| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹2.5 Craccepted-aoc | ₹2.5 Cr | accepted-aoc |
Tender Value
₹2.4 Cr
EMD Value
₹3.6 L
Closing Date
13 Mar 2026, 9:30 pmClosed
Minor Irrigation Department
Executive Engineer
REPAIRS TO MUDHOL(B) MI TANK OF KAMALNAGAR TALUKA BIDAR DISTRICT
MI/2025-26/CN/WORK_INDENT10088
MI/2025-26/CN/WORK_INDENT10088
Open
Canals including Lining and Structures
Two Tender Document System(Two Cover)
Minor Irrigation Division Bidar
7 documents required · 7 mandatory
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
List of Financial Resources with Certificates
ITT 3.2b.Satisfactory completion (at least 90% of the contract value), as Prime contractor, at least one similar work such as Improvement/Construction of MI Tank/Percolation tank from Single Contract of value not less than Rs. 120.93 Lakhs during the last five years (2020-21 to 2024-25 ). The work done certificate should be obtained duly signed from an Officer not below the rank of Executive Engineer of the concerned division. Cost of completed works of previous years will be given weightage of 10% per year to bring them to 2025-26 price level
ITT 3.2c To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.(2020-21, 2021-22, 2022-23,2023-24 & 2024-25 ) Executed in any one year the minimum quantities of work: 1)EWE (combined excavation and embankment): 9886.52cum, 2) Cement concrete: 1596.90 Cum, 3) Steel : 57.60 Tonne
Section 3 Qualification Information.
The tenderer shall give details of works on hand (Present contract commitment)
ITT3.2 a. To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. (2020-21, 2021-22, 2022-23,2023-24 & 2024-25 ). Achieved in at least two financial years a minimum financial turnover of Rs. 483.73 Lakhs.Financial turn over of previous years will be given a weightage of 10% per year to bring them to the price level of FY 2025-26
ITT3.3 b. Liquid assets and / or availability of credit facilities of not less than Rs. 147.93 Lakhs (Credit lines/letter of credit / certificates from banks for meeting the fund requirement. It should be in prescribed format appended in Bid document.
All documents including details of EMD are to be mentioned in the technical bid only ( as per KPPP options)
All documents to be furnished are to be attested by the officer of not below the rank of Executive Engineer or by Notary.
The Tenderer shall have valid class - I KPWD License (upload registration certificate of original should be produced while opening the tender)
₹5,000
₹3.6 L
13 Mar 2026
28 Feb 2026
16 Mar 2026
11 Mar 2026
9 Mar 2026
Draft Conditions for approval
1 Tenders from Joint ventures are not acceptable.
2 Bidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.
3 It shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPPP on or before the last date and time of bid submission.
4 The bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders end.
5 EMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.
6 The employer reserves the right to accept or reject any or all tenders without assigning any reason.
7 The intending Bidder/ firm/ company are advised to visit the work site before submission of the tenders.
8 The necessary Certificates / documents in support of eligibility criteria fulflled as stipulated shall be scanned and attached to e- tender document. The original certificate / documents shall be produced prior to the opening of bid for verification. Scanned signature of the Bidder/ firm/ company authorized representative of the Bidder/ firm/ company shall be attached while uploading bid document.
9 If any of the dates mentioned above happens to be a general holiday, the next working day holds good
10 conditional tenders are liable to be rejected. The officer competent to accept the tender shall have the right to reject any or all the tenders without assigning any reason whatsoever.
11 Corrigendum will be published in the website for all modifications or corrections if any.
12 The contractor should mention their recent correct postal address & mail address in declaration forms.
13 All materials like steel, cement etc., required for the above work should be procured by the contractor only. No departmental supply of any materials shall be made by Department.
14 The contractor should adhere to the accepted execution plan submitted by him under any circumstances without linking to the pending payment of the work & also Land acquisition problems if any.
15 Typographical errors, if any, will not be the ground for any claims by the Contractor
16 The necessary Certificates / documents in support of eligibility criteria fulfilled as stipulated shall be scanned and attached to e- tender document. The original certificate / documents shall be produced for verification when demanded, otherwise the tender will be treated as non responsive bid and rejected.
17 Incomplete tender documents will be rejected.
18 As per the Karnataka Building and other Constructions Workers Welfare Cess Act 1996, 1% of the bill amount will be deducted from the bills.
19 The contractor should furnish the name of the individual / firm / company with address & telephone No with place of registration, year of incorporation etc.
20 Original documents shall be produced for verification at the any stage of tender process, Failure to produce original documents will lead to disqualification. work done certificate should have all the details CR no, work order issuing date, work completion date and year as asked in bid document.
21 The Applicant shall be registered in KPWD and shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by GOK/GOI.
22 Restrictions on Public Procurement from Bidders of certain countries as per Government order No. FD 455 Exp-12 2020 Bengaluru dated:25-08-2020
23 During the execution of works, if any minor minerals are required, contractors have to abide by the prevailing rules and Acts applicable to Minor Minerals. As per the prevailing rules, for any use of Minor Minerals, the contractor has to submit the mineral Dispatch Permit (MDP) obtained from Mines and Geology Department. If mineral Dispatch permit (MDP) is not submitted by the contractor along with the bill, the prevailing penalty DMF contribution as per Karnataka Minor Mineral Concession Rules 1994 (as amended from time to time) will be deducted from the contractors bill.
24 The agencies participating in the tender shall be registered in the Construction Labor Board as per the G.O. No. LD 300 LET 2006 Dated:18-1-2007 and Addendum No. LD 95 LET 2013 Bengaluru Dt:1-4-2013. Also the contractors entrusted with the work shall employ the labors only who have registered in the Karnataka Building and Construction Workers Welfare Board failing which the contractor shall be liable for any further action as deem fit by the authority.
25 Within 20 days of receipt of the Letter of Acceptance, the successful Tenderer shall deliver to the Employer a Security deposit in any of the forms as mentioned in bid document for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with Clause 25.5 of ITT and Clause 44 of the Conditions of Contract for all works.
26 The Contractor shall quote the rates without adding GST for either materials or works contract (Service). GST payable by the Contractor under this works contract will be paid to the contractor separately as per prevailing orders.
27 The contractor has to make his own arrangements for procurement of all the required materials and the materials so procured shall confirm to the relevant IS Specifications and obtain necessary quality certificate from authorized quality control.
28 The tenderer shall also disclose if there are any bankruptcy proceedings against him.
29 The Work Done Certificates shall be issued by the Executive Engineer with indent number mentioned (if work done in Karnataka State), otherwise it shall be issued/counter signed by Superintending Engineer (if the work is done in other states).
30 Sub-Leasing/G.P.A of Work is Prohibited.
31 Each Item Of BOQ To be read as with all lead and lifts and including loading and unloading charges and all other charges and as per the direction of Engineer in charge.
32 Uploaded drawings are for TENDER PURPOSE ONLY.
33 The statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the work listed should be countersigned by the Employer in charge, not below the rank of an Executive Engineer or equivalent.
34 Income Tax : Latest copy of the Income Tax Clearance Certificate and Sale Tax Clearance PAN and TAN Nos. to be uploaded
35 It shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee into the respective receiving bank accounts of KPPP Portal on or before the last date and time of bid submission.
36 The tender processing charges paid by the bidder/ firm/ company are not refundable even if the tenders are cancelled
37 The tenderer should maintain the scheme during the defective liability period.
38 The contractor should establish quality control laboratory equiped with all the equipments and the materials should be periodically tested and properly documented as per the direction of the Engineer-in-charge of the work.
39 All other terms and conditions as per KW-4 tender documents.
40 Any increase in GST amount will not be paid under this contract beyond the tender period.
Technical conditions:
1 The Tenderer shall have valid class - I KPWD License (upload registration certificate of original should be produced while opening the tender) Registration Registration Certificate
2 ITT3.2 a. To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. (2020-21, 2021-22, 2022-23,2023-24 & 2024-25 ). Achieved in at least two financial years a minimum financial turnover of Rs. 483.73 Lakhs.Financial turn over of previous years will be given a weightage of 10% per year to bring them to the price level of FY 2025-26 Financial Status Certificate issued by Chartered Accountant
3 ITT 3.2b.Satisfactory completion (at least 90% of the contract value), as Prime contractor, at least one similar work such as Improvement/Construction of MI Tank/Percolation tank from Single Contract of value not less than Rs. 120.93 Lakhs during the last five years (2020-21 to 2024-25 ). The work done certificate should be obtained duly signed from an Officer not below the rank of Executive Engineer of the concerned division. Cost of completed works of previous years will be given weightage of 10% per year to bring them to 2025-26 price level Past Experience Work Done Certificate
4 ITT 3.2c To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.(2020-21, 2021-22, 2022-23,2023-24 & 2024-25 ) Executed in any one year the minimum quantities of work: 1)EWE (combined excavation and embankment): 9886.52cum, 2) Cement concrete: 1596.90 Cum, 3) Steel : 57.60 Tonne Past Experience Work Done Certificate showing quantity of the different item
5 ITT3.3 b. Liquid assets and / or availability of credit facilities of not less than Rs. 147.93 Lakhs (Credit lines/letter of credit / certificates from banks for meeting the fund requirement. It should be in prescribed format appended in Bid document. Financial Status Line of credit as prescribed in section 3
6 Section 3 Qualification Information. Capabilities of Vendor Section -3 of Bid Document
7 The tenderer shall give details of works on hand (Present contract commitment) Capabilities of Vendor Certified Copy
8 All documents including details of EMD are to be mentioned in the technical bid only ( as per KPPP options) Document Relevant Document
9 All documents to be furnished are to be attested by the officer of not below the rank of Executive Engineer or by Notary. Documents Relevant Document
All items are with all leads and lifts including loading and unloading as per the direction of the Engineer-in-charge of the work.
1 Contractors Registration Certificate
2 Annual Turnover Certificate issued by the C.A
3 Work Done Certificate for executed quantity
4 Similar Nature Of work done Certificate issued not below the rank of E.E
5 Line Of Credit
7 Section 3 Qualification Information.
8 Assess available tender capacity
Information on litigation in which the Tenderer is involved:
Other Party/Parties Employer Details of Dispute Amount involved Remarks showing Present Status
BANKER’S CERTIFICATE
Format No.2 ON BANKS LETTER HEAD ……………………………………………………………………………………………………………………………. FORMAT OF BANKER’S CERTIFICATE / LINE OF CREDIT LETTER [ TO BE ISSUED IN THE LETTER HEAD OF THE BANK BRANCH ] Reference Number (Sl. No. ) Place: Date: [Name & address of the beneficiary ] This is to certify that Mr./M/s. …………………………..[Name of the customer] having his/their registered/ administrative office at ........................................is a customer of our Bank and is / are engaged in ............................... [ nature of activity] . If the said customer is allotted / awarded with ...................................................................... [ brief details of works], we may extend credit facilities upto Rs.......................... lakh to meet his/ their working capital requirement towards the execution of the said work order as per the Loan Policy of the Bank. This certificate is valid upto three months from date of issue, that is upto dd/mm/yyyy. Yours faithfully, Branch Manager
Name of the Bank, Senior Bank Manger
Address:…………………………
BANKER'S LETTER HEAD (Must mention Communication details: Address, Phone number, Email-Id)
BANKER’S CERTIFICATE
This is to certify that M/s. …………………………..(Name of the customer) Is having his / their registered / administrative office at _______________ ____________________ is a customer of our Bank and is / are engaged in ____________________________ . If the said customer is allotted / awarded with _____________________ (brief details of works) , we may extend credit facilities upto Rs. ____________ Lakh, to meet his/ their working capital requirement towards of the said work order as per the Loan Policy of the Bank. This certificate is valid upto three months from date of issue, that is uoto Date __________
Yours Faithfully
Name of the Bank, Senior Bank Manger
Address:…………………………
List of Machinery
Item of Equipment Requirement Owned/ Hired/Leased Owned/ Hired/Lease and available Remarks
No. Capacity Number/Capacity Age/ Condition
FORMAT FOR WORK DONE CERTIFICATE TO BE OBTAINED FROM COMPETENT AUTHORITY
has executed/ is executing(strike off which ever is not applicable) the work of .............................................
in this Organisation. The details of the work is as under:
1 Name of the Project :
2 Name of the Work :
3 Contract Amount :
4 Date of signing the Agreement :
5 Date of handing over of the Site :
6 Progress * : 2008
January February March April May June July August September October November December
Earthworks in cum Physical :
Financial in lac :
Embankment / Subgrade in cum Physical :
Financial in lac :
Metalling in cum Physical :
Financial in lac :
Reinforcement in Quintal Physical :
Financial in lac :
Reinforcement Cement Concrete in cum Physical :
Financial in lac :
BM in cum Physical :
Financial in lac :
SDBC in sqm Physical :
Financial in lac :
* Monthwise progress shall be furnished seperately.
Date: (Authorised Signatory)
Address for correspondence:
Information of the works for which Tenderer has submitted Tender.
Project Name Name & Address of the Employer Name of Work Amount put to Tender in Rs lac. Specified period of completion (including/excluding Monsoon Prescribed last date of submission of tender Probable date of decision on the Tender Remarks if any.
Information of the works for which Tender acceptance letters are received.
Project Name Name & Address of the Employer Name of Work Tendered Amount in Rs lac Specified period of completion (including/excluding Monsoon Probable Date of Handing over of site
Information on works which are yet to be completed.
Project Name Name & Address of the Employer Name of Work Contract Number Value of contract Rs. Lakhs Date of Markout /Date of Handing over of site Specified period of completion (including/excluding Monsoon cost of balance works remaining Rs. in lac Probable date of completion
Name of Work Item of Work Name of Employer 2017-18 Remarks (Indicate contract reference)
January February March April May June July August September October November December
Earthworks in cum Physical
Metalling in cum Physical
Reinforcement in Quintal Physical
Reinforcement Cement Concrete in cum Physical
Surface Dressing in sqm Physical
BM in cum Physical
SDBC in sqm Physical
Mix Seal Surface in sqm Physical
Earthworks in cum Physical
Metalling in cum Physical
Reinforcement in Quintal Physical
Reinforcement Cement Concrete in cum Physical
Surface Dressing in sqm Physical
BM in cum Physical
SDBC in sqm Physical
Mix Seal Surface in sqm Physical
Earthworks in cum Physical
Metalling in cum Physical
Reinforcement in Quintal Physical
Reinforcement Cement Concrete in cum Physical
Surface Dressing in sqm Physical
BM in cum Physical
SDBC in sqm Physical
Mix Seal Surface in sqm Physical
Earthworks in cum Physical
Metalling in cum Physical
Reinforcement in Quintal Physical
Reinforcement Cement Concrete in cum Physical
Surface Dressing in sqm Physical
BM in cum Physical
SDBC in sqm Physical
Mix Seal Surface in sqm Physical
Earthworks in cum Physical
Metalling in cum Physical
Reinforcement in Quintal Physical
Reinforcement Cement Concrete in cum Physical
Surface Dressing in sqm Physical
BM in cum Physical
SDBC in sqm Physical
Mix Seal Surface in sqm Physical
NOTE: Seperate statement shall be submitted for each work.
Work executed as prime contractor (in the same name) on works of similar nature during the five years specified)
Project Name Name & Address of the Employer Name of Work Contract Number Value of contract Rs. Lakhs Date of Markout /Date of Handing over of site Specified period of completion (including/excluding Monsoon Actual date of completion Remarks (appreciation letter received for early completion or reasons, if there is delay in completion)
LETTER HEAD OF CA
Financial Year Total value of works executed and payments received in the last five years (in Rs. lac)
Billed upto date during 2023-24
MILESTONE STATEMENT
REPAIRS TO MUDHOL(B) MI TANK OF KAMALNAGAR TALUKA BIDAR DISTRICT
Sl. No. SR item No. & vol. No. SR Page No. Description Unit Total Milestone- 1 (for 1st month) Milestone- 2 (for 2 month) Milestone-3 (for 3 month) Milestone-4 (for 4 month) Milestone-5 (for 5 month) Milestone-6 (for 6 month) Milestone-7 (for 7 month) Milestone-8 (for 8 month) Milestone-9 (for 9 month) Total amount
Qnty Rate Amount Quantity Amount Quantity Amount Quantity Amount Quantity Amount Quantity Amount Quantity Amount Quantity Amount Quantity Amount Quantity Amount
1 1.14.2 vol 1 PWD 8 Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work..PWD SR VOL-I 2023-24 Item No.1.12, page 8 ) cum 4456.80 99.75 444,565.80 4456.80 444565.80 0 0.00 4456.80 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 444565.80
2 1.15.1 vol 1 PWD 8 Providing cohesive non-swelling ( CNS ) soil lining to canals using soil collected in heaps along the edge of canal requiring CNS soil lining as part of the disposal of excavated soil from canal excavation in CNS soil reach including cost of all machinery, labour, spreading in layers of thickness not more than 150 mm, breaking clods, levelling, watering, compacting to density control of not less than 95 percent or as stipulated, dressing to required profile and all other ancillary operations complete..WRD SR 2023-24 Item No.3.21 page 40) cum 1263.36 247.8 313,060.61 505.34 125224.24 505.34 125224 252.67 62612.12 1263.36 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 313060.61
3 2.37 vol IV A 29 Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete. complete with initial all leads and lifts.WRD SR VOL-IV 2023-24 Item No.3.27, page 51) Cum 477.60 6288.5 3,003,387.60 191.04 1201355.04 191.04 1201355 95.52 600677.52 477.60 3003387.60
4 3.3 vol IVA 6 Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. PWD SR VOL-I 2023-24 Item No.2.3 page 15). Cum 770.40 7185.26 5,535,524.30 308.16 2214209.72 308.16 2214210 154.08 1107104.86 770.40 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 5535524.30
5 1.8 vol IV B 19 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.(Item No.2.11 f Page No.18 of PWD Volume I Common SR for 2023-24). t 64.80 84819.00 5,496,271.20 25.92 2198508.48 25.92 2198508 12.96 1099254.24 64.80 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 5496271.20
6 2.1.3 vol 1 PWD 57 Providing and fixing 200 x 200 x 750 mm size top surface neatly dressed canal bed level stone including cost of all materials, labour, excavation, fixing in position to correct level and all other ancillary operations complete...WRD SR 2023-24 Item No.7.7 page 89) each 155.00 171.15 26,528.25 0 0.00 0.00 155.00 26528.25 155.00 26528.25
7 De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery, labour & all necessary works as directed and complete as per specification cum 3480.00 98.7 343,476.00 0.00 0 0.00 0.00 1,392.00 137390.40 1,392.00 137390.40 696.00 68695 3480.00 0.00 0.00 0.00 0.00 343476.00
8 1.14.1 vol 1 PWD 8 Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification sqm 537.5000 390.6 209,947.50 0.00 0 0.00 0.00 215.00 83979.00 215.00 83979.00 107.50 41990 537.50 0.00 0.00 0.00 0.00 209947.50
1 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.PWD SR VOL-I 2021-22 Item No.1.14, page 8 ) cum 229.50000 99.75 22,892.63 0.00 0 0.00 0.00 0.00 0.00 0 0.00 229.50 22892.63 0.00 0.00 229.50 22892.63
2 Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work..l(CSR VOL-1 ITEM NO 1.8 cum 2249.2500 497.7 1,119,451.73 0.00 0 0.00 0.00 0.00 0.00 0 0.00 2,249.25 1119451.73 0.00 0.00 2249.25 1119451.73
3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper gradeand camber, applying and brooming requisite type of screening/binding Materials to fill up the interstices of coarse aggregate,watering and compacting to the required density. 4.24 B (1)GRADING -I (63MM-45) Using Screening Crushable type such as Moorum or Gravel(PWD SR VOL-3 ITEM NO cum 302.8100 2272.2 688,044.88 0.00 0.00 302.81 688044.88 302.81 688044.88
4 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper gradeand camber, applying and brooming requisite type of screening/binding Materials to fill up the interstices of coarse aggregate,watering and compacting to the required density. GRADING -II (53MM-22.4MM) Using Screening Crushable type such as Moorum or Gravel(PWD SR VOL-3 ITEM NO 4.24 B (11) (A) cum 291.66 2198.7 641,272.84 0.00 0 0.00 0.00 0.00 0.00 0 0.00 291.66 641272.84 0.00 0.00 291.66 641272.84
1 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.PWD SR VOL-I 2021-22 Item No.1.14, page 8 ) cum 213.04 99.75 21,250.74 0.00 0 0.00 0.00 0.00 0.00 0 0.00 213.04 21250.74 0.00 0.00 213.04 21250.74
2 Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap /basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications cum 366.1 7054.61 2,582,692.72 0.00 0.00 0.00 0.00 183.05 1291346.36 183.05 1291346.36 366.10 2582692.72
3 Supplying P-2 Class R.C.C spun pipes ( safe for 4 kg / sqcm test pressure ) at pipe factory /sale depot including cost of all materials, machinery, labour, taxes, duties, levies, royalty etc.,as applicable with all lead and lifts. Rmtr 285 1566.6 446,481.00 0.00 0.00 142.50 223240.50 142.50 223240.50 285.00 446481.00
4 Laying and jointing P-2 / P-3 class R.C.C spun pipes true to line and level with perfect linking at joint including loading, unloading, rolling / lifting and lowering into trench, socket and spigot ends with soap solution, applying soft soap to spigot and spigot ends,cleaning inserting rubber sealing ring into correct position, jointing the pipes perfectly by jacking or other approved method, giving necessary hydraulic test at the specified pressure, cost of all jointing and water pressure testing materials, machinery, labour etc., complete with all lead and lifts Rmtr 285.00 339.15 96,657.75 0.00 0.00 142.50 48328.88 142.50 48328.88 285.00 96657.75
1 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.PWD SR VOL-I 2021-22 Item No.1.14, page 8 ) cum 466.20 99.75 46,503.45 0.00 99.75 46503.45 99.75 0.00 46503.45
2 Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications..PWD CSR VOL-I 2023-24Item No.2.4.1, page 24) cum 382.03 6643.35 2,537,959.00 0.00 382.03 2537959.00 382.03 0.00 2537959.00
3 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.(Item No.2.11 f Page No.18 of PWD Volume I Common SR for 2023-24). complete with all lead and lifts including loading and unloading charges as per the direction of the Engineer incharge of the work. t 7.2 84819 610,672.90 0.00 7.20 610672.90 7.20 0.00 610672.90
Total Rs 24,186,640.90
Sl No Itemes Total Qty 80% of Qty
1 1) Earth excation & Embankment EWE & Embankment Cum 12358.15 12358.15 9886.52
3 3) Concrete Cement concrete cum 1996.13 1996.13 1596.90
4 4) Steel steel tonne 72.00 72.00 57.60
Section Officer Asst. Executive Engineer Executive Engineer Executive Engineer
MI & GWD Sub Division, Bidar MI & GWD Division, Bidar MI & GWD Division, Bidar
REPAIRS TO MUDHOL(B) MI TANK OF KAMALNAGAR TALUKA BIDAR DISTRICT
Item No. EWE & Embankment #REF! Cement concrete M25-20mm d/s & PCC M10-40mm d/s in Cum Steel in tonne
Cum Sqm Cum Tonne
Tender period - 9 months
QTY. = Total qty. x 0.80
Executive Engineer
MI & GWD Division, Bidar
REPAIRS TO MUDHOL(B) MI TANK OF KAMALNAGAR TALUKA BIDAR DISTRICT
1st month 2nd month 3rd month 4th month 5th month 6th month 7th month 8th month 9th month
Mile stone -II 3775087.10 3775.09
Mile stone -III 5618744.29 5618.74 Liquid Assest =(APTx3)/period= = 14792809.51
Fin.turnover = 48373281.80
Executive Engineer
MI & GWD Division, Bidar
1 REPAIRS TO MUDHOL(B) MI TANK OF KAMALNAGAR TALUKA BIDAR DISTRICT
2 Indent No. MI/2025-26/CN/WORK_INDENT10088
3 Amount put to tender (APT) 24186640.90
5 Financial turnover
(2 times the estimated annual payment 48373281.80
APT/tender period)*9*2 48373281.80
6 Similar work (50% of the amount put to tender) 12093320.45
7 Period of completion (Tender period) 09months
8 Material (should have executed in any 1 year 80% of peak Annual rate of construction
Earthwork excavation,embakment in cum. 9,886.52
Cement concrete M25-20mm d/s & PCC M10-40mm d/s in Cum 1,596.90
Steel in tonne 57.60
9 Liquid assest / credit facilities cash flow for 3 months in the peak(in Lakhs) 147.93
10 Schedule - B Enclosed
11 Bid documents /contract data Enclosed
12 Price adjustment clauuse/Star rate G.O Appended in Bid document
Executive Engineer
MI & GWD Division, Bidar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW4 Conditions.xls
Instructions to Tenderers • 0.04 MB
bid document 10088.doc
Tender Document • 21.65 MB
forms and formats new 2022.xls
Others - Forms and formats • 0.08 MB
general_specifications_admin.pdf
Others - General condition • 0.20 MB
Mudhol Drawings.pdf
Others - Mudhol Drawings • 1.33 MB
10088 mudhol mile stone.xlsx
Others - Milestone • 0.07 MB
GO Exemption of machineries.pdf
Others - GO Exemption of machineries • 1.16 MB
detailed_specification.doc
Others - Detail specification • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .