Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹21.0 LAccepted-AOC FLAT NO A 1108 TOWER P 2 ASHIYANA PALM COURT RAJNAGAR EXTENSION GHAZIABAD UP | GHAZIABAD | UTTAR PRADESH | 201001 | L-1 | Accepted-AOC Work awarded | |
| 2 | L-2₹21.8 L+₹78,964.94 (3.77%)Rejected-Finance | L-2 | Rejected-Finance Due to higher rate | |
| 3 | L-3₹22.2 L+₹1.2 L (5.73%)Rejected-Finance WARD NO 3 OLD BANGALI COLONY KICHHA U S NAGAR | L-3 | Rejected-Finance Due to higher rate |
Tender Value
Refer Docs
EMD Value
₹66,000
Closing Date
7 Sept 2022, 11:00 amClosed
Superintending Engineer
Electricity Distribution Circle, Rudrapur
Dismantling of 11 KV XLPE AB cable and relaying by separation after maintenance at 11 KV Transit Camp and Kheda Feeder related to 33/11 KV S/s Matkota under Electricity Distribution Division, Rudrapur-I
2022_UPCL3_48270_1
EDC(USN)63/2022-23
Open Tender
Electrical Works
Item Rate
90 days
Rudrapur
Pl Refer tender documents.
3 documents required · 3 mandatory
₹1,180
SE EDC Rudrapur
₹66,000
21 Jul 2023
24 Aug 2022
8 Sept 2022
24 Aug 2022
7 Sept 2022
24 Aug 2022
Amount
Annexure-A (LABOUR CHARGES)
Cartage of SP-55 Pole including Loading /Unloading from store centre at Haldwani/Rudrapur/Kashipur to work site (Distance 0 to 70 KM).
Cartage of small material with conductor including Loading /Unloading from store centre at Haldwani/ Rudrapur /Kashipur to work site (Distance 0 to 70 KM).
Head load Cartage of SP-55 Pole from road to work site upto 0-1 Km distance including loading/unloading.
Head load Cartage of small material with conductor from road to work site upto 0-1 Km distance including loading/unloading.
Charges of bracking RCC road top at pole pit by hammer drill including provding all T&P complete as per direction of Engineer in charge.
Charges of Excavation of earth for SP-55 pole pit size 0.9*0.6*1/6 of pole length as per RESPO Spn. & instruction of Engineer In Charge (0.99x65 cum) as per direction of Engineer in charge.
Charges of Erection of structure of S.P.55 Pole complete in all work as per direction of Engineer in charge.
Charges of Grouting of SP-55 Pole in size 0.45*0.45*1/9 of pole length by cc in ratio 1:4:8 and proper back filling as per RESPO Spn. & instruction of Engineer In Charge
Charges of Muffing of new ST SP 55 Poles with CC 1:2:4 block and 45 cm height from ground level including cost of required material as ballast, cement, sand etc complete in all respect as per direction of work incharge.
Charges of painting of SP-55 poles 2 coat of primer & 1 coat of al. paint as per norms & direction of Engineer in charge.
Charges of Fabrication of MS channel 100x50 mm /angle 65x65x6 mm (supplied by the department) with cutting, drilling holes and fabrication charges as required by Engineer in charge for proper completion
Charges of fixing of triangular bracket 11 KV line as required by Engineer in charge for proper completion
Charges for dismentling of existing 11 KV XLPE cable 240 sqmm safely without any damage with the help of rope, pully etc as per direction of Engineer in charge.
Charges for opening seperately of existing 11 KV XLPE cable 240 sqmm safely without any damage as per direction of Engineer in charge.
Charges of Laying of 11 KV XLPE cable after opening of insulator including binding and jointing by PG clamp in all complete work as per direction of Engineer-In-Charge.
Charges of Laying of 11 KV line on ACSR Rabit condcutor in all complete work as per direction of Engineer-In-Charge.
Charge of Erection of M.S. Earthing rod 20x2500mm connecting support with G.I.Wire no.6/8 S.W.G. as per RESPO specification & as per direction of Engineer in charge.
Charges of Erection of stay set 16x1800mm. pit size 0.6x0.9x1.2 Mtr. including excavation of earth as per direction of Engineer in charge.
Charges of Grouting of stay in ratio 1:4:8. (1 cemant:4 graded stone 20mm,8 course sand) including cost of cemant,sand & stone blast back filling soil bolder in pit etc. (0.108 cum each) as per RESPO specification & as per direction of Engineer in charge.
Charges of fixing and filling of 11 KV XLPE cable H.S. jointing kit over joints including fixing of PG clamp as per direction of Engineer in charge.
Annexure-B (SUPPLY ITEMS)
Supply of PP clamp with nut and bolts for SP-55 Pole.
Supply of Bracing clamp with nut and bolts for SP-55 Pole.
Supply of PP clamp with nut and bolts for PCC Pole 9 mtr long.
Supply of Bracing clamp with nut and bolts for PCC Pole.
Supply of X-arm clamp with nut and bolts.
Supply of PG clamp for joints of cable.
Supply of Stay Insulator .
Supply of 11 KV H.S. Jointing kits.
J AND J COMPANY
NUTECH POWER CONTROL
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .