| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.7 LAccepted-Finance | ₹3.7 L | 1 | Accepted-Finance L1 |
| 2 | 2₹3.7 LRejected-Finance | ₹3.7 L | 2 | Rejected-Finance L2 |
| 3 | 3₹3.8 LRejected-Finance | ₹3.8 L | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Bharat Engg and Suppliers L1 | KESAR SINGH L3 | Nishant Puri Govt Contractor L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. in earth work in all lead and lifts in all kinds of soil such as pick work, jumper work, blasting work in soft/hard rock chiseling/wedging out of rock) where blasting is prohibited saturated soil including bailing/pumping out of water stacking the excavated soil in 15cm layers, when required into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | 8.8 | Cum | 425 ₹3,740 | 450 ₹3,960 | 450 ₹3,960 |
| 2.00 | Providing and laying cement concrete 1:4:8 (1cement:4sand:8 graded stone agg. 40mmnominal size) and curing complete incuding the cost of form work in foundation and plinth in all depths and to the entire satisfaction of the Engineer-in-charge. | 3.82 | Cum | 8,800 ₹33,616 | 9,000 ₹34,380 | 7,800 ₹29,796 |
| 3.00Providing and laying cement concrete 1:1.5:3 (1cement: 1.5 sand:3 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :- | ||||||
| 3.01 | Foundation footings base of columns and the like and mass concrete and to the entire satisfaction of the Engineer-in-charge. | 19.26 | Cum | 12,250 ₹2.4 L | 12,500 ₹2.4 L | 12,500 ₹2.4 L |
| 4.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor two ceiling not exceeding 4 mtr and removal of the same for in-situ reinforced concrete and plain concrete working:- | ||||||
| 4.01 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pilasters buttresses, plinth and string courses and the like and to the entire satisfaction of the Engineer-in-charge. | 46.8 | Sqmt | 450 ₹21,060 | 480 ₹22,464 | 450 ₹21,060 |
| 5.00 | Providing laying of tor steel reinforcement for RCC work including bending binding cutting and placing in position complete in all depths and heights and to the entire satisfaction of the Engineer-in-charge. | 794.2 | P/kg | 98 ₹77,831.60 | 100 ₹79,420 | 100 ₹79,420 |
Tender Value
₹3.2 L
EMD Value
₹6,325
Closing Date
2 Dec 2025, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
Providing Lift Irrigation scheme to G.P Malyouar Bhatoli and Baloh from Satluj river in Tehsil Ghumarwin District Bilaspur (SH Construction of 3 Nos foundation blocks for pumping machinery 100 HP and 2 Nos. 40 HP).
2025_HPIPH_120858_6
BLP-BLP-0736-NIT No. 10564-665 Dated 18/11/2025
Open Tender
Civil Works
60 days
Sub Division Kandrour Section Harlog
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
₹6,325
12 Dec 2025
20 Nov 2025
2 Dec 2025
20 Nov 2025
2 Dec 2025
20 Nov 2025
Amount
Excavation in foundation and trenches etc. in earth work in all lead and lifts in all kinds of soil such as pick work, jumper work, blasting work in soft/hard rock chiseling/wedging out of rock) where blasting is prohibited saturated soil including bailing/pumping out of water stacking the excavated soil in 15cm layers, when required into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in all leads and lifts and to the entire satisfaction of the Engineer-in-charge.
Providing and laying cement concrete 1:4:8 (1cement:4sand:8 graded stone agg. 40mmnominal size) and curing complete incuding the cost of form work in foundation and plinth in all depths and to the entire satisfaction of the Engineer-in-charge.
Providing and laying cement concrete 1:1.5:3 (1cement: 1.5 sand:3 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :-
Foundation footings base of columns and the like and mass concrete and to the entire satisfaction of the Engineer-in-charge.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor two ceiling not exceeding 4 mtr and removal of the same for in-situ reinforced concrete and plain concrete working:-
Vertical surfaces such as walls (any thickness) partitions and the like including attached pilasters buttresses, plinth and string courses and the like and to the entire satisfaction of the Engineer-in-charge.
Providing laying of tor steel reinforcement for RCC work including bending binding cutting and placing in position complete in all depths and heights and to the entire satisfaction of the Engineer-in-charge.
Nishant Puri Govt Contractor (BID ID -589361)
KESAR SINGH (BID ID -589311)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
PWD8.pdf
Tender Documents • 1.43 MB
Termsandconditions.pdf
Tender Documents • 0.17 MB
PWD6.pdf
Tender Documents • 0.40 MB
BOQ_177186.xls
BOQ • 0.22 MB