Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.9 L
Closing Date
8 Oct 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer REW Ganderbal
Executive Engineer REW Ganderbal
Improvement/Construction of field channel from baba canal watshan H/o Noor Mohd Rather to Onwards Zadibagh at Halqa Manigam A Block LAR Under PRI Grants Capex Budget
2021_RDPR_141079_4
e-nit no 83/2022-21
Open Tender
Civil Works
Item Rate
30 days
RD and PR Ganderbal
as per nit
2 documents required · 2 mandatory
₹200
Yes
Executive Engineer REW Ganderbal
Exempted
9 Oct 2021
24 Sept 2021
9 Oct 2021
24 Sept 2021
8 Oct 2021
24 Sept 2021
120 days
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
P/L, of Stone soling hand packed with ramming, dressing, watering and compacting all inclusive leads, lifts, loading, un-loading, cost and carriage of material involved complete.
CEMENT CONCRETE (CAST-IN-SITU) P/L, in position cement concrete of specified grade excluding the cost of centering & shuttering. All works up to required level in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)(Crushed) and using 20% plums all inclusive incl. carraige complete.
FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete.all inclusive incl. carraige complete.
FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for:Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. all inclusive incl. carraige complete.
CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) Including all sorts of Carriages
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 30 cm girth upto and including 60 cm girth. Including All carriages All complete Job as desired.
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth. Including All carriages All complete Job as desired.
Supply and Laying of RCC Spun Pipes fro Cross Drainage Purposes at Required Spot 18" Dia. Including Including All carriages All complete Job as desired.
Providing / Installation / Fabrication of Sign board 3' and 2' ,2mm MS Sheet ,angle iron from 50*50*6 mm thick, 5' height above Ground in Pcc 1:2:4 Mix
FAROOQ AHMAD RATHER
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .