Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹25.3 L
EMD Value
₹50,000
Closing Date
15 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Assistant Executive Engineer
Substation Subdivision Ernakulam pin 682 031
Construction of 11kV cable trench and cover slabs at 66kV Substation Njarakkal
2026_KSEB_891454_1
E tender 01/ AEE SSD EKM /26-27/23.11.2026
Open Tender
Civil Works - Others
Percentage
120 days
66kV Substation Njarakkal
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
₹50,000
24 Nov 2026
24 Nov 2026
18 Dec 2026
26 Nov 2026
15 Dec 2026
27 Nov 2026
26 Nov 2026 - 15 Dec 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil (cost index(c) : 1.4445 included in Rate) | 260 | cum | 257.63 | ₹66,982.76 |
| 1.02 | 2.16.1 : Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m (cost index(c) : 1.4445 included in Rate) | 305 | Sqmm | 166.65 | ₹50,828.86 |
| 1.03 | 50.2.3.1. Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete (cost index(c) : 1.4445 included in Rate) | 100 | Hrs | 345.54 | ₹34,553.88 |
| 1.04 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) (cost index(c) : 1.4445 included in Rate) | 20 | Cum | 7,932.89 | ₹1,58,657.81 |
| 1.05 | 5.33.1 : Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:-Cement content considered in this item is @ 330 kg/ cum.
Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level (cost index(c) : 1.4445 included in Rate) | 76 | cum | 10,889.58 | ₹8,27,608.07 |
| 1.06 | 5.35 : Add for using extra cement in the items of design mix over and above the specified cement content therein (cost index(c) : 1.4445 included in Rate) | 25.08 | Qtl | 863.33 | ₹21,652.42 |
| 1.07 | 5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete (cost index(c)
: 1.4445 included in Rate) | 630 | Sqmm | 386.16 | ₹2,43,279.67 |
| 1.08 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more (cost index(c) : 1.4445 included in Rate) | 5,350 | Kg | 112.43 | ₹6,01,475.89 |
| 1.09 | 13.1.1:12mm cement plaster of mix:1:4 ( 1 Cement: 4 fine sand) cost index ©: 1.4445 included in Rate) | 470 | Sqmm | 369.76 | ₹1,73,788.61 |
| 1.1 | 2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5
m. (cost index(c) : 1.4445 included in Rate) | 62 | Cum | 318.45 | ₹19,744.18 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
TenderSpecification.pdf
Tender Documents • 0.96 MB
GCC.pdf
Other Document • 1.40 MB
BOQ_1525280.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .