Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st Rank₹1.9 LAccepted-AOC PULININNA KALLAMPOTTA BUNGLOW PARANIYAM ARUMANOOR POOVAR P O | 1st Rank | Accepted-AOC 1st rank | |
| 2 | Rejected-Technical | - | Rejected-Technical 2nd Rank |
| Sl No | Description | Qty | Unit | PRAKASH N V L1 | R SELVARAJ L2 |
|---|---|---|---|---|---|
| 1.00Desilting | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1,000 | sqm | 13.91 ₹13,910 Lowest | 14.5 ₹14,500 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 110.16 | cum | 197.1 ₹21,712.54 Lowest | 205.41 ₹22,627.97 |
| 1.00 | OD17564/2025-2026:For engaging collies for removing waste meterials from cut & cover | 23 | Day | 827.94 ₹19,042.62 Lowest | 862.85 ₹19,845.55 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 11.09 | cum | 7,066.19 ₹78,349.91 Lowest | 7,364.15 ₹81,653.7 |
| 1.00 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 216 | sqm | 263.02 ₹56,812.32 Lowest | 274.12 ₹59,209.92 |
Tender Value
₹2.5 L
EMD Value
₹6,341
Closing Date
5 Nov 2025, 11:00 amClosed
Assistant Executive Engineer
O/o the Assistant Executive Engineer, Channel Sub Division, Neyyattinkara
GENERAL-NIP-Action plan-2025-26- Desilting and Maintenance of Cut ramp Cover
2025_Irrig_818214_1
IRR/IA/EST/4355/2025_5_1_1
Open Tender
Civil Works - Canal
Item Rate
Neyyattinkara
Please refer Tender documents.
2 documents required · 2 mandatory
₹560
₹6,341
22 Jan 2026
1 Nov 2025
6 Nov 2025
1 Nov 2025
5 Nov 2025
1 Nov 2025
Amount
Desilting
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD17564/2025-2026:For engaging collies for removing waste meterials from cut & cover
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
R SELVARAJ (BID ID -2427563)
Bidder Name
R SELVARAJ
PRAKASH N V
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1371175.xls
BOQ • 0.30 MB
bid4355.pdf
Tender Documents • 1.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .