Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹1.9 LAccepted-AOC | 1ST | Accepted-AOC FIRST LOWEST QUOTED RATE | |
| 2 | 2 ND₹2.2 L+₹23,130.40 (11.9%)Rejected-AOC | 2 ND | Rejected-AOC SECOND LOWEST QUOTED RATE | |
| 3 | 3RD₹2.5 L+₹59,813.14 (30.8%)Rejected-AOC | 3RD | Rejected-AOC THIRD LOWEST QUOTED RATE |
Tender Value
₹2.0 L
EMD Value
₹4,992
Closing Date
22 Oct 2022, 6:00 pmClosed
ASSISTANT ENGINEER
Assistant Engineer LID And EW Section Mala GP
Construction of Temporary bund for prevention of saline water in various places
2022_LSGD_515420_1
135/23
Open Tender
Civil Works - Others
Item Rate
330 days
MALA GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
₹4,992
21 Nov 2022
13 Oct 2022
26 Oct 2022
13 Oct 2022
22 Oct 2022
13 Oct 2022
Amount
Temporary bund
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
OD108252/2022-2023:Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete
OD111345/2022-2023:Putting up ring bund having top width 1.0m, bottom width 1.20 m and average height of 1.20m using bamboo post of 1.70m long 100mm dia driven 50cm below bed level at 60cm c/c vertical spacing, 1/3rd split bamboo reapers fitted horizontally at 30cm c/c, bamboo cross ties at 100cm c/c, side screening with plaited coconut cadjan madals including coir yarn for tying inclusive of all labour charges and filling with own earth between screening in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming & watering and maintaining the bund leak proof for the maintaining period including labour for dismantling the bund after completion of the work etc. complete as per direction
OD97585/2022-2023:Engaging labour
SIJAN GEORGE
NIVIN K.D
Bidder Name
SIJAN GEORGE
Devassykutty C.V
NIVIN K.D
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_739122.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .