tools, tackles, and equipment to Auli site, Shifting of tools and tackles from base location to the designated splicing zone and Inspection of site conditions, safety setup, and marking of working area and also including Removal of all chairs from the haulage rope and proper stationing/storage, Shifting of the marry point (rope joint reference point) towards the splicing zone, Anchoring of the rope securely from both ends to prevent movement with Installation and jamming of hydraulic jacks to release rope tension safely, Removal of the existing (old) rope from the line/track, Opening and dismantling of the old rope splice, Temporary splicing (marrying) of new rope with old rope to pull the new rope onto the track, Complete removal of old rope once new rope is positioned, Positioning of the new rope accurately in the splicing zone, Execution of final rope splicing, Gradual release of hydraulic jacks and restoration of rope tension, Conducting minimum 2-hour empty rope trial run, Reinstallation of all chairs onto the haulage rope and Conducting load testing complete in all respect as per direction by E/I | 1 | JOB | - | - |
| 1.02 | Rope Splicing Work at POMA SKILIFT Auli including Tensioning Removal and Old Rope down and opening of splice and remove from track. New Rope pulling and bright in position tensioning and hold both side and start splicing. After splicing release and tensioning. comprising following works including loading from Rishikesh, Transport to Auli and Unloading, Shifting to LTP of Skilift at Auli Distt. Chamoli including Transportation of all required tools, tackles, and equipment to Auli site, Shifting of tools and tackles from base location to the designated splicing zone and Inspection of site conditions, safety setup, and marking of working area and also including Removal of all Ski-bars from the haulage rope and proper stationing/storage, Shifting of the marry point (rope joint reference point) towards the splicing zone, Anchoring of the rope securely from both ends to prevent movement with Installation and jamming of hydraulic jacks to release rope tension safely, Removal of the existing (old) rope from the line/track, Opening and dismantling of the old rope splice, Temporary splicing (marrying) of new rope with old rope to pull the new rope onto the track, Complete removal of old rope once new rope is positioned, Positioning of the new rope accurately in the splicing zone, Execution of final rope splicing, Gradual release of hydraulic jacks and restoration of rope tension, Conducting minimum 2-hour empty rope trial run, Reinstallation of all Ski-bars onto the haulage rope and Conducting load testing complete in all respect as per direction by E/I | 1 | JOB | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 1.80 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
ropedc1.pdf
Tender Documents • 0.53 MB
BOQ_117403.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .