Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical Disqualified | |
| 3 | Rejected-Technical N A | - | Rejected-Technical Disqualified | |
| 4 | Rejected-Technical | - | Rejected-Technical Disqualified | |
| 5 | Rejected-Technical VILLAGE KAIRWAN KARANPUR PO RAJPUR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | - | Rejected-Technical Disqalified |
Tender Value
₹35.5 L
EMD Value
₹71,000
Closing Date
7 Jan 2023, 5:00 pmClosed
Executive Engineer
Office of Executive Engineer Construction Division UKPJN Mussoorie
Construction of Source work Clear Water Reservoir CWR supplying, carting laying and jointing of GI Pipe line and other appurtenant works under Kolthiyana Water Supply Scheme of Block Raipur District Dehradun
2022_MDPEY_52688_2
Letter No. 2854/135/189 Dated 09.12.2022
Open Tender
Civil Works
Item Rate
270 days
Dehradun
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
Executive Engineer Construction Division UKPJN
₹71,000
Dehradun
26 Jun 2025
27 Dec 2022
9 Jan 2023
27 Dec 2022
7 Jan 2023
28 Dec 2022
28 Dec 2022
Amount
Construction of RCC Boulder Filled Gallery (Min. Size : 6 m wide which may vary as per actual site conditions) as per Design & Drawing including supply of all materials, labour, T&P etc. required for proper completion of work.
Construction SCC cum Roughing Filter as per Type Design of 1.0m x 1.0m x 1.54m (Minimum internal size) including supply of all materials, labour, T&P etc. required for proper completion of work.
Providing, Supply and Carting, laying jointing (including cost of jointing materials like white lead, hemp and oil etc.) fixing and testing of M.S. galvanised screwed and socketed pipes (medium quality) specials and fittings, including cutting and refilling etc. (G.I. (Medium) )
Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajari and boulders and rest 25% will be in medium rock
Soil mixed with Shingle, Bajri and Boulders
Medium Rock
Supply of all materials, labour, T & P etc and construction of Wheel Valve chamber as per type design (Size :- 0.6 m x 0.6 m x 0.75m)
Supply of all materials, labour, T & P etc and construction of Air Valve chamber as per type design (Size :- 0.6 m x 0.6 m)
Supply of all materials, labour and T & P etc. and construction of semi sunk R.C.C. Sump / Top Reservoir of following Capacity in K.L. as per type design and drawing including fixing of pipes and fittings including cartage of materials etc. complete
Supply and installation of Bucket Type Chlorinator of 25 L Capacity on the top of Service Reservoirs
RR Stone Masonry 1:6 including supply of all materials, labour, T&P etc. complete
RR Stone Masonry laid dry including supply of all materials, labour, T&P etc. complete
PCC 1:4:8 in Cement, Coarse Sand & 40mm Graded Stone grit laid in required position including supply of all materials, labour, T&P etc. complete.
PCC 1:2:4 in Cement, Coarse Sand & 20mm Graded Stone grit laid in required position including supply of all materials, labour, T&P etc. complete
Mahipal Singh Bisht
A V ENTERPRISES
Bharu Singh Chauhan
SAKLA NAND LAKHERA
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_64748.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .