Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | ₹3.4 L | L1 | Accepted-AOC accepted |
| 2 | L2₹3.8 L+₹45,038 (13.3%)Rejected-AOC | ₹3.8 L+₹45,038 (13.3%) | L2 | Rejected-AOC not accepted |
Tender Value
₹3.8 L
EMD Value
₹3,813
Closing Date
7 May 2026, 5:00 pmClosed
EO
Basudevpur Municipality
Construction of Welcome gate at MCC ward no.05
2026_ORULB_128470_3
BSP_2026-27_04_02
Open Tender
Civil Works - Others
Percentage
45 days
Basudevpur Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹3,813
Yes
9 Sept 2026
28 Apr 2026
8 May 2026
28 Apr 2026
7 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Single under reamed pile foundation with RCC M20 using 12mm size black hard granite (Crusher broken) stone chips including cost of boring but excluding cost of M.S./Tor steel and labour charges for cutting, bending and binding of steel.
Single under ream pile | 4 | nos | 3,539.79 | ₹14,159.16 |
| 2 | Earth Work in exavation of foundation in hard soil within initial leads of 50m & lifts of 1.5m including dressing and levelling of bed etc. and adding contractor's profit and over head charges, etc. complete in all respect | 1.94 | cum | 276.89 | ₹537.72 |
| 3 | Supplying & filling foundation and plinth with Fine sand well watered and rammed including cost, cost of all labour, carriage, royalty, etc complete. | 0.97 | cum | 1,475.34 | ₹1,434.03 |
| 4 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. | 0.65 | cum | 6,773.74 | ₹4,389.38 |
| 5 | Brick work with Fly ash Bricks 25cm x 12cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Foundation and Plinth including watering curing, cost of carriage and royalty of all materials, cost of all labour, etc complete. | 1.43 | cum | 5,758.31 | ₹8,205.59 |
| 6 | R.C.C work of M-20 grade incl.centering &shuttering etc. complete in all respect. Column | 8.1 | cum | 16,322.94 | ₹1,32,215.81 |
| 7 | Pile cap | 2.03 | cum | 7,060.07 | ₹14,296.64 |
| 8 | Roof beam & Top slab | 0.79 | cum | 14,308.01 | ₹11,331.94 |
| 9 | Providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge and cost and carriage of steel. etc. complete. | 14.7 | qtl | 8,315.51 | ₹1,22,241.32 |
| 10 | 12mm.th. C.P.(1:6) on brick work. | 51.84 | sqm | 200.65 | ₹10,401.7 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_588753.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_588753.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .