Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹3 L
Closing Date
23 Jun 2026, 2:30 pm
Director PNRD BTC Kokrajhar
Director PNRD BTC Kokrajhar
DPRD/BTC/6th ASFC/DG/XII/Udl-24/2026/7
2026_BoTC_52574_1
DPRD/BTC/6th ASFC/DG/XII/Udl-24/2026/7
Open Tender
Civil Works - Building
730 days
Udalguri
Refer to Bid Document
4 documents required · 4 mandatory
₹3,000
₹3 L
Yes
2 Jun 2026
2 Jun 2026
24 Jun 2026
2 Jun 2026
23 Jun 2026
2 Jun 2026
2 Jun 2026 - 23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | GROUND FLOOR : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth leadupto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.2.6.1 All kinds of soil. | 144 | Cu.m | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 6 | Sqm | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22C.1 Thermo-Mechanically Treated bars of grade Fe-500D or more | 18,923.4 | Kg | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | FORM WORK :
Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 : Foundations, footings, bases of columns, etc. for mass concrete | 171.89 | Sqm | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | 5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts | 130.44 | Sqm | - | - | - |
| 6 | 5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | 449.2 | Sqm | - | - | - |
| 7 | 5.9.19 Weather shade, Chajjas, corbels etc., including edges | 22.59 | Sqm | - | - | - |
| 8 | 5.9.3 Suspended floors, roofs, landings, balconies and access platform | 410.72 | Sqm | - | - | - |
| 9 | 5.9.7 Stairs, (excluding landings) except spiral-staircases | 24.19 | Sqm | - | - | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural
sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 122.83 | Cu.m | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
SBD_1.pdf
Tender Documents • 1.57 MB
BOQ_83058.xls
BOQ • 0.33 MB
FOB_4.pdf
Additional Documents • 0.12 MB
Download all tender documents and submit your bid