Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC | ₹2.0 Cr | L1 | Accepted-AOC Work awarded to L1 bidder on 15.03.2026 on receiving approval |
| 2 | L2₹2.4 CrRejected-AOC | ₹2.4 Cr | L2 | Rejected-AOC L2 bidder |
| 3 | L3₹2.4 CrRejected-AOC | ₹2.4 Cr | L3 | Rejected-AOC L3 bidder |
| 4 | L4₹2.4 CrRejected-AOC | ₹2.4 Cr | L4 | Rejected-AOC L4 bidder |
| 5 | L5₹2.5 CrRejected-AOC | ₹2.5 Cr | L5 | Rejected-AOC L5 bidder |
| Sl No | Description | Qty | Unit | Sivankuttynair G L7 | N Anilkumar L5 | BIOHOMES PROJECTS PRIVATE LIMITED L4 | TELCON Infrastructures L3 | MATHEW B PALATHINKAL L2 | Fahad Marakkar P P L6 | U R RAJEEV L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. | 4,716.25 | Sqm | 14.98 ₹70,649.43 | 22 ₹1.0 L | 17 ₹80,176.25 | 18.94 ₹89,325.78 | 15 ₹70,743.75 | 5.9 ₹27,825.88 | 50 ₹2.4 L |
| 2.00 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyound 60 cm girth up to and including 120 cm girth. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. | 20 | Nos | 448 ₹8,960 | 2,618 ₹52,360 | 2,330 ₹46,600 | 417.28 ₹8,345.60 | 2,000 ₹40,000 | 1,180 ₹23,600 | 3,000 ₹60,000 |
| 3.00 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth up to and including 240 cm girth. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. | 10 | m³ | 9,251.87 ₹92,518.70 | 12,151 ₹1.2 L | 10,809 ₹1.1 L | 988.29 ₹9,882.90 | 6,800 ₹68,000 | 4,130 ₹41,300 | 5,220 ₹52,200 |
| 4.00 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. | 590.29 | Sqm | 330 ₹1.9 L | 256 ₹1.5 L | 347 ₹2.0 L | 404.1 ₹2.4 L | 380 ₹2.2 L | 413 ₹2.4 L | 920 ₹5.4 L |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. | 109.76 | m³ | 8,560 ₹9.4 L | 8,093 ₹8.9 L | 7,185 ₹7.9 L | 8,180.85 ₹9.0 L | 7,800 ₹8.6 L | 9,440 ₹10.4 L | 4,750 ₹5.2 L |
| 6.00 | Dry rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 ( 1 cement : 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) including cost of through stone and bond stone. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. | 259.31 | m³ | 7,612.78 ₹19.7 L | 6,000 ₹15.6 L | 6,379 ₹16.5 L | 5,490.5 ₹14.2 L | 6,600 ₹17.1 L | 4,248 ₹11.0 L | 4,000 ₹10.4 L |
| 7.00 | PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. | 900.06 | m³ | 674 ₹6.1 L | 172 ₹1.5 L | 152 ₹1.4 L | 32.94 ₹29,647.98 | 300 ₹2.7 L | 200.6 ₹1.8 L | 120 ₹1.1 L |
| 8.00 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with. As per the direction of engineer. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. | 481.57 | m³ | 8,815.68 ₹42.5 L | 8,500 ₹40.9 L | 8,417 ₹40.5 L | 7,686.7 ₹37.0 L | 8,500 ₹40.9 L | 7,788 ₹37.5 L | 9,674 ₹46.6 L |
| 9.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size) The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. | 76.6 | m³ | 9,100 ₹7.0 L | 11,188 ₹8.6 L | 10,613 ₹8.1 L | 9,882.9 ₹7.6 L | 11,100 ₹8.5 L | 11,210 ₹8.6 L | 10,300 ₹7.9 L |
| 10.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. | 237.44 | m³ | 10,726 ₹25.5 L | 11,188 ₹26.6 L | 12,796 ₹30.4 L | 9,773.09 ₹23.2 L | 12,900 ₹30.6 L | 10,620 ₹25.2 L | 6,226 ₹14.8 L |
Tender Value
₹2.5 Cr
EMD Value
₹1 L
Closing Date
17 Feb 2026, 5:00 pmClosed
CEO Technopark
Park Centre, Technopark Phase 1 Campus
Construction of compound wall
2026_ETPK_831156_1
ETPK/TC/242/2025-26
Open Tender
Civil Works - Others
150 days
Technocity campus
As mentioned in Bid1 document
4 documents required · 4 mandatory
₹8,850
₹1 L
Park Centre, Technopark Phase 1 Campus
18 Mar 2026
28 Jan 2026
18 Feb 2026
28 Jan 2026
17 Feb 2026
2 Feb 2026
2 Feb 2026
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyound 60 cm girth up to and including 120 cm girth. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth up to and including 240 cm girth. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Dry rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 ( 1 cement : 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) including cost of through stone and bond stone. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with. As per the direction of engineer. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size) The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo - Mechanically Treated bars. As per the direction of engineer. All work upto plinth level The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo - Mechanically Treated bars. As per the direction of engineer. All work Above plinth level. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Centering and shuttering including strutting, etc. and removal of form for: Lintels, beams, plinth beams, girders bressumers and cantilevers. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Centering and shuttering including strutting, etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts. The rate inclusive of all material charge, labour, transportation, Shoring, Scaffolding (If need) loading/unloading at the work space etc for all heights, complete as per the direction of engineer in charge.
Hollow block masonry using pre cast blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part 1 of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. As per the direction of engineer. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
12 mm cement plaster of mix 1:6 (1 cement : 6 fine sand) The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used. As per the direction of engineer in charge. With G.I. barbed wire. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to given an even shade. As per the direction of engineer in charge. New work (two or more coats) including coat of approved steel primer but excluding a coat of mordant solution. As per the direction of engineer in charge. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge.
Structural steel work riveted, bolted or welded in GI built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (Including the cost of rolling wheel, Monky lock, Handil, Wheel Track & Locking piece etc complete.). For gate work. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/ Unloading at the work space etc complete as per the direction of engineer in charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_1396459.xls
BOQ • 0.40 MB
Bid1.pdf
Tender Documents • 1.53 MB
Locationlayout.pdf
Other Document • 0.68 MB
Download all tender documents and submit your bid