| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.8 LAccepted-AOC 201 JITENDRA LODGE BUILDING 20 NEW JAGNATH PLOT RAJKOT | RAJKOT | RAJKOT | GUJARAT | ₹25.8 L | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹29.0 LRejected-Finance MORKANDA ROAD BALNATH NURANI TOWER 2ND FLOOR BLOCK NO 301 JAMNAGAR 361001 | JAMNAGAR | JAMNAGAR | GUJARAT | 361001 | ₹29.0 L | L2 | Rejected-Finance Other than Lowest bdder |
| 3 | L3₹30.2 LRejected-Finance MAHARAJA SOCIETY HAPA YARD ROAD NR ALFA PAN STREET NO 6 O S KALWADGET JAMNAGAR GUJ | ₹30.2 L | L3 | Rejected-Finance Other than Lowest bdder |
| 4 | L4₹30.3 LRejected-Finance | ₹30.3 L | L4 | Rejected-Finance Other than Lowest bdder |
| Sl No | Description | Qty | Unit | SHAM AND CO L2 | sanu enterprise L3 | badri glass and construction L4 | Quick Building Service L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Taking down chowkats or frames with shutters (without taking off shutters from the frame) each area exc 1.5 sqm but n.exc 4.0 sqm complete all as specified and as directed by Engineer-in-Charge | 16 | Each | 150 ₹2,400 | 300 ₹4,800 | 253 ₹4,048 | 121 ₹1,936 |
| 2.00 | Taking down chowkats or frames with shutters (without taking off shutters from the frame) each area n.exc 1.5 sqm complete all as specified and as directed by Engineer-in-Charge | 15 | Each | 100 ₹1,500 | 200 ₹3,000 | 153 ₹2,295 | 121 ₹1,815 |
| 3.00 | Taking down shutters of any description exc 1.0 sqm and nexc 2.0 Sqm each complete all as specified and as directed by Engineer-in-Charge | 29 | Per leaf | 100 ₹2,900 | 150 ₹4,350 | 110 ₹3,190 | 121 ₹3,509 |
| 4.00 | Taking down cement plaster on brick, stone or concrete surfaces including racking out joints hacking for keys scrubbing down with water etc. complete all as specified and as directed by Engineer-in-Charge | 292 | Sqm | 25 ₹7,300 | 50 ₹14,600 | 34 ₹9,928 | 41 ₹11,972 |
| 5.00 | Taking up or down steel tubing and connections bore of pipe 20 mm complete all as specified and as directed by Engineer-in-Charge | 72 | RM | 25 ₹1,800 | 30 ₹2,160 | 16 ₹1,152 | 11 ₹792 |
| 6.00 | Taking up or down steel tubing and connections including bore of pipe 25 mm complete all as specified and as directed by Engineer-in-Charge | 73 | RM | 25 ₹1,825 | 30 ₹2,190 | 16 ₹1,168 | 21 ₹1,533 |
| 7.00 | Dismantling exc 250 & n exc 500 ltrs water tanks and removing from site complete all as specified and as directed by Engineer-in-Charge | 2 | Each | 250 ₹500 | 500 ₹1,000 | 110 ₹220 | 116 ₹232 |
| 8.00 | Dismantling exc 500 & n exc 1000 ltrs water tanks and removing from site complete all as specified and as directed by Engineer-in-Charge | 3 | Each | 250 ₹750 | 1,000 ₹3,000 | 110 ₹330 | 121 ₹363 |
| 9.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and as directed by Engineer-in-Charge | 26.2 | Qtl | 250 ₹6,550 | 200 ₹5,240 | 753 ₹19,728.60 | 321 ₹8,410.20 |
| 10.00 | Dismantaling floor, hearth or wall tiling including cement mortar bedding(but not backing) removing servicable tiles to store and rubbish off premises.complete all as specified and as directed by Engineer-in-Charge | 190 | Sqm | 50 ₹9,500 | 50 ₹9,500 | 34 ₹6,460 | 41 ₹7,790 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
11 Apr 2026, 6:00 pmClosed
GE (A) JAMNAGAR
INFANTRY LINES JAMNAGAR
COMPREHENSIVE MAINTENANCE OF BUILDING (B/R) PORTION OF SEC C AT MIL STN JAMNAGAR
2026_MES_757251_1
8220
Open Tender
Civil Works
180 days
JAMNAGAR
AS PER TENDER DOCUMENTS
6 documents required · 6 mandatory
₹500
GE ARMY JAMNAGAR
₹70,000
16 Jun 2026
23 Mar 2026
13 Apr 2026
24 Mar 2026
11 Apr 2026
6 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Taking down chowkats or frames with shutters (without taking off shutters from the frame) each area exc 1.5 sqm but n.exc 4.0 sqm complete all as specified and as directed by Engineer-in-Charge | |||||
Taking down chowkats or frames with shutters (without taking off shutters from the frame) each area n.exc 1.5 sqm complete all as specified and as directed by Engineer-in-Charge | - | Each | - | - | |
Taking down shutters of any description exc 1.0 sqm and nexc 2.0 Sqm each complete all as specified and as directed by Engineer-in-Charge | - | Per leaf | - | - | |
Taking down cement plaster on brick, stone or concrete surfaces including racking out joints hacking for keys scrubbing down with water etc. complete all as specified and as directed by Engineer-in-Charge | - | Sqm | - | - | |
Taking up or down steel tubing and connections bore of pipe 20 mm complete all as specified and as directed by Engineer-in-Charge | - | RM | - | - | |
Taking up or down steel tubing and connections including bore of pipe 25 mm complete all as specified and as directed by Engineer-in-Charge | - | RM | - | - | |
Dismantling exc 250 & n exc 500 ltrs water tanks and removing from site complete all as specified and as directed by Engineer-in-Charge | - | Each | - | - | |
Dismantling exc 500 & n exc 1000 ltrs water tanks and removing from site complete all as specified and as directed by Engineer-in-Charge | - | Each | - | - | |
Dismantling wrought iron or mild steel work of any description not otherwise provided for complete all as specified and as directed by Engineer-in-Charge | - | Qtl | - | - | |
Dismantaling floor, hearth or wall tiling including cement mortar bedding(but not backing) removing servicable tiles to store and rubbish off premises.complete all as specified and as directed by Engineer-in-Charge | - | Sqm | - | - | |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
8220tender.pdf
Tender Documents • 1.44 MB
BOQ_848216.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid