Loading…
Loading…
Tender Value
₹5.6 L
EMD Value
₹56,400
Closing Date
8 Sept 2026, 5:00 pm
PO Duda Bahraich
Duda Office Bahraich
Ward No 13 Sachauli me Shiv Mandir se Sri Munna ke ghar Hote Hue Premchandra ke ghar tak Interlocking Road and Nali Nirman
2026_SUDA_1178015_1
389/Duda/Nirman/2025-26 Dated 13.08.2026
Open Tender
Civil Works
Percentage
180 days
Bahraich
As Per NIT
2 documents required · 2 mandatory
₹724
Yes
Duda
₹56,400
Yes
19 Aug 2026
19 Aug 2026
9 Sept 2026
19 Aug 2026
8 Sept 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in excavation in foundation ordinary soil 1.5mtr. Lift and 30mtr. Lead including all complete. As Per SI No. 251. | 33.6 | Cum | 125 | ₹4,200 |
| 2 | E/W in cutting or filling in embankment with ordinary soil including ramming dressing etc complete including 2 km cartage earth. As Per SI No. 253. | 36 | Cum | 215.7 | ₹7,765.2 |
| 3 | P/L C.C. 1:5:10 cement fine sand mortar and 40mm gauge brick ballast. Including supply of all materials, labour, T&P etc complete. As Per SI No. 274. | 7.04 | Cum | 4,300 | ₹30,272 |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per (MORD) Technical Specification Clause 401. | 12 | Cum | 4,161.7 | ₹49,940.4 |
| 5 | Ist Class B/W in 1:4 Cement, Coarse sand Mortar including supply of all labour, material T&P etc complete. As Per SI No. 305(b). | 20.03 | Cum | 6,000 | ₹1,20,180 |
| 6 | C.C. in 1:2:4 Cement, C/Sand & Approved stone ballast including supply of all materials, labour, T&P etc complete. SI No. 279 (b) | 2.21 | Cum | 9,100 | ₹20,111 |
| 7 | 12mm thick Cement Plaster 1:3 cement and coarse sand including all labour, material T&P etc complete As Per S.I. No. 583. | 88 | Sqm | 215 | ₹18,920 |
| 8 | R.C.C. work 1:2:4 cement C/sand and 20mm gauge S/grit with centering shuttering and supply of all materials, labour T&P etc complete.SI No. 284. | 6.08 | Cum | 10,000 | ₹60,800 |
| 9 | Mild Steel in Plain work such as reinforced concrete or reinforced brick work (when not included in an over all rate) wrought to required shape as necessary including bending for the proper completion of the work. As Per SI No. 504. | 4.77 | Qtl. | 6,150 | ₹29,335.5 |
| 10 | P/L of 80mm thick Red Colour Rubber Moulded Zig-Zag Reflective interlocking Tiles with sand filling including supply of all materials labour & T&P etc all complete. | 60 | Sqm | 994 | ₹59,640 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_2213544.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].